Spring Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65percent

Welcome To DumpsPedia

H20-923_V1.0 Sample Questions Answers

Questions 4

The default address of the WAN1 port on the ECC800-Pro is

Options:

A.

192.168.0.10

B.

192.168.248.10

C.

192.168.248.1

D.

192.168.8.10

Buy Now
Questions 5

Which of the following are the user roles of Power Partner?

Options:

A.

Service manager of a rep office

B.

Startup engineer

C.

Inventory operations manager

D.

Project manager

E.

DOC

F.

Service engineer

Buy Now
Questions 6

Which of the following statements are true?

Options:

A.

When the UPS works in normal mode, you can directly turn on the maintenance bypass switch.

B.

When the UPS works in static bypass mode, if the mains input outage occurs suddenly, the UPS automatically switches to battery mode.

C.

Huawei UPS5000-H is a modular UPS. If a module fails, it can be replaced online.

D.

When mains and bypass input of the UPSs share one power source, if mains outage occurs, the UPS cannot work in bypass mode.

Buy Now
Questions 7

When the mains supply is stable, the UPS5000-H mainly works in which mode after ECO is configured?

Options:

A.

Battery

B.

Normal

C.

Static bypass

D.

Maintenance bypass

Buy Now
Questions 8

Which of the following is not a scenario-based solution for Huawei data center products?

Options:

A.

FusionDC800

B.

FusionDC1000

C.

FusionModule500

D.

FusionModule2000

Buy Now
Questions 9

If the startup password authentication for a smart module is not complete, the ECC800-Pro WebUI and app cannot be used for commissioning.

Options:

A.

True

B.

False

Buy Now
Questions 10

After installing the FusionCol8000-C (110–440 kW), inject water to preserve the pressure for the chilled water pipes to how many MPa. After 30 minutes, check that no leakage occurs. Preserve the pressure for 24 hours. If the pressure drop is less than 0.01 MPa and no leakage occurs, the pipes do not leak.

Options:

A.

0.8

B.

0.5

C.

1

D.

1.2

Buy Now
Questions 11

In alarm management, the status can be identified by masking rules.

Options:

A.

Invalid

B.

Standard

C.

Maintenance

D.

Valid

Buy Now
Questions 12

If a component runtime overdue alarm is generated for an air conditioner, you can clear the device running time on the "Maint > Performance Maintenance" screen.

Options:

A.

True

B.

False

Buy Now
Questions 13

Which of the following can be used to start the inverter of the UPS5000-H?

Options:

A.

UPS WebUI

B.

ECC

C.

UPS LCD

D.

NetEco

Buy Now
Questions 14

Through device management, you can view the information about

Options:

A.

Overview

B.

Alarm

C.

Signal

D.

Service period

Buy Now
Questions 15

Which of the following are main components of Huawei indirect evaporative cooling system?

Options:

A.

Compressor

B.

Air filter

C.

Water pump

D.

Spray system

E.

Heat exchanger

F.

Fan

Buy Now
Questions 16

If the SPD indicator of a smart module is green, the SPD is running properly. If the SPD indicator is red, the SPD is faulty and must be replaced immediately.

Options:

A.

True

B.

False

Buy Now
Questions 17

The frequency of power supply equipment can be 50 Hz, 60 Hz, or 70 Hz.

Options:

A.

True

B.

False

Buy Now
Questions 18

Which layout principle best aligns with Huawei data center facility design for improving cooling efficiency and reducing mixing of hot and cold air?

Options:

A.

Distribute racks randomly to balance floor loading

B.

Implement hot aisle/cold aisle arrangement with aisle containment

C.

Place CRAC/CRAH units only along the perimeter without airflow planning

D.

Keep all cabinet doors open to minimize local hotspots

Buy Now
Exam Code: H20-923_V1.0
Exam Name: HCSP-Field-Data Center Facility V1.0
Last Update: Apr 1, 2026
Questions: 60
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now H20-923_V1.0