Questions 4

Which of the following factors influence the scheduling of internal processing activities? Note: There are 3 correct answers to this question

Options:

A.

An activated Scheduling indicator in the control key of the internal processing activity

B.

Whether the work for the internal activity is greater than its duration

C.

The unit (for example, hour, day) of the field Normal Duration field of the activity

D.

The relationships between activity elements

E.

The factory calendar in the work center used for the internal processing activity

Buy Now
Questions 5

Which planning method can prevent further rescheduling of activities?

Options:

A.

Partial confirmation of activities

B.

Capacity requirements activation

C.

Capacity levelling

D.

Workforce planning

Buy Now
Questions 6

You want to establish costing for WBS. Costing should be easy to use and should not refer to cost elements. What method for costing do you use?

Options:

A.

Unit costing for WBS

B.

Easy Cost Planning (ECP) for WBS

C.

Detailed planning for WBS

D.

Planning of overall values

Buy Now
Questions 7

Cost and budget

A customer works in a multinivel production environment with bill of material and routing. To avoid unnecessary stock cost , they do

not want to produce..

Which setup do you recommend?

Options:

A.

Assign a sales order to a project with appropriate hierarchy levels.

B.

Assign a network to a sales order

C.

Assign Several production orders to a sales order

D.

Assign One production order to a sales order

Buy Now
Questions 8

Resources

How can you define external task in your project.

Note : there are 2 correct answers for this question.

Options:

A.

Assign a purchase order for external processing to the project definition.

B.

Create an external activity in a network.

C.

Create a service milestone.

D.

Create a service activity in a network.

Buy Now
Questions 9

When you create a service activity in your network, what data can be entered? Note: There are 3 correct answers to this question.

Options:

A.

Service specification

B.

Overall limit (maximum value of all unplanned services)

C.

Service purchase order number

D.

Material master within service specification

E.

Vendor

Buy Now
Questions 10

You used reductions to reduce the scheduled duration of all internally-processed activities in your project. However, the duration did not changed after overall network scheduling. What do you check? Note: There are 2 correct answers to this question

Options:

A.

If the maximum reduction level is less than 100

B.

If the reduction strategy is set in the network header

C.

If the reduction strategy is set in each activity

D.

If the appropriate reduction type is set in the parameters for network scheduling

Buy Now
Questions 11

Project Structure

Your customer has implemented budgeting for projects. The current budget of their projects has been changed several times. Therefore they want to get an overviews of the budget updates.

What standard report do you recommend?

Options:

A.

Structure overviews for budget.

B.

Cost element report on budget updates.

C.

Line item report for budget

D.

Hierarchical report on budget updates.

Buy Now
Questions 12

Which of the following apply to dynamic item processor (DIP)? Note: There are 3correct answers to this question.

Options:

A.

Usage of cost elements is mandatory

B.

Sales prices are maintained in the DIP profile

C.

DIP is used to create a quotation

D.

Sources can be based on line items

E.

Material determination is mandatory

Buy Now
Questions 13

How can you search in the structure overview based on the user status? Note: There are 2 correct answers to this question

Options:

A.

By searching for the status profile

B.

By searching via status selection profile

C.

By searching via status combination code

D.

By searching for the individual status

Buy Now
Questions 14

Which report can use user-specific layouts?

Options:

A.

Line item report

B.

Enhanced individual overview

C.

Cost element report

D.

Hierarchical report

Buy Now
Questions 15

What are some of the advantages of using project simul-ations? Note: There are 3 correct answers to this question

Options:

A.

Project simulations allow posting of actual data

B.

Project simulations can be created without using an operational project as a template

C.

Project simulations can be used to plan structures and costs

D.

Project simulations can create purchase requisitions

E.

Multiple project simulations can be used simultaneously

Buy Now
Questions 16

You are working with networks and WBS elements. Which of the following statements applies

Options:

A.

You can reassign an activity from one network to another

B.

You can assign the network header to multiple WBS elements

C.

You have to maintain a network profile in the project profile

D.

You have to activate the operative indicator Account Assignment Element for WBS element with activities.

Buy Now
Exam Code: C_TS412_2021
Exam Name: SAP Certified Application Associate - SAP S/4HANA Project Systems
Last Update: Mar 26, 2024
Questions: 110
$64  $159.99
$48  $119.99
$40  $99.99
buy now C_TS412_2021