Summer Special Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

CDCS Sample Questions Answers

Questions 4

The building requires sprinklers and is equipped with a wet-pipe system. What action should you recommend for the computer room?

Options:

A.

Maintain the current wet-pipe system

B.

Replace the wet-pipe system with a deluge system

C.

Replace the wet-pipe system with a pre-action system

D.

Replace the wet-pipe system with a dry-pipe system

Buy Now
Questions 5

The humidity in the computer room has increased from about 60% up to 85% Relative Humidity (RH). What potential risk does this pose to your equipment?

Options:

A.

No risks at all

B.

The risk of excessive wear and corrosion will increase

C.

The electrostatic discharge (ESD) levels will go up

D.

There will be a cooling risk due to a high wet bulb temperature

Buy Now
Questions 6

You want to make cooling more effective by setting cold aisle temperature to 4 °C (39 °F). Is this acceptable?

Options:

A.

Yes, but only if cooling systems can maintain this continuously

B.

Yes, as long as dewpoint doesn’t go below -9 °C (16 °F)

C.

No, 4 °C (39 °F) is below the allowable ASHRAE range

D.

No, intake air must be exactly 20 °C (68 °F)

Buy Now
Questions 7

You want to manage temperature and humidity only at the facility level in your data center. All servers use front-to-rear airflow. Which location for measurement should you recommend?

Options:

A.

At the back/rear of the server at 50 mm (2 in)

B.

At 1.5 m (5 ft) above the floor, 0.4 m (15 in) in front of the rack

C.

At the front/intake of the server at 50 mm (2 in)

D.

At 1.5 m (5 ft) above the floor, 0.4 m (15 in) at the back of the rack

Buy Now
Questions 8

An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?

Options:

A.

D-Curve

B.

C-Curve

C.

B-Curve

D.

A-Curve

Buy Now
Questions 9

What is the preferred way to measure dust levels in the computer room?

Options:

A.

With an air particle hand-held analyzer

B.

With test coupons

C.

By taking dust samples under the raised floor

D.

By opening up equipment for inspection

Buy Now
Questions 10

A data center is in an area where utility power is highly available—only a few outages per year, typically <1 hour per event and <50 hours/year not available. What type of generators should be installed?

Options:

A.

Continuous generators in at least N+1

B.

A combination of standby, prime, and continuous sized to 500% of the load

C.

Standby generators; no N+1 needed as the risk of a failure to start is negligible

D.

Standby generators, ideally in an N+1 configuration

Buy Now
Questions 11

Which standard defines the requirements for network administration?

Options:

A.

ISO/IEC 30129

B.

ANSI/TIA-568

C.

ASHRAE

D.

ANSI/TIA-606

Buy Now
Questions 12

ICT rack consumes 3 kW with ΔT ~11 °C (20 °F). Calculate required airflow (CFM).

Options:

A.

~1,500 CFM

B.

~1,000 CFM

C.

~500 CFM

D.

~160 CFM

Buy Now
Questions 13

The 'maximum exposed area' of the fire-rated glass is defined by the supplier as 3 sqm/32 sqft. The window area is 4 sqm/43 sqft.

What would be the best option?

Options:

A.

Do not use fire-rated glass due to the size limit and replace it with normal glass.

B.

Split the window in two equal parts using an aluminum frame.

C.

Split the window into parts smaller than specified as the maximum exposed area and ensure fire-rated frames are used.

D.

Split the window in two equal parts fitted together with transparent silicon glue.

Buy Now
Questions 14

What should you consider when using raised floor tiles with air deflectors or louvers?

Options:

A.

Tiles with air deflectors or louvers can be very heavy.

B.

Tiles with air deflectors or louvers will reduce the cooling capacity of the tile.

C.

Tiles with air deflectors or louvers do not allow for a flexible cooling solution.

D.

Tiles with air deflectors or louvers can only be used to cool storage equipment.

Buy Now
Questions 15

The noise levels in the data center are approximately 91 dB (A).

Do employers need to take precautions?

Options:

A.

No, anything less than 100 dB (A) is acceptable.

B.

There are no regulations regarding noise levels inside a building. Regulations only apply to noise pollution outside of the building.

C.

As long as the data is compliant to ISO/IEC 27001 it is acceptable.

D.

