A process definition document has been produced for a process that interfaces with two applications: FirstApp and Customer Information (CI). The process requirement is to perform data extractionfrom FirstApp before performing a number of steps in the CI application.
It is estimated that to perform the daily case volume within SLA’s will require 10 robots. Average case time is approximately 10 minutes, with the FirstApp steps requiring only 1 minute to perform.
The client has a limited number of licenses for the FirstApp application and is reluctant to use 10 of these licenses to automate the process.
Which of the below is a valid design option for the project?
The following Object Design has been created for a mainframe banking application.
Which of the following statements about the Object design above are correct? (Choose two.)
A process is required for a client in the banking sector that involves using an application to transfer funds between accounts. A strong security model is in place to prevent any malicious activity but the client is nervous about the risk of external problems, like a power cut leaving a case in an incomplete state or a fault in thesource data causing a case to be duplicated or an excessively large transfer to be made.
What should be included in the solution design? (Choose three.)
The status of a Work Queue can be used as a method of recording that work has been done so far on a Work Queue item.
Please consider the following statements:
1. For MI, to easily see how far an item has beenworked.
2. To aid manual working of exceptions, providing the Item Status can inform staff what work is still outstanding on an item that needs manually.
3. To enable Work Queue items to be safely retried, a process can use the item status to know which updates have already been performed so that they are not repeated.
4. To record the Customer’s Surname
When designing business objects which of the following statements is true? (Choose three.)