Easter Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

HPE7-A03 Sample Questions Answers

Questions 4

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

Based on best practices, what should you recommend as the correct optic type for the connection between the IDF and the technical rooms?

Options:

A.

Aruba 106 SFP- LC LRM 220 m MMF Transceiver

B.

Aruba 106 SFP+ LC SR 300 m MMF Transceiver

C.

Aruba 100 LC BID! 40 km-0 1330/1270 XCVR

D.

Aruba 10GBASE-T SFP- RJ-45 30 m Cat6A Transceiver

Buy Now
Questions 5

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client decided that wired headless devices would be authenticated using Mac Authentication and would have RADIUS attributes sent back to the NAD to assign VLAN and port access parameters to the authentication session on the switch port.

What would be critical in making this a successful deployment? {Select two.)

Options:

A.

Mobility Gateway

B.

Airwave

C.

ClearPass

D.

DHCP

Buy Now
Questions 6

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would take to ensure redundant RADIUS resources in each of their three geographical regions (AMER. EMEA. and APAC) A large office location Is available In each region with sufficient VMware resources available.

- Each region has 5.000 clients, all of which will need to do either 802.1 x wired or wireless authentications as well as 802.1 x authentication for a single personal device on Wi-Fi.

• All of the non-personal devices will also need to validate health with a local agent.

• A total of 500 guests are expected to be connected on average with a maximum of 700 simultaneous connections making use of Guest Portal for access to the Internet.

• TACACS authentication will also be configured for a total of 1,200 evenly dispersed NADs.

In order to support virtual IPs and server redundancy in each region how many Virtual Policy Manager Licenses will be needed?

Options:

A.

six licenses. C3000V

B.

six licenses. C2000V

C.

three licenses. C3000V

D.

three licenses. C2000V

Buy Now
Questions 7

What is the difference between 0M4 and 0M5 cabling? (Select two)

Options:

A.

0M4 supports distances up to 100 m. while 0M5 supports distances up to 150 m using 100 GBps transceivers.

B.

0M5 supports Multiplexing operating in the 850 to 950 nm range, while 0M4 does not

C.

0M5 is approved as wide Band Multimode Fiber (WBMMF). while 0M4 Is not.

D.

0M5 supports speeds up to 100 Gbps. while OM4 does not.

Buy Now
Questions 8

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would like 10 include Blue Dot location tracking in their four floors of corporate space. The APs are not Ideally placed to allow for smooth map transitions.

What could you add lo provide better tracking? (Select two.)

Options:

A.

UXI sensors

B.

beacons

C.

more APs

D.

tags

Buy Now
Questions 9

Matchthe deployment typeto the estimated numberof APs.

Options:

Buy Now
Questions 10

identify the stakeholders when gathering information for the network design and new IDF/MDF design. (Select two.)

Options:

A.

Help desk manager

B.

Facility manager

C.

Chief Financial Officer

D.

Network Operations manager

Buy Now
Questions 11

A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests

Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.

The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).

For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.

The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.

The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.

The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing the security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They have heard about dynamic segmentation and central and decentral overlay networks.

What would you advise as the most cost-efficient solution?

Options:

A.

Standardize on Aruba 6000 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

B.

Standardize on Aruba 6100 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

C.

Standardize on Aruba 6300 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

D.

Standardize on Aruba 6200 switches for the access layer, add a cluster of 9240 GWs. and Implement central overlay networks on UBT basis.

Buy Now
Questions 12

You are designing a solution with Aruba OS10-based access points and redundant gateways and these are the requirements:

• W1-F16E based access points

• support for tunneled traffic

• application visibility

• rogue APs

• live upgrades

• Air Slice

• Cloud Guest Authentication

• Ai insights

Which licenses are needed? (Select two.)

Options:

A.

AP Foundation

B.

WIAN Gateway

C.

AP Advanced

D.

Gateway Foundation

Buy Now
Questions 13

'Don't Buy at Us' is a US-based retail company that is expanding Into Europe. They are expanding into EMEA with a regional headquarters called HQ2 inside The Netherlands.

Their US-based headquarters HQ1 was refreshed last year based on the Aruba ESP architecture. You have treated the design for HQ? based on the same design as HQ1. a two-tier architecture. The high level is shown below.