Yes, since it is mandated by regulations.

Buy Now
Questions 16

Given: A = attenuation in dB, R = real measured value, M = maximum acceptable value. Which formula should be used to calculate the required attenuation factor of EMF shielding material?

Options:

A.

A = 10 log (R/M)

B.

A = 20 log (M/R)

C.

A = 10 log (M/R)

D.

A = 20 log (R/M)

Buy Now
Questions 17

You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.

Which location for the temperature/humidity measurement should you recommend for the audit?

Options:

A.

At the back/rear of the server at 50 mm/2 inch

B.

At 1.5 meters/5 feet above the floor in the middle of the cold aisle

C.

At the front/intake of the server at 50 mm/2 inch

D.

At 1.5 meters/5 feet above the floor in the middle of the hot aisle

Buy Now
Questions 18

You are working with a customer who requires a guarantee that THDi levels coming from the UPS should not exceed more than 3% THDi. Furthermore, he wants to run a power-efficient data center. The UPS has a 6-Pulse SCR/Thyristor based rectifier. The current load on the UPS is approximately 80%. The customer indicates they are not expecting any changes on the ICT infrastructure for the next 3 years.

What should you recommend?

Options:

A.

Nothing, the UPS will be able to take care of the right levels of THDi

B.

Install a passive harmonic filter on the UPS

C.

Install an active harmonic filter on the UPS

D.

Install an isolation transformer rated at K13 or K20

Buy Now
Questions 19

The computer room has high levels of H2S gas contamination. What is the best option to resolve this issue?

Options:

A.

Vacuum the whole room using a HEPA/S-Class-based filter.

B.

Install air-scrubbers.

C.

Clean the room and racks with a damp/wet cloth.

D.

Provide more air changes per hour by adding more fresh air to the computer room.

Buy Now
Questions 20

What precaution shall be taken for cabling leading into an equipment rack when a data center is in a seismic-prone area?

Options:

A.

Cables should be loosely organized to allow for movement and be latched at the connectors.

B.

Cables shall be tightly organized to the rack and trays to avoid movement.

C.

Cables can be organized in any way as it is not important.

D.

Cables should be replaced by busbar trunking.

Buy Now
Questions 21

FM-200 is phasing out as a halocarbon gas and management has decided to replace this with the more environmentally friendly Novec-1230 gas. Should you use exactly the same formula and parameters to calculate the gas content for the Novec-1230 gas?

Options:

A.

Yes, as long as the temperature in the computer room has not changed

B.

Yes, if you take the difference between the net and gross volume into account

C.

Yes, as long as you use the same units of measure (kg/m³ or lbs/ft³)

D.

Yes, if you change the S-factor of the formula to reflect the gas type used

Buy Now
Questions 22

What is the risk of high levels of hydrogen sulfide (H₂S) in the computer room?

Options:

A.

There is no risk

B.

H₂S impacts the static properties of the floor

C.

H₂S can cause corrosion which impacts reliability of equipment

D.

H₂S impacts gas-based fire suppression system operation

Buy Now
Questions 23

What mainly affects the cooling capacity of a raised floor tile?

Options:

A.

Type of ICT equipment, location of the air conditioner, pressure under the raised floor, allowable temperature in the hot aisle

B.

Relative humidity in the computer room, temperature of the cold air, pressure under the raised floor, construction material of the tile

C.

Percentage of the surface opening, obstruction of the supporting construction, pressure under the raised floor, damper construction

D.

Percentage of the surface opening, airflow direction of the ICT equipment, temperature difference between the air intake and air exhaust of the ICT equipment, construction material of the tile

Buy Now
Questions 24

You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack.

Options:

A.

Approximately 1,500 CFM

B.

Approximately 1,000 CFM

C.

Approximately 500 CFM

D.

Approximately 160 CFM

Buy Now
Questions 25

You have three UPS systems connected in parallel. The UPS systems have an imbalance in the load sharing of approximately 20%.

What should you recommend?

Options:

A.

Review the cable lengths of each UPS to the common busbar

B.

Nothing, there is no reason for any concern

C.

Review the common mode noise levels within the computer room

D.

Review the harmonics levels within the computer room

Buy Now
Questions 26

A 5kW (power consumption) server keeps crashing with the message 'temperature too high'.

