A field calls about a problem enabling the DSPs on a new Communication Server (CS) 1000E SA Co-resident on release 7x. The DSPs on the MG 1 are all enabled but enabling the DSPs on MG2 and MG3 fail, and asked that the configuration be reviewed.
MG1: CPMG 128
MG2: MGC 128 DSP DB in position 2
MG3: MGC 128 DSP DB in position 2
After reviewing the configuration, an error in the DSP 128 VGW (DSP) configuration is identified?
Which configuration option accurately reflects the proper configuration for the voice Gateway (DSP) channel?
A customer is planning to install and configure a Commercial Off the Shelf (COTS) server IBM X3550 as a Signaling Server for their Communication Server (CS) 1000 Rls.. 7x network.
Which two statements describe the software installation process? (Choose two)
A technician has deployed a Communication Server 1000 Rls. 7x system at their site. You are using the Virtual Terminal to access Communication Command line interface (CLI) to add telephone.
Which Overlays (LDs) are linked to eliminate the need for existing one Overlay (LD) and entering another one?
Click the Exhibit button.
A technician is asked to review the existing route information for the customer.
According to the printout shown in the exhibit, type of route is this?
A customer requires an upgrade from release Communication Server 1000E Rls. 7x. the current system has a release 5.0 CPPM Call Server and an ISP 1100 Signaling Server. They have 874 IP telephone users and 810 TDM telephone deployed.
Which upgrade will support the customer’s current deployment scenario?
A customer with a Communication Server (CS) 1000Rls. 6.0 SA is upgrading to Release 7.0. They have decided to replace the existing CPPM Call server CPPM Signaling Server with a CPPM Co-Resident Call Server, Signaling Server and Gateway Controller to free up a two card slots. A technician has decided to use the ELAN IP of the Call Server from the original system as the ELAN IP address of the Co-Resident server.
Which action must be taken to consolidate the servers?