A commercial general liability insurer is initiating a new Guidewire implementation.
What are the primary advantages of leveraging Guidewire's standard user story cards during the initial phases of this project?
Choose 2 options.
A Business Analyst at PinnacleSure is preparing for an upcoming sprint. They are reviewing User Story Cards to ensure they accurately reflect the refined requirements.
User Story Cards are refined throughout a Guidewire project to capture changing business requirements and to specify what will be (or has been) __________________ for the project.
How are Page Configuration Format (PCF) files used in the Guidewire development environment?
From the answer below, select the option that best describes Guidewire Accelerators __________________.
A _______ key field stores a reference to a related object in another entity. It defines a unidirectional relationship. For example, AssignedUser in Claim is the name of a field that points to a specific user in the User entity.
Which of the activities below could assist an analyst in determining whether changes to application logic are needed? (Choose two)
A well written user story follows the INVEST model. INVEST is an acronym that stands for:
Which of the following are deliverables during the Inception Phase of a project? choose two
An analyst is preparing for a requirements elaboration workshop where the business has historically expressed a strong desire to retain many legacy system functionalities.
Which strategies should the analyst employ to follow best practices? choose two
A well-written and appropriately versioned requirements document is MORE likely to: choose two
Elaborate Requirements, Confirm Scope, Plan Project / Sprints, and Infrastructure Sizing are all part of this project phase?
When a new requirement for a commercial general liability product necessitates a change to the Guidewire data model, business analysts are responsible for defining the requirements for _____________________ and _____________________ that the base application does not store.
Select each phase of the project lifecycle that reference User Story Cards in some manner: choose two
An insurer is developing a new Commercial Property line of business and aims to leverage as much pre-built content as possible to accelerate the implementation. Which of the following are specifically designed to provide ready-to-use policy products or a standardized process and application for developing a policy product?
The _______________ documents the entities and typelists in a Guidewire application. This tool includes information for both the base application entities and custom extensions.
According to the training, as a non-developer, what are the common activities you may be involved in related to integrations?
A project team is tasked with implementing several common integration patterns for their new Guidewire Cloud application. They want to maximize efficiency and leverage existing Guidewire resources to provide a strong starting point for development efforts. Which resources should the team prioritize utilizing as pre-built starting points for these solutions?
Which of the following are types of integration mechanisms used with Guidewire products?
A Quality Analyst is reviewing the test data setup for a Guidewire PolicyCenter project. To ensure comprehensive testing, the analyst needs to understand how different data elements are linked within the system. Which two data modeling concepts are critical for understanding data relationships and dependencies in InsuranceSuite?
A Quality Analyst is reviewing how a standard Guidewire InsuranceSuite application has been adapted for a specific insurer. Which approaches represent key ways in which the application's behavior and appearance can be tailored without writing extensive custom code?
Choose 2 options.