Switch BOM for this project based on Two Tier:

Collapsed Core: 2 x Aruba 8360-16Y2C in VSX (ISL 2» ICOG0E DAC)

Access Slack: 10 x Slack of Aruba 6200F 48G Class4 PoE 4SFP- 740W each stack has A members. VSF

with 10GbE VSF links) 12 x 10GbE uplink pet stack)

During the presentation of your design to the CTO of "Don't Buy at Us" you were informed about the changes they want you to incorporate into the updated design

1. HQ2 will include the EMEA regional distribution center (EMEA-OISTR) next to the HQ2.

2. Only two pairs of 0S1 are available between HQ2 and EMEA-DlSTR.

3. The uplinks from all access stacks need to increase to 2 x 25GbE. the fiber in HQ2 and EMEA-DI5TRI is certified for 25GbE.

4. EMEA-DlSTR needs at least 7 x stack of Aruba 48 ports switches (each stack has 4 members).

Whichanswer based on best practice is presenting the correct Switch BOM tor the updated design?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 14

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility willbe retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network Infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be In use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services.

The client has decided that more critical switch stacks supporting Contact Center resources will need to support greater than 600W of CL4 PoE and have redundant power supplies These stacks will have approximately six members.

What would be the most economical choice Aruba switch series to meet these requirements?

Options:

A.

Aruba CX 6100

B.

Aruba CX 6400

C.

Aruba CX6300F

D.

Aruba CX6200M

Buy Now
Questions 15

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will beout of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client would like to ensure full wireless coverage in its 40 m x 40 m i 130 ft x 130 ft) auditorium during company functions while maintaining the fewest APs for aesthetic purposes WI-FI6 APs are a minimum requirement.

Which AP series would you use In the auditorium's 1.000 seats with a maximum take rate of 80%?

Options:

A.

AP577

B.

AP515

C.

AP635

D.

AP555

Buy Now
Questions 16

What possible issue with the cote switch selection do you see in regards to the customers’ requirements?

Options:

A.

The core switch will not support the 25GbE downlinks to the distribution switches.

B.

The cote switch will have a lot of unused ports.

C.

The cote switch will not have enough ports for VSX links.

D.

The cote switch will not support the 10GbE downlinks to the cabins and technical rooms.

Buy Now
Questions 17

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. Thecorporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.

The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services

The client decided that they would like to manage two wiring closets as a single stack with a total of 10 switches and a minimum transport speed or 25Gbps over OM4 MM fiber They would also like to keep the stacking cabling cost to a minimum.

Which stacking components would be required to meet the customer's requirements in the most cost-effective way if the closets were 190 m (620 ft) apart? (Select two.)

Options:

A.

50GDAC cables

B.

SFP56 transceivers

C.

25GDAC cables

D.

SFP28 transceivers

Buy Now
Questions 18

You ate presenting your network design solution to your customer. What Is important to include in your presentation?

Options:

A.

protocols that will be used to make your solution work

B.

your rollback plan

C.

your experience with this kind of project

D.

tangible and intangible returns for the customer

Buy Now
Questions 19

You hired a junior engineer to assist you with a large-scale network infrastructure project. The engineer has never worked on such a complex project 'ants to better understand the role that each role that each stakeholder will play in the project.

March the stakeholder title to the responsibilities that would most likely apply to their role.

Options:

Buy Now
Questions 20

What is one use case for designing a 2-tier campus LAM instead of using a 3-tier?

Options:

A.

The campus has small buildings with only a few wiring closets.

B.

The network has grown beyond a few building aggregation points

C.

Access aggregation points are not scaling to meet traffic demands.

D.

Cross-campus traffic has grown beyond We capacity of a single collapsed core

Buy Now
Questions 21

ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.

The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.

A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.

Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.

The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.

The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.

The customer has budget concerns but does want something that could last 7+ years.

Which two projects does the customer have in the planning state? (Select two)

Options:

A.

VoIP upgrade

B.

Inventory Control System

C.

kiosks/display station

D.

new POS system

Buy Now
Exam Code: HPE7-A03
Exam Name: HPE Aruba Networking Certified Network Architect - Campus Access
Last Update: May 14, 2024
Questions: 70
$64  $159.99
$48  $119.99
$40  $99.99
buy now HPE7-A03