CSQE Sample Questions Answers

Questions 4

When performing top-down testing, which of the following tools is used in place of a module that is not yet developed?

Options:

A.

Stubs

B.

Driver

C.

Hamess

D.

Test script

Buy Now
Questions 5

During the requirements planning stage, management ' s responsibility is to

Options:

A.

provide effort estimates for implementation

B.

ensure that appropriate stakeholders are involved

C.

confirm customer requirements

D.

define the quality criteria for the project

Buy Now
Questions 6

Entry and exit criteria for product development should be used to determine

Options:

A.

compliance with the specified development lifecycle

B.

whether schedule, budget, and resource requirements are being met

C.

when configurable items should be placed under library control

D.

when one phase is complete and the next phase can begin

Buy Now
Questions 7

Which of the following activities is classified as data collection and storage?

Options:

A.

Installing and administering data technology

B.

Supporting data technology usage and related issues

C.

Confirming adequacy, uniqueness, and consistency of data

D.

Providing mechanisms that support data availability requirements

Buy Now
Questions 8

Which of the following diagrams is most appropriate for showing the relationship between software design input requirements and software design output?

Options:

A.

Tree

B.

Matrix

C.

Affinity

D.

Ishikay

Buy Now
Questions 9

A software project requires data to be secure due to export control regulations The software project needs to be running on the client ' s virtual machines, and the client does not want to connect to the software through their enterprise VPN. Which of the following cloud ownership and service model combinations should the client use?

Options:

A.

A public cloud and software as a service

B.

A community- cloud and platform as a service

C.

A private cloud and infrastructure as a service

D.

A virtual private cloud and software as a service

Buy Now
Questions 10

Which of the following inputs is used in software cost estimation models?

Options:

A.

Lines of code

B.

Number of users

C.

Age of the software

D.

Maintenance requirements

Buy Now
Questions 11

Defect prevention should be initiated during the

Options:

A.

test phase

B.

requirements phase

C.

design phase

D.

coding phase

Buy Now
Questions 12

The diagram below corresponds to a 100-lme; high-level language program with a single loop that can be executed no more than 20 times.

If this program was exhaustively tested, approximately how many possible paths would be executed0

Options:

A.

6

B.

20

C.

200

D.

1014

Buy Now
Questions 13

Ideas and exclusive rights for novel inventions can be protected for a limited time through

Options:

A.

patents

B.

copyrights

C.

license

D.

trademark

Buy Now
Questions 14

Preventing or eliminating the causes of injury and damage is the best defense against which of the following?

Options:

A.

Critical failures

B.

Product liability

C.

Market volatility

D.

Inadequate capability

Buy Now
Questions 15

Which of the following metrics would be most appropriate for evaluating how effective the peer review process was for removing defects?

Options:

A.

Cycle time

B.

Defect density

C.

First-pass yield

D.

Requirements volatility

Buy Now
Questions 16

In a software development company, which of the following authorities is responsible for establishing the company ' s quality policies?

Options:

A.

Senior management

B.

Quality management

C.

Engineering development teams

D.

A cross-functional ream of developers and managers

Buy Now
Questions 17

Which of the following reviews is used to examine cost, schedule, scope, and risk?

Options:

A.

Program

B.

Phase gate

C.

Retrospective

D.

Architectural design

Buy Now
Questions 18

When a team is defining a software metrics program, which of the following steps must be taken first?

Options:

A.

Determine what data to collect.

B.

Collect preliminary data

C.

Establish the data collection goal.

D.

Select the metrics to report

Buy Now
Questions 19

A software hazard analysis should be conducted in order to

Options:

A.

identify and evaluate the level of risk

B.

predict when the hazard will occur

C.

calculate the cost of correcting the problem

D.

comply with government regulations

Buy Now
Questions 20

A strong customer feedback management process primarily helps an organization improve

Options:

A.

profitability

B.

existing products

C.

company stock price

D.

software development time

Buy Now
Questions 21

Which of the following is a responsibility of a lead auditor?

