New Year Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65percent

Welcome To DumpsPedia

2V0-13.25 Sample Questions Answers

Questions 4

The architect documented a requirement for 99.95% high availability to meet the customer's resiliency needs.

Which two physical design decisions will help meet this requirement in the management domain? (Choose two.)

Options:

A.

Configure vCenter HA for the management domain vCenter server.

B.

ESX Host Uplink Setting: EtherChannel = Enable

C.

Advanced Cluster Setting: das.iostatsinterval = 0

D.

Set the restart priority policy for the vCenter Server appliance to high.

E.

ESX Host Uplink Setting: EtherChannel = Disable

Buy Now
Questions 5

An organization is evacuating their current datacenter and moving all workloads to a new datacenter. The organization has a total of 800 workloads to move, and the migration must be completed with no downtime within a planned change window that is scheduled to occur in four weeks.

What migration method will meet the requirements?

Options:

A.

Cross vCenter vMotion

B.

HCX OS Assisted Migration

C.

HCX Bulk Migration

D.

HCX Replication Assisted vMotion

Buy Now
Questions 6

A customer has a new initiative to build a private cloud based on VMware Cloud Foundation (VCF). The customer technical team is presenting an overview of the current state of the infrastructure as well as describing what the expectations are for the private cloud.

Based on the notes captured by the architect, which statement should be documented as a constraint?

Options:

A.

The existing storage is out of hardware vendor maintenance.

B.

No funding exists for a new storage array. Therefore, existing storage hardware must be used.

C.

The design must address security zone requirements for management, production, dev/test, and QA workloads.

D.

The design must provide a centralized management console to manage both data centers.

Buy Now
Questions 7

As part of the VMware Cloud Foundation (VCF) logical design, the architect documented the following requirement:

• The solution must be able to support latency-sensitive workloads.

Which two physical design decisions will meet this performance requirement in the workload domain? (Choose two.)

Options:

A.

Intel TDX and AMD's SEV-SNP integration

B.

Advanced Memory Tiering with NVMe: Enabled

C.

vSAN Global Deduplication: Enabled

D.

NSX Enhanced Data Path: Enabled

E.

vSAN Deep Snapshots: Enabled

Buy Now
Questions 8

An architect is documenting the design for a new VMware Cloud Foundation (VCF) solution and makes the following design decision:

    Two vSphere clusters will be deployed within the single VI workload domain.

What statement should the architect include as an implication of this design decision?

Options:

A.

If the solution needs to be scaled at a future date, additional VI workload domains can be deployed.

B.

Deploying multiple clusters in the single VI workload domain reduces the number of vCenter Server instances that must be managed.

C.

Deploying multiple clusters within the single VI workload domain meets the requirement to segregate Production and Development workloads.

D.

All clusters within the single VI workload domain must use vSAN as their principal storage type.

Buy Now
Questions 9

When designing a backup and recovery solution for VKS clusters, which tool can be leveraged to back up and restore workloads?

Options:

A.

Site Recovery Manager

B.

Velero

C.

Restic

D.

VMware Live Recovery

Buy Now
Questions 10

Constraint: Existing stretched cluster model must be used.

Requirement: Minimize management infrastructure downtime.

Which Supervisor deployment model supports the design?

Options:

A.

Three Management Zone Supervisor deployment with HA control plane

B.

Single Management Zone Supervisor deployment with HA control plane

C.

Three Management Zone deployment with Simple Availability control plane

D.

Single Management Zone Supervisor deployment with Simple Availability control plane

Buy Now
Questions 11

An architect is designing a solution with Istio Service Mesh.

What two types of groups can collect and manage objects? (Choose two.)

Options:

A.

Service

B.

Cluster

C.

Security

D.

API

E.

Node

Buy Now
Questions 12

The architect documented a requirement for 99.95% high availability to meet the customer's resiliency needs.

Which two physical design decisions will help meet this requirement in the management domain? (Choose two.)

Options:

A.

Management Port Group: Route based on physical NIC load

B.

Host Overlay DHCP Scope Lease: 14 Days

C.

Physical Switch MTU: 9000

D.

vSAN Cache Tier Sizing: 800GB

E.

Host isolation response: Power Off and restart VM

Buy Now
Questions 13

An architect is responsible for designing a new VMware Cloud Foundation (VCF)-based Private Cloud solution. During the requirements gathering workshop with key customer stakeholders, the following information was captured:

• The solution must support running 50,000 workloads concurrently across all sites.

• The solution must support the concurrent deployment of up to 10 workloads.

When creating the design document, which design quality should be used to classify the stated requirements?

Options:

A.

Manageability

B.

Recoverability

C.

Performance

D.

Availability

Buy Now
Questions 14

An architect was in an architectural workshop and noted the following business objectives:

    The solution must prioritize optimal end-to-end user shopping experience for customers accessing the website.

