C_TS422_2021 Sample Questions Answers

Questions 4

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

Options:

A.

Production order release

B.

Material requirements planning

C.

Backflushing

D.

Kanban

Buy Now
Questions 5

In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

Options:

A.

Planning mode

B.

Finiteness level

C.

Fixed pegging

D.

Direction

E.

Scheduling control

Buy Now
Questions 6

Which information is required when you created a production master in SAP S/4HANA?

Options:

A.

Selective screen for views

B.

Product type

C.

Base unit of measure

D.

Industry sector

Buy Now
Questions 7

How can you achive a feasible production plan in case of capacity constraints?

Options:

A.

Select an alternative mode on a resource.

B.

Adjust the available capacity.

C.

Reduce the planning window

D.

Form optimum sequence to reduce setup times

E.

Execute an infinite production planning run

Buy Now
Questions 8

What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

Options:

A.

The work center has several invidula capacities.

B.

The finite Scheduling indicator is NOT set in the strategy profile.

C.

The Change Planning Direction indicator is set in strategy profile.

D.

Alternative work centers are fully occupied.

Buy Now
Questions 9

What is the purpose of collective orders?

Options:

A.

To manage production orders for an entire finished product on multiple levels

B.

To post any component withdrawal as single backflush with order confiramtion

C.

To post production costs on a cost collector instead of the production order

D.

To combine order management of co-products any by-products with the main product.

Buy Now
Questions 10

You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?

Options:

A.

Change the special procurement key of the phantom assembly in the BOM.

B.

Change the explosion type of the phantom assembly in the BOM.

C.

Change the phantom item indicator for the phantom assembly in the BOM.

D.

Change the item category of the phantom assembly in the BOM.

Buy Now
Questions 11

Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

Options:

A.

Planed delivery time

B.

Operation duration

C.

In-house production time

D.

Total replenishment lead time

Buy Now
Questions 12

What does a line hierarchy in repetitive manufacturing represent?

Options:

A.

A production line with a parallel sequence in the routing

B.

A production line with prioritized alternative work centers

C.

A production line with more than one work center

D.

A production line with an alternative sequence in the routing

Buy Now
Exam Code: C_TS422_2021
Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
Last Update: Apr 19, 2024
Questions: 82
$72  $159.99
$54  $119.99
$45  $99.99
buy now C_TS422_2021