Options:

A.

Submitting the audit report

B.

Determining the scope of the audit

C.

Determining the corrective actions required

D.

Performing the initial review of the quality system

Buy Now
Questions 22

Which of the following techniques can interfere with an interviewer’s ability to read nonverbal signals?

Options:

A.

Ignoring distractions

B.

Reading between the lines

C.

Taking notes

D.

Asking questions

Buy Now
Questions 23

Which of the following statements is true about race conditions in real-time embedded systems?

Options:

A.

They are easy to replicate.

B.

They cannot occur in multi-processing systems.

C.

They can be detected during stress testing.

D.

They can first be detected during unit testing.

Buy Now
Questions 24

When lines of code are used as a software metric, counting rules must be based on

Options:

A.

criteria established by the requirements

B.

predefined criteria

C.

a line-by-line code review

D.

module interfaces

Buy Now
Questions 25

Which of the following tests is most appropriate for efficiently determining if the software handles time zones correctly?

Options:

A.

Fault insertion

B.

Boundary value

C.

Fault-error handling

D.

Equivalence class partitioning

Buy Now
Questions 26

Upon receipt of a new software deliver}-, which of the following tests should be executed to ensure the software operates in the target environment?

Options:

A.

Release

B.

Integration

C.

Installation

D.

Acceptance

Buy Now
Questions 27

Which of the following best defines the total cost of quality for a software project?

Options:

A.

Quality assurance and testing budgets

B.

Fixing defects and maintenance

C.

Prevention, appraisal, and failures

D.

Planning, designing, and testing

Buy Now
Questions 28

A company uses a feature rating system with the following values.

1 = Completely dissatisfied

2 = Somewhat dissatisfied

3 = Neither satisfied nor dissatisfied

4 = Somewhat satisfied

5 = Completely satisfied

This rating system is based on what type of measurement scale?

Options:

A.

Nominal

B.

Ordinal

C.

Interval

D.

Ratio

Buy Now
Questions 29

Project management has been complaining that code inspections are taking too much time and are not worth the effort. The software manager has to decide whether the inspection program should be continued or disregarded for the upcoming release. Which of the following factors is critical to the manager s decision?

Options:

A.

The resources currently available for development

B.

The estimated impact of inspection on the schedule

C.

The cost of additional testing

D.

The cost of not using inspection

Buy Now
Questions 30

Which of the following levels of control should be assigned when a software failure may result directly in a mishaps

Options:

A.

LOC I - Autonomous Time Critical

B.

LOC Ila - Autonomous Not Tune Critical

C.

LOC nib - Operator Controlled

D.

LOC IV - Not Safety Software

Buy Now
Questions 31

In specifying a software requirement, it is important to consider how the requirement might be

Options:

A.

referenced

B.

documented

C.

coded

D.

validated

Buy Now
Questions 32

A software maintenance release is conducted to deliver new

Options:

A.

features

B.

functionality

C.

defect corrections

D.

software products

Buy Now
Questions 33

Quality function deployment is defined as a

Options:

A.

procedure in which code modules with low defect density are identified for reuse

B.

technique for measuring complex metrics by random sampling of functional units

C.

method that provides a framework for relating product features to customer needs

D.

process in which best practices are distributed throughout all levels of an organization

Buy Now
Questions 34

An effective team facilitator should have which of the following characteristics?

Options:

A.

Neutrality

B.

Decision-making ability

C.

Technical expertise

D.

Competitiveness

Buy Now
Questions 35

An organization uses the plan-do-check-act (PDCA) cycle to align its processes to an international quality standard, which of the following activities would be performed during the " act " step?

Options:

A.

Identifying actions to be performed during the pilot

B.

Performing internal audits of the system

C.

Making quality system revisions

D.

Documenting the problems to present to management

Buy Now
Questions 36

Which of the following lifecycle models would be most appropriate to use if the requirements are well known?

