Questions 4

What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?

Options:

A.

1 hour

B.

2 hours

C.

3 hours

D.

4 hours

Buy Now
Questions 5

Refer to the figure by clicking on the EXHIBIT button above.

5

5

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

Options:

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Buy Now
Questions 6

Fire-resistance ratings of members and assemblies can be established by all of the following except:

Options:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

Buy Now
Questions 7

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

Options:

A.

1 hour

B.

1-1/2 hours

C.

2 hours

D.

3 hours

Buy Now
Questions 8

The building owner shall be responsible for each of the following for fire safety during construction except:

Options:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Buy Now
Questions 9

For a sprinklered Business Occupancy (Group B) in a 15-story building of Type IV-A construction, the maximum allowable building area is:

Options:

A.

54,000 sq. ft.

B.

648,000 sq. ft.

C.

972,000 sq. ft.

D.

unlimited.

Buy Now
Questions 10

Materials acceptable for use in fire-protecting connections in Type IV-A construction includes each of the following except:

Options:

A.

steel plates.

B.

gypsum board.

C.

a coating approved for the required fire endurance time.

D.

additional wood cover applied over the connection.

Buy Now
Questions 11

Which of the following is the best definition of Type IV-B construction?

Options:

A.

100% noncombustible protection on all mass timber surfaces

B.

50% noncombustible protection on the exterior and interior mass timber elements

C.

100% exposed mass timber except: shafts, concealed spaces, and outside of exterior walls

D.

Noncombustible protection on all surfaces of mass timber except for limited exposed mass timber elements

Buy Now
Questions 12

Fire-resistance ratings of members and assemblies can be established by all of the following except:

Options:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

Buy Now
Questions 13

The building owner shall be responsible for each of the following for fire safety during construction except:

Options:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Buy Now
Questions 14

In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:

Options:

A.

mineral wool.

B.

one-half-inch gypsum board.

C.

7/16-inch wood structural panels.

D.

mass timber complying with IBC Section 2304.11.

Buy Now
Questions 15

Refer to the exhibit by clicking on the EXHIBIT button above.

15

In the detail shown, if the connections at the glulam beam and the steel plate required a fire-resistance rating of one (1) hour and the wood cover is designed per AWC Technical Report 10 to provide the entire one (1) hour of protection, the minimum required thickness for the wood block member providing protection for the bolt connections is _____ inches.

Options:

A.

1.5

B.

1.75

C.

2

D.

3

Buy Now
Questions 16

Which of the following best describes circumstances for which a separate inspection by a building official would be required for the fire protection of structural connections in buildings of Type IV-B construction?

Options:

A.

When connections do not integrate full mass timber member bearing on other mass timber elements

B.

When connection fire resistance is provided by a fire resistance rated joint system in accordance with Section 715

C.

When connection fire resistance is provided by wood cover calculated to meet the requirements of Section 2304.10.1

D.

When connections are made without additional noncombustible protection beyond what is required for the connected elements

Buy Now
Questions 17

Which of the following products is not included in the definition of mass timber?

Options:

A.

Solid sawn lumber

B.

Prefabricated wood I-joists

C.

Glued laminated timber

D.

Cross-laminated timber

Buy Now
Questions 18

Concealed spaces in a Type IV-C building must be protected with:

Options:

A.

sprinklers per NFPA 13.

B.

a lining of fire-retardant-treated wood.

C.

the same protection as used for interior spaces in a Type IV-C.

D.

noncombustible materials with at least 40 minutes of assigned protection time.

Buy Now
Questions 19

Which of the following is true regarding fire-resistance rating protection provided by noncombustible covering material?

Options:

A.

1/2 in. gypsum board provides 30 minutes

B.

1/2 in. Type X gypsum board provides 40 minutes

C.

5/8 in. gypsum board provides 40 minutes

D.

5/8 in. Type X gypsum board provides 40 minutes

Buy Now
Questions 20

Refer to the exhibit by clicking on the EXHIBIT button above.

20

Given: The connections between the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, and wood cover is designed per AWC Technical Report 10 to provide the entire 2 hours of protection.

The bearing area between the CLT and glulam is the minimum required.

What are the minimum dimensions, in inches, for the wood block shown in red?

Options:

A.

1.5 x 1.5

B.

2 x 2

C.

3 x 3

D.

4 x 4

Buy Now
Questions 21

Which of the following best describes the required protection for mass timber hoistway enclosure walls in Type IV-C construction?

Options:

A.

Noncombustible protection of at least 40 minutes fire resistance

B.

No requirement, but walls must achieve the required fire-resistance rating

C.

Noncombustible protection of at least 1/2 in. gypsum board or equivalent

D.

fire-retardant-treated-wood sheathing, 1/2-inch gypsum board, or a noncombustible material

Buy Now
Questions 22

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:

A.

30-minutes

B.

45-minutes

C.

1-hour

D.

2-hours

Buy Now
Questions 23

Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:

Options:

A.

Type IV-C must be 1 hour

B.

Type IV-A must be 3 hours

C.

Type IV-B must be 2 hours

D.

Type IV-C must be 2 hours

Buy Now
Questions 24

Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance with which of the following standards?

Options:

A.

UL 263

B.

ASTM A653

C.

ASTM D3498

D.

ASTM F1575

Buy Now
Exam Code: 93-Tall-Mass-Timber-Buildings
Exam Name: 93-Tall-Mass-Timber-Buildings
Last Update: Sep 11, 2026
Questions: 80

PDF + Testing Engine

$59.99 $171.4

Testing Engine

$44.99 $128.55

PDF (Q&A)

$49.99 $142.82