An indoor sports stadium has 5.000 seats in two rings:
■The stadium has a ceiling height of 72 feet (22 m).
■There is a catwalk around the perimeter of me stadium that is 54 feet (13 m) from me floor.
■There are two scoreboards at either end of the stadium
■The construction of the stadium is concrete and steel.
The customer has indicated a preference for overhead coverage, and the wireless network should support 3500 concurrent
clients. The architect plans to install the APs on the catwalk to service sections of the floor below
Which type or antennas are recommended for the APS that provide the overhead coverage?
Refer to the exhibit.
A hotel needs a wireless solution, i he hotel has 802.3af switches.
The architect has selected the 505H Series, controlled by a local MC as the best choice The 5QoH series will need to power a connected phor
which have only a single Ethernet port. The architect has created the BOM shown in the exhibit. (Note that this portion of the BOM does not inc
Which correction should the architect make?
Refer to exhibit.
A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?
What is one customer requirement that can drive the need for a relatively dense AP deployment. In which ire coverage areas of at least three AP radios overlap?
A network architect needs to plan quality of service (QoS) for a hospital network.
Which of these applications should receive the highest priority?
Refer to the exhibit.
A company needs a new wireless solution for its multi-site network. All branch sites must connect to the main site through
secure tunnels over the Internet. The customer requires full redundancy for the Mobility Controllers (MC). Including
stateful faiEoverand seamless roaming for the main site.
The architect plans to propose:
- 500 RAPS
- 100 APs at the main campus
- two 7205 MCs
- two 7210 MCS
- one MM appliance
The exhibit snows the existing wired network at the main site, which has a single building with two large floors.
Following the best-practices on design, performance and security, where should the architect plan to connect the MCs?
{Potential locations are numbered in the exhibit.)