Options:

A.

spiral

B.

iterative

C.

waterfall

D.

incremental

Buy Now
Questions 37

Which of the following measures would a project manager use to assess the team’s progress against the project schedule?

Options:

A.

Function point metric

B.

Earned value analysis

C.

SMART metrics

D.

COCOMO H Model

Buy Now
Questions 38

Which of the following charts is most appropriate for presenting a summary* view of a set of metrics that include an ideal value?

Options:

A.

pie

B.

Bar

C.

kiviat

D.

stoplight

Buy Now
Questions 39

Which of the following tests should be conducted on software that will be used internationally?

Options:

A.

Logical path analysis

B.

Predefined function keys

C.

Boundary value analysis

D.

Test matrices

Buy Now
Questions 40

Corrective action procedures must include which of the following elements?

Options:

A.

Who caused the nonconformities

B.

What caused the nonconformities

C.

Any history of similar nonconformities

D.

Any trend data of similar nonconformities

Buy Now
Questions 41

Which of the following disadvantages are associated with the " formal meeting " technique of oral communication?

Options:

A.

Loss of non-verbal communication, no permanent record, and time consuming

B.

Loss of non-verbal communication, one way communication, and all topics may not be relevant to all team members

C.

Can degrade into time wasters, can be disruptive, and requires considerable planning and skills to achieve positive impression

D.

Can degrade into time wasters, some people feel uncomfortable offering opinions in public, and difficult for remote team members

Buy Now
Questions 42

A static analysis tool is used to

Options:

A.

ensure that the system meets customer expectations

B.

identify potential problems

C.

trace test cases

D.

improve the time to market

Buy Now
Questions 43

Which of the following capabilities of a configuration management system is involved with constructing a specific build of the software?

Options:

A.

Project repository

B.

Release notes

C.

Version management

D.

Issue tracking

Buy Now
Questions 44

Which of the following usage metrics is most effective for capacity planning of a data warehouse?

Options:

A.

Queries per user

B.

Queries per timeframe

C.

Query latency per user group

D.

Queries per user group per timeframe

Buy Now
Questions 45

Which of the following best describes a process audit?

Options:

A.

The evaluation of established procedures

B.

An investigation of the quality management system

C.

The verification that product characteristics are met

D.

An internal review of the quality policy

Buy Now
Questions 46

Which of the following elements must be in place for a measure to be reliable?

Options:

A.

A well-designed data collection form

B.

An automated tool for calculating the measure

C.

An operational definition of the measure

D.

An online database for tracking the measure

Buy Now
Questions 47

The need to perform supplier evaluations can be reduced under which of the following conditions?

Options:

A.

The contract with the supplier specifies software quality requirements.

B.

The supplier agrees to correct any software defects found.

C.

The supplier demonstrates an effective software quality management system.

D.

The supplier provides the customer with internal audit results that show “no problems found.”

Buy Now
Questions 48

Which of the following techniques is used to measure the number of test cases needed to execute each code statement at least once?

Options:

A.

Function point analysis

B.

Cause and effect diagram

C.

Cyclomatic complexity

D.

Defect removal effectiveness

Buy Now
Questions 49

The highest risk associated with ambiguous requirements for requirements analysts is

Options:

A.

they may be checked through twice

B.

they are not compliant with ISO 9001

C.

their reviews may take longer than planned

D.

they will build the wrong software product

Buy Now
Questions 50

One of the requirements in a software quality plan is to measure the average time software performs without a problem in a production environment during regular business hours under usual workload. This is an example of which of the following quality* attributes?

Options:

A.

Timeliness

B.

Availability

C.

Performance

D.

Reliability

Buy Now
Questions 51

Which of the following best describes how an auditor should proceed when a deficiency similar to deficiencies found during audits at other companies is uncovered?

Options:

A.

Cite as many of the other examples as necessary to help the auditee understand what corrective action is required.