    The website must be available 24 x 7 x 365.

Which three conceptual model items relate to these business objectives? (Choose three.)

Options:

A.

A requirement to have 99.99% availability uptime measured at the front-end application layer

B.

A risk that the external internet network provider does not meet the service level agreement (SLA) requirements

C.

A requirement to have 99.99% availability uptime measured at the network infrastructure layer

D.

An assumption that site performance is not a key performance indicator (KPI) for the customer

E.

A constraint of any planned changes limited to outside of business hours only

F.

An assumption that there is sufficient budget for the design to meet the performance requirements

Buy Now
Questions 15

An architect has made an assumption that existing support staff are adequately skilled to operate the proposed infrastructure design.

The risk associated with this assumption would be that existing support staff are inadequately skilled to operate the proposed infrastructure design. How would the architect mitigate the risk?

Options:

A.

Hire additional support staff with the same skillsets to add more support capacity.

B.

Allocate the necessary time and budget to train existing support staff on the necessary skills required to operate.

C.

Complete a skills assessment of the existing support staff to identify the skill gap.

D.

Engage a third-party company to deploy and configure the proposed solution.

Buy Now
Questions 16

During an initial design workshop with stakeholders, the architect was provided with an overview of the current state and other information required to proceed to the design phase.

The architect has assumed that the solution will need to support high availability for workloads.

Given the assumption, which statement should the architect document as a risk?

Options:

A.

The solution supports the separation of management components from production workloads.

B.

BGP is the dynamic routing protocol on the physical fabric and cannot be changed.

C.

The solution supports a recovery point objective (RPO) of 24 hours for infrastructure components.

D.

The entire infrastructure is hosted on a single physical site.

Buy Now
Questions 17

Existing environment:

    3 vSphere clusters, 5 hosts each.

    Networking = vDS.

    Storage = NFSv3.

    Managed by single vCenter.Architect decides to create a new VCF fleet with a single VCF instance.

What design implication should be documented?

Options:

A.

NSX will be automatically deployed during the creation of the VCF fleet.

B.

The vCenter VM must be migrated to a standalone host before fleet creation.

C.

The clusters will be automatically configured to use vSAN storage before the creation of the fleet.

D.

The ESX hosts will be converted to use vSphere Lifecycle Manager baselines during the creation of the fleet.

Buy Now
Questions 18

As part of the VMware Cloud Foundation (VCF) logical design, the architect has determined that the VCF Private Cloud will encompass multiple VCF instances contained within a single VCF Fleet. The architect documented the following requirements when using VCF Operations:

    Monitoring downtime must be minimized.

    Alerting downtime must be minimized.

Which design decision supports these requirements?

Options:

A.

Deploy two VCF Operations instances and configure the Aggregator Management Pack.

B.

Deploy VCF Operations using the Simple model with Collector nodes at remote sites.

C.

Deploy VCF Operations using the High Availability model with Collector nodes at remote sites.

D.

Deploy a single VCF Operations instance across a multi-VCF instance fleet.

Buy Now
Questions 19

Requirement: The solution must identify any configuration changes made to the Management Infrastructure every 30 days.

Which three design decisions should the architect make to meet the stated requirements? (Choose three.)

Options:

A.

Configure a Configuration Template for the Management Cluster.

B.

Schedule Configuration Drift to Check the configuration every 30 days.

C.

Configure a Configuration Template for the Management vCenter.

D.

Create a Configuration Template for the Management NSX Manager.

E.

Schedule Configuration Drift to Remediate the configuration every 30 days.

F.

Configure Host Profiles for the Workload Domain.

Buy Now
Questions 20

An architect had been given a constraint to use an existing storage array to support the virtual infrastructure design project.

The architect documents the following:

    Assumption 01: The existing storage array has sufficient capacity and performance to support the intended workloads.

    Risk 01: There is a risk that the performance and capacity of the existing storage array may not be sufficient for the solution.

How would the architect mitigate the risk?

Options:

A.

Ensure that the customer allocates budget for new hardware in case the risk is realized.

B.

Setup a RAID mirror configuration on the existing storage array for redundancy.

C.

Ignore the constraint and design the solution using VMware vSAN Express Storage Architecture (ESA).

D.

Request for additional budget to purchase more Fibre Channel switches.

Buy Now
Questions 21

As part of a design for a VMware Cloud Foundation (VCF) solution, an architect has documented the following dependencies and constraints:

    CONSOOl - Internet access will not be permitted from anywhere within the VCF solution.

    CONS002 - The password must not be stored in plain text anywhere within the VCF solution.

    DEP001 - The customer must make the required VCF binaries accessible to the VCF Installer appliance during the deployment phase.

Which design decision should the architect include in the design for the download of the VCF binaries?

Options:

A.

