After an Implementation Engineer installs a new FlashArray and runs health checks, they see that Phonehome and Remote Assist are NOT working correctly.
Which outbound port needs to be open for all management ports (physical and virtual)?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?
After runningpuredb run giveback --safecommand once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade.
Which command should the Implementation Engineer run on the new controller to determine its model?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?
Which command should an Implementation Engineer use to allow Support access to an array?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray.
After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?