B.

Provide the auditee with the names of companies from previous audits which could be contacted for advice.

C.

Identify the current deficiency in a different way in order to avoid the appearance of a conflict of interest.

D.

Document the current deficiency without making any reference to the similar deficiencies found in other audits.

Buy Now
Questions 52

Unit testing validates

Options:

A.

software requirements

B.

top-level design

C.

module code

D.

system design

Buy Now
Questions 53

At the closing meeting of an audit, who is responsible for explaining the follow-up actions required in the audit report?

Options:

A.

Client

B.

Audit manager

C.

Auditee

D.

Lead auditor

Buy Now
Questions 54

Which of the following as the most appropriate source of metrics that support the change management decision-making process?

Options:

A.

Software library

B.

Software compiler

C.

Status accounting tool

D.

Version control system

Buy Now
Questions 55

One of the objectives of a functional test is to demonstrate that the software

Options:

A.

is sufficiently free of operational problems

B.

is understood by the user

C.

interacts appropriately at the unit level

D.

processes the data in a structured manner

Buy Now
Questions 56

Which of the following terms is used to describe the measure of interdependence among modules in a computer program?

Options:

A.

Coherence

B.

Concurrency

C.

Cohesion

D.

Coupling

Buy Now
Questions 57

Each software development process should have a clearly defined set of inputs, activities, outputs, and

Options:

A.

stimuli criteria

B.

entry exit criteria

C.

go no-go criteria

D.

cost estimates

Buy Now
Questions 58

The following graph depicts errors per 1,000 lines of code (KLOC) for modules S, T, U, and V.

The program manager should be most concerned about which module?

Options:

A.

S

B.

T

C.

U

D.

V

Buy Now
Questions 59

During what activity would it be appropriate for a team to use a complexity analyzer0

Options:

A.

Requirements analysis

B.

Requirements traceability

C.

Test planning

D.

Test execution

Buy Now
Questions 60

Which of the following methods is most effective for identifying defects in a work product?

Options:

A.

Round-robin

B.

Brainstorming

C.

Informal desk check

D.

Formal technical review

Buy Now
Questions 61

In order to reduce inconvenience for customers during a maintenance phase, support staff should concentrate on fixing

Options:

A.

all known defects

B.

minor defects only

C.

defects that affect the “vital few” customers

D.

defects that impact essential operations

Buy Now
Questions 62

Which of the following bar charts would be most appropriate for showing how a total breaks down into categories?

Options:

A.

Simple

B.

Stacked

C.

Grouped

D.

Horizontal

Buy Now
Questions 63

Which of the following problem-solving tools is most appropriate for breaking down ideas into progressively greater detail?

Options:

A.

Tree diagram

B.

Matrix diagram

C.

Affinity diagram

D.

Relationship diagram

Buy Now
Questions 64

A requirements change impact analysis should be performed when

Options:

A.

configuration items are placed under formal change control

B.

configuration items are marked as baselined

C.

a change has been approved by the change control board (CCB)

D.

a change is being reviewed by the change control board (CCB)

Buy Now
Questions 65

What type of audit is designed specifically to provide assurance that activities have been performed as documented?

Options:

A.

Compliance

B.

Supplier

C.

Quality

D.

Operations

Buy Now
Questions 66

Which of the following activities should be classified as an internal failure cost?

Options:

A.

Responding to customer satisfaction

B.

Completing an internal audit

C.

Shipping a maintenance build

D.

Investigating the cause of build defects

Buy Now
Questions 67

Which of the following activities can be performed during the requirements phase?

Options:

A.

Data normalization

B.

Acceptance test planning

C.

Functional testing

D.

Reliability modeling

Buy Now
Questions 68

From the auditor ' s perspective, which of the following actions will result in a successful internal audit?

Options:

A.

Reporting as many deficiencies as possible

B.

Completing each item on the checklist

C.