The intake temperature is measured at 25 °C/77 °F and a relative humidity (RH) level of 50%.

The exhaust temperature is 29 °C/84 °F and 45% RH.

The raised floor is providing an adequate amount of CFM/CMH at a reasonable velocity.

The pressure under the raised floor is approximately 25 Pa/0.1 inch H₂O.

Analyze the situation and indicate what the most likely cause is for this server to crash.

Options:

A.

Dust inside the server causing issues with convection-based heat transfer

B.

The exhaust temperature is exceeding the ASHRAE recommended values

C.

The raised floor pressure is too low and/or the raised floor tile % opening is not adequate

D.

No cause could be determined as the CFM/CMH of the air conditioning equipment is not stated

Buy Now
Questions 27

When shielding material reaches its saturation point, what will be the impact?

Options:

A.

The shielding material will reach its optimal shielding performance state.

B.

The shielding material will no longer be able to attenuate (reduce) additional EMF.

C.

The shielding material will increase its permeability factor.

D.

The shielding material will reach its maximum electrically charged state.

Buy Now
Questions 28

In which stage of the data center life cycle does testing and commissioning take place?

Options:

A.

Design stage

B.

Implement stage

C.

Operate/optimize stage

D.

Retire stage

Buy Now
Questions 29

The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.

What action, if any, should you recommend for the computer room?

Options:

A.

Maintain the current wet pipe system.

B.

Replace the wet pipe system with a deluge system.

C.

Replace the wet pipe system with a dry pipe system.

D.

Replace the wet pipe system with a pre-action system.

Buy Now
Questions 30

A battery bank has 800 Ah total capacity. How much charging current should the rectifier be able to supply?

Options:

A.

40 A

B.

60 A

C.

80 A

D.

160 A

Buy Now
Questions 31

The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°F.

Taking energy efficiency as the highest priority, which cooling system should you recommend?

Options:

A.

Standard air conditioning units, as spares might not be readily available

B.

Any cooling system can be efficient because the outside air temperature will not influence the temperature of the air intake of the ICT equipment

C.

Waterside economizer

D.

Airside economizer

Buy Now
Questions 32

A new facility requires electrical distribution of 100A to be installed in the computer room, 1 m (3 ft) above sensitive IT equipment. What type of system minimizes EMF impact?

Options:

A.

Install single-phase power cabling

B.

Install three-phase power cabling based on three individual core wires

C.

Install bus bar trunking

D.

Install three-phase power cabling based on a combined cable (e.g., XLPE)

Buy Now
Questions 33

The data center has been in operation for about 1 year and 2 months. The dust levels in the computer room are relatively high.

What is the most likely root cause?

Options:

A.

The cleaning crew is not doing their work properly

B.

Every computer room has high dust levels due to constant high-speed air movement

C.

Low pressure in the computer room

D.

Floorboards are most likely not fitted correctly

Buy Now
Questions 34

What is the main reason to install Earth Leakage protection?

Options:

A.

Protection of ICT equipment against high-frequency noise currents

B.

Protection of human lives

C.

Improvement of the data center grounding/earthing system

D.

Protection against lightning strikes

Buy Now
Questions 35

What is the effect of having a damper (in open position) construction in a raised-floor tile?

Options:

A.

Dampers allow for a higher supply air temperature

B.

Dampers increase the air volume by approximately 10%

C.

Dampers reduce the air volume by approximately 10%

D.

Dampers can be used when there is a high rate of temperature change in the computer room

Buy Now
Questions 36

An air-conditioner unit needs to be selected. Two types are available:

Unit-A has a Sensible Heat Ratio (SHR) of 0.7.

Unit-B has a Sensible Heat Ratio (SHR) of 0.9.

From an efficiency point of view, which one should be selected?

Options:

A.

It does not matter, as the Sensible Heat Ratio has nothing to do with efficiency.

B.

Not relevant, as Sensible Heat Ratio is only specified for air-conditioner equipment to indicate the ratio between intake temperature and exhaust temperature.

C.

Unit A

D.

Unit B

Buy Now
Exam Code: CDCS
Exam Name: EXIN EPI Certified Data Centre Specialist
Last Update: Oct 13, 2025
Questions: 120
$66  $164.99
$50  $124.99
$42  $104.99
buy now CDCS