Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

CTAL-TAE Sample Questions Answers

Questions 4

As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.

Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?

  • Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
  • Does the test automation tool support a licensing scheme that allows accessing different sets?
  • Does the testautomation tool have a large feature set, but only part of the features will be sets?
  • Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?

Does the test automation tool need to install specific libraries that could impact the SUT?

Options:

A.

A and C

B.

A and E

C.

B and E

D.

C and D

Buy Now
Questions 5

Which of the following success factors for a test automation project is TRUE?

Options:

A.

Automated tests must be designed to capture only the datathat is strictly needed for comparing expected and actual results

B.

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.

The test cases to be automated must have a high dependency on particular data values

D.

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Buy Now
Questions 6

A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

Options:

A.

The duration of the pilot project was too short –it should last unit the success factors are achieved

B.

The target defined for the business case is too accurate –it should not be measureable

C.

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.

The target defined for the business case seems difficult to hit – it should be realistic

Buy Now
Exam Code: CTAL-TAE
Exam Name: ISTQB Certified Tester Advanced Level, Test Automation Engineering
Last Update: Apr 24, 2024
Questions: 40
$64  $159.99
$48  $119.99
$40  $99.99
buy now CTAL-TAE