Recommending corrective action for each deficiency noted

D.

Obtaining management cooperation and support

Buy Now
Questions 69

What type of technology- is designed to provide organizational partners with real-time access to information on a business-to-business architecture?

Options:

A.

Embedded system

B.

Encrypted email

C.

Extranet

D.

Internet

Buy Now
Questions 70

Which of the following libraries is used to archive intermediate baselines?

Options:

A.

Static

B.

Backup

C.

Dynamic

D.

Controlled

Buy Now
Questions 71

Which of the following is the primary input to functional testing?

Options:

A.

Requirements

B.

Design

C.

Source code

D.

Architecture

Buy Now
Questions 72

In lean software development extra features should be identified as

Options:

A.

potential re-use elements

B.

an internal cost of quality

C.

defects

D.

waste

Buy Now
Questions 73

Which of the following benefits is associated with using the iterative model?

Options:

A.

It can be tailored to the needs of the project and organization.

B.

It does not require knowledge of all the requirements up front.

C.

It correlates directly to the deliverables of software development.

D.

It focuses on exploring options early by feedback through prototyping

Buy Now
Questions 74

A software product is being developed for validating retail sales transactions that include cash, checks, and credit or debit cards. What type of testing should be performed from the cashier’s perspective?

Options:

A.

Unit testing

B.

Alpha testing

C.

Usability testing

D.

Performance testing

Buy Now
Questions 75

A software program’s property of being able to handle bad inputs is referred to as

Options:

A.

fail safe

B.

accuracy

C.

robustness

D.

fault forecasting

Buy Now
Questions 76

A software developer is replacing a higher level code with a test code that establishes a function and passes test data to that function What type of test environment is the developer using

Options:

A.

Regression

B.

Static

C.

Driver

D.

Stub

Buy Now
Questions 77

Which of the following organizational benefits is associated with increased satisfaction among external stakeholders?

Options:

A.

Improved predictability of costs

B.

Increased productivity of practitioners

C.

Strengthened ability to survive or prosper

D.

Reduced development and maintenance costs

Buy Now
Questions 78

In the following control diagram, all paths are feasible and the decisions are not correlated to each other.

How many rests are necessary for branch coverage?

Options:

A.

2

B.

4

C.

6

D.

8

Buy Now
Questions 79

Static analysis tools are used to evaluate

Options:

A.

requirements and design

B.

software builds and test cases

C.

test procedures and packaging

D.

documentation and source code

Buy Now
Questions 80

When a software system will be required to manage confidential information, the security protection mechanisms for the system should be designed so that

Options:

A.

the effort to penetrate the system costs more than the value of the information obtained

B.

passwords needed for system access must be changed on an annual basis and may not be reused

C.

passwords cannot be shared in the end-user environment

D.

users who do not have administrative rights are locked out of the system during non-working hours

Buy Now
Questions 81

Which of the following outputs is most likely to result from a sprint retrospective?

Options:

A.

Stakeholder feedback

B.

Refined product backlog

C.

Product enhancement request

D.

Continuous improvement action

Buy Now
Questions 82

The planned value of a project is $1,000,000. The project is 75% done, and the earned value is currently $700,000. In this case, the project is

Options:

A.

over budget

B.

under budget

C.

behind schedule

D.

ahead of schedule

Buy Now
Questions 83

Which of the following baselines is typically established after completion and approval of system requirements?

Options:

A.

Product

B.

Allocated

C.

Functional

D.

Development

Buy Now
Questions 84

Which of the following charts is most effective for tracking requirements traceability?

Options:

A.

Pareto

B.

Control

C.

Cross-reference

D.

Histogram

Buy Now
Exam Code: CSQE
Exam Name: Certified Software Quality Engineer Exam
Last Update: Jul 15, 2026
Questions: 280

PDF + Testing Engine

$59.99 $171.4

Testing Engine

$44.99 $128.55

PDF (Q&A)

$49.99 $142.82