Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

CLSSYB Sample Questions Answers

Questions 4

Voice of the Customer is a Lean Six Sigma technique to determine the ___________ attributes of a product or service.

Options:

A.

Desirable

B.

Beneficial

C.

Critical-to-Quality

D.

Preferred

Buy Now
Questions 5

As we conceive and define a LSS project one of the overriding things we hope to accomplish is to reduce the _____________________.

Options:

A.

Work force

B.

Number of process steps

C.

Inventory

D.

Cost of Poor Quality

Buy Now
Questions 6

Al bought a handheld GPS from his local electronics store. When he entered an address it would not function. For the manufacturer of the GPS this would be categorized as what type of cost?

Options:

A.

Internal Failure Cost

B.

Prevention Cost

C.

External Failure Cost

D.

Appraisal Cost

Buy Now
Questions 7

The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan.

Options:

A.

X-Y Diagram

B.

Shewhart Chart

C.

FMEA

D.

Customer Service Plan

Buy Now
Questions 8

A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .

Options:

A.

Ishikawa

B.

Kaizen

C.

Kanban

D.

Muda

Buy Now
Questions 9

Benefits and working conditions would be primarily the concern of which of the following?

Options:

A.

Voice of the Customer

B.

Voice of the Employee

C.

Voice of the Business

D.

Voice of the Process

Buy Now
Questions 10

A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?

Options:

A.

Fishbone Diagram

B.

SIPOC

C.

X-Y Matrix

D.

Pareto Chart

Buy Now
Questions 11

The Value Chain in an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs.

Options:

A.

True

B.

False

Buy Now
Questions 12

Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?

Options:

A.

7.2

B.

10.4

C.

14.4

D.

28.8

Buy Now
Questions 13

Which of the following would likely not be a CTQ (Critical-to-Quality) for the purchase of a product?

Options:

A.

Functionality

B.

Durability

C.

Dependability

D.

None

Buy Now
Questions 14

An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.

Options:

A.

Control Plan

B.

FMEA

C.

Standard Operating Procedure

D.

Process Map

Buy Now
Questions 15

At the beginning of a project we must keep in mind there are basically three views of a process: What you THINK it is, What the SUPPLIER wants and What it SHOULD be.

Options:

A.

True

B.

False

Buy Now
Questions 16

The temperature of a liquid is being measured by a line operator. Which is least likely to be influenced by the instrument?

Options:

A.

Recording the measurement

B.

Actual temperature of the liquid

C.

Calibration of the instrument

D.

Reading of the instrument

Buy Now
Questions 17

One of the primary objectives of constructing an X-Y Diagram is to separate the vital few Y’s from the trivial many Y’s.

Options:

A.

True

B.

False

Buy Now
Questions 18

A Belt has determined that the loan application does not need to be reviewed by accounting thereby improving the number of applications a loan processer can handle. According to Cost of Poor Quality (COPQ) definitions RTY improvement would be considered _______________.

Options:

A.

Downsizing savings

B.

Hard savings

C.

Soft savings

D.

Median savings

Buy Now
Status:
Expired
Exam Code: CLSSYB
Exam Name: Certified Lean Six Sigma Yellow Belt
Last Update: Mar 14, 2024
Questions: 120
$64  $159.99
$48  $119.99
$40  $99.99
buy now CLSSYB