The VCF Installer appliance will be configured to connect to an online depot.

B.

The VCF Installer appliance will be configured to connect to an offline depot.

C.

The Bundle Transfer Utility will be used on the VCF Installer appliance.

D.

The VCF Download Tool will be used on the VCF Installer appliance.

Buy Now
Questions 22

Which statement would the architect document as a design decision within the logical design?

Options:

A.

Service Levels will align with the defined Business Impact Analysis findings.

B.

The solution must provide the ability to patch an existing template.

C.

The VMware Distributed Resource Scheduler (DRS) latency sensitivity value will be set to high for the workload cluster.

D.

vSphere High Availability (HA) will be enabled.

Buy Now
Questions 23

Which two VCF components are replicated across availability zones in a VMware Cloud Foundation (VCF) Fleet with Disaster Recovery model design with two availability zones?

Options:

A.

VCF Automation

B.

vCenter

C.

SDDC Manager

D.

NSX

E.

VCF Operations

Buy Now
Questions 24

An architect is planning resources for a new cluster that will be part of an existing workload domain. The new cluster will provide resources for several new workloads, including a mission-critical application consisting of five resource-intensive virtual machines.

The following requirements were provided for the new cluster:

• The solution must ensure that the new workload cluster meets the company's availability standard of N+1.

• The solution must minimize the overall investment in hardware.

Which two design recommendations should the architect make to meet the stated requirements? (Choose two.)

Options:

A.

Use automated placement rules to keep the mission-critical application virtual machines apart.

B.

Use resource pools to prioritize resource for the mission-critical application virtual machines.

C.

Use automated placement rules to keep the mission-critical application virtual machines together.

D.

Create a cluster with six hosts.

E.

Create a cluster with five hosts.

Buy Now
Questions 25

An architect is tasked with designing a new VMware Cloud Foundation (VCF) solution. During workshops with the customer, the following requirements were captured:

• REQ01: The solution must provide a self-service catalog.

• REQ02: The solution must support the segregation of the Development and Production resources (networks, virtual machines, users).

When documenting the design decisions, which statement should the architect include in order to help meet these requirements?

Options:

A.

VCF Automation does not support the use of multiple Active Directory domains.

B.

Separate workload domains must be configured to provide segregation between the Development and Production environments.

C.

VCF Automation will be configured with separate service catalog instances for Development and Production.

D.

VCF Automation will be configured with separate organizations for Development and Production.

Buy Now
Questions 26

A cloud architect is designing a VMware Cloud Foundation (VCF) Automation solution for an organization. The design must fulfill the following requirements:

    The design must minimize provider infrastructure lifecycle tasks.

    The design must minimize infrastructure management overhead.

    Each tenant must have isolated compute infrastructure.

Which of the following deployment models best meets these requirements?

Options:

A.

Single VCF instance with dedicated Workload Domains per tenant

B.

Consolidated VCF deployment per tenant

C.

Dedicated VCF instances per tenant in a Standard Architecture

D.

Shared Workload Domain for tenants

Buy Now
Questions 27

Which VMware Cloud Foundation (VCF) Storage Model can be deployed to scale storage capacity independent of compute and network?

Options:

A.

vSAN Compute Cluster Storage Model

B.

vSAN ESA Storage Model

C.

vSAN Capacity Cluster Model

D.

vSAN ESA Storage Cluster Model

Buy Now
Questions 28

During a requirements gathering workshop, the customer has provided a list of business and technical requirements.

Which requirement should be classified as a business requirement?

Options:

A.

The solution needs to grow by 30% over the next three years.

B.

The solution must consider security and resiliency to ensure continuity.

C.

The solution must provide no Single Point of Failure (SPOF).

D.

The solution should reduce operational costs.

Buy Now
Questions 29

A large financial institution is designing a VMware Cloud Foundation (VCF) solution. During the initial discovery meetings, the customer detailed the following requirements:

• Management of the physical network environment is handled by an outsourced team.

• The VMware Administration team cannot re-configure the physical network.

• All hosts must use Link Aggregation.

• The storage environment is disaggregated.

• NFS will be used as principal storage.

The customer provided the bill-of-materials for the physical servers being purchased. Each server will have four 25 GbE physical NICs: two connected to the network fabric for Management, vMotion, and virtual machine traffic; and two connected to the storage fabric hosting the NFS server.

How does the information provided impact the overall design?

Options:

A.

Link Aggregation cannot be used in the Workload Domain.

B.

NIC teaming for Virtual Standard Switch (vSS) must be configured.

C.

Multiple Link Aggregation Groups are not supported.

D.

Link Aggregation cannot be used in the Management Domain.

Buy Now
Exam Code: 2V0-13.25
Exam Name: VMware Cloud Foundation 9.0 Architect
Last Update: Jan 8, 2026
Questions: 97
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now 2V0-13.25