Summer Sale - Limited Time 55% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 5763r953

Welcome To DumpsPedia

HPE0-S55 Sample Questions Answers

Questions 4

A c7000 customer wants to expand their server environment. You want to encourage them to move to Synergy to prepare them for the future.

Which question should you ask?

Options:

A.

Is there a requirement for enhanced security on the management network?

B.

Do they want to maximize the memory footprint of their servers?

C.

Does their application workload benefit from persistent memory?

D.

Are they planning to purchase ProLiant Gen10 servers as part of the project?

Buy Now
Questions 5

A customer is considering installing a Synergy frame in an existing rack where their c7000 chassis is currently installed.

Which question should you ask to ensure the new frame will be supported in the rack?

Options:

A.

Are there any third party servers installed?

B.

How deep is the existing rack?

C.

Is there a UPS installed in the rack?

D.

How wide is the existing rack?

Buy Now
Questions 6

A customer wants to implement HPE Synergy with 20Gb connectivity.

What should an architect emphasize during a meeting with this customer?

Options:

A.

A maximum of 3 frames can be stacked together when 20 Gb connectivity is required.

B.

SAS connectivity will be supported only on third fabric.

C.

A Composer must be installed in each frame.

D.

20Gb connectivity will require additional licenses applied to the downlink ports.

Buy Now
Status:
Expired
Exam Code: HPE0-S55
Exam Name: Delta - Designing HPE Server Solutions
Last Update: Apr 14, 2023
Questions: 40
$72  $159.99
$54  $119.99
$45  $99.99
buy now HPE0-S55