Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?

1.It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.

2.The scripts should always include logical rules.

3.Manual intervention may be required to carry out remedial action in the event of an error.

4.Performance scripts should be subject to quality control and testing, just like any software product.

5.The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.

SELECT ONE OPTION

Options:

A.

True statements: II, IV.

B.

True statements: 111, V.

C.

True statements: III, IV.

D.

True statements: I, IV.

Buy Now
Questions 5

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.

The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.

Question

Assuming there is one boarding every 5 minutes, what should be the minimum front-end processing capacity of the system for the "departing passenger* user? It is assumed that there will be 12 peaks or maximums per hour.

SELECT ONE OPTION

Options:

A.

100 * 12 + (60-12) *4.69 = 1,425.12 transactlons/hour

B.

100 « 12 + (60 -12) * (10.42 - 4.69) = 1.475.04 transactions/hour

C.

100 * 12 + (60 -12) * 15.10 = 1,924.80 transactions/hour

D.

100 * 12 + (60 -12) * 10.42 = 1.700.16 transactions/hour

Buy Now
Questions 6

What are the main activities of performance test execution?

1.Monitoring all parts of the environment.

2.Setting up the load generation and monitoring tools.

3.Collecting and keeping all results and information related to the test.

4.Generation of a load against the SUT according to a load profile.

5.Parameterize the test scripts.

6.Setting up the system under test.

SELECT ONE OPTION

Options:

A.

The following are performance test activities: III, IV.

B.

The following are performance test activities: I, III. IV.

C.

The following are performance test activities: I. V, VI.

D.

The following are performance test activities: I, III, VI.

Buy Now
Questions 7

Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.

k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• The project follows a sequential development life cycle model.

Question

Which is the right moment in the project to analyze and evaluate the performance risks?

SELECT ONE OPTION

Options:

A.

After design but before coding.

B.

During the requirements activities and again before running the performance test.

C.

During the analysis and design activities as well as, again, before each performance test cycle.

D.

Repeatedly throughout the development phases (including requirements activities) and the performance test itself.

Buy Now
Questions 8

Identify the correspondences between architectures (from 1 to 4) and their characteristic risks (from A to D).

1.Dynamlc/cloud-based systems.

2.Client-server systems.

3.Multi-Tier systems.

4.Distributed systems.

1.Potential problems due to firewalls, packet inspection and server load balancing.

2.Critical workflows or dataflows to, from, or through unreliable or unpredictable remote servers, especially when such servers suffer periodic connection problems or intermittent periods of intense load.

3.Failures related to the correct configuration of features such as distribution, virtualization and scaling, during the Initial configuration or subsequent updates.

4.Inadequate bandwidth or capacity on any individual server.

SELECT ONE OPTION

Options:

A.

1D-2A-3C-4B

B.

1C - 2B - 3D - 4A.

C.

1A-2C-3D-4B.

D.

1C-2A-3D-4B.

Buy Now
Questions 9

If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?

SELECT ONE OPTION

Options:

A.

MMS.

B.

RTE.

C.

WSCL.

D.

LDAP.

Buy Now
Questions 10

Which ONE of the following options is NOT an advantage of aggregating results from performance testing?

SELECT ONE OPTION

Options:

A.

Different stakeholders can see the speed at which a specific business process Is performed end-to-end.

B.

Performance trends can be identified

C.

Performance metrics can be reported in an understandable way.

D.

Business and project stakeholders can see the overall status of system performance.

Buy Now
Questions 11

Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.

1.Alerts and warnings.

2.Concurrency of usage.

3.Operational processes.

4.Resource utilization.

5.Response time.

6.Throughput of data, transactions, and other units of work performed.

1.Operating environment.

2.Business environment.

3.Technical environment.

SELECT ONE OPTION

Options:

A.

1A-2C-3C-4A-5C-6B.

B.

1B - 2B - 3A - 4B - 5C - 6A.

C.

1A-2B-3A-4C-5C-6B.

D.

1A-2B-3C-4C-5A-6C.

Buy Now
Questions 12

Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

•The project follows an iterative and Incremental development life cycle model.

•Development approach: Agile.

Question

Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7

1.The performance test can have a dedicated iteration in a specific way.

2.Performance testing should be performed in a cloud-based performance test environment

3.The performance test may be conducted by a specific team.

4.A performance test cycle must be performed in each iteration by the development team (Agile).

SELECT ONE OPTION

Options:

A.

True statements: IV.

B.

True statements: III, IV.

C.

True statements: II, III.

D.

True statements: I, III.

Buy Now
Exam Code: CTFL-PT_D
Exam Name: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Last Update: Oct 9, 2025
Questions: 40
$66  $164.99
$50  $124.99
$42  $104.99
buy now CTFL-PT_D