Questions 4

What do you have to consider regarding consumption? (Choose two)

Options:

A.

Consumption takes place on the material level between the planned independent requirements and the planned orders.

B.

Consumption is restructured with the planning run.

C.

Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

D.

Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Buy Now
Questions 5

What functions can you use for sub operations? (Choose two)

Options:

A.

Costing

B.

Material component allocation

C.

Production/Resource tools allocation

D.

Capacity planning

Buy Now
Questions 6

Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)

Options:

A.

The order and its operations receive the system status Locked (LKD).

B.

Reservations are deleted.

C.

Purchase orders for external operations or non-stock materials are deleted.

D.

The order is no longer relevant for Material Requirements Planning.

E.

Capacity requirements are deleted.

Buy Now
Questions 7

What could be a consequence of confirming an operation?

Options:

A.

The planned costs are updated

B.

The capacity requirements are updated

C.

The production order is rescheduled

D.

The actual costs are settled

Buy Now
Questions 8

After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).

Which of the following planning file entries for this material are set by the system?

Options:

A.

The BOM explosion and the NETPL planning indicator

B.

The BOM explosion indicator

C.

The BOM explosion, the NETCH, and the NETPL planning indicators

D.

The NETCH and NETPL planning indicators

Buy Now
Questions 9

You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.

How can you fulfill these requirements in SAP ECC? (Choose two)

Options:

A.

Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.

B.

Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

C.

Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

D.

Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

Buy Now
Questions 10

You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly

Which standard SAP material type do you use?

Options:

A.

NLAG (non-stock material)

B.

FERT (finished product)

C.

ROH (raw material)

D.

HAWA (trading good)

Buy Now
Questions 11

The availability check during production order creation should use a different scope of check than during order release.

How can you fulfill this requirement?

Options:

A.

Maintain appropriate checking rules in checking control for order creation and order release.

B.

Maintain appropriate availability checking rules in the order type-dependent parameters.

C.

Maintain an appropriate availability checking group in the material master.

D.

Maintain appropriate availability checking rules in the production scheduling profile.

Buy Now
Questions 12

Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

Options:

A.

Standard values (routing)

B.

In-house production time (material master)

C.

Transport time (routing)

D.

Formulas (work center)

E.

Operation control key (routing)

Buy Now
Questions 13

What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

Options:

A.

Approved master recipes

B.

Digital signature

C.

Electronic batch record

D.

Availability check

E.

Resource selection

Buy Now
Questions 14

Which of the following properties applies to multi-site planning in SAP ECC?

Options:

A.

When using one-step stock transfer posting, transfer stock is created in the receiving plant.

B.

Multi-site planning can be activated using the corresponding planning strategy.

C.

Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.

D.

The use of "scope of planning" is always mandatory for multi-site planning.

Buy Now
Questions 15

The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)

Options:

A.

Goods receipt for the product produced with the order

B.

Creation of the production order

C.

Confirmation of the operation that the materials being checked are assigned to

D.

Release of the production order

E.

Goods receipt for a missing part

Buy Now
Status:
Expired , and Replaced By
Exam Code: C_TSCM42_67
Exam Name: SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
Last Update: Feb 20, 2024
Questions: 106
$64  $159.99
$48  $119.99
$40  $99.99
buy now C_TSCM42_67