Questions 4

Why would you use a non-disclosure agreement?

Options:

A.

To protect parties, where information has been shared that is not in the public domain

B.

To allow parties the freedom to disclose confidential information to the public domain

C.

To agree between parties what information is and is not confidential and what can be in the public domain

D.

To give parties permission to share all information in the public domain

Buy Now
Questions 5

In order to monitor supplier’s performance, an organization decides to draft performance management frameworks. Which of the following are the components of a performance management framework? Select THREE that apply:

Options:

A.

Targets

B.

KPIs

C.

Consequences

D.

Indemnity

E.

Force majeure

F.

Justification

Buy Now
Questions 6

Which of the following is the contract provision that relieves the parties from performing their contractual obligations when certain circumstances like natural disasters, terrorist attacks, etc arise?

Options:

A.

Indemnity clause

B.

Liquidated damage clause

C.

Insurance clause

D.

Exclusion clause

Buy Now
Questions 7

In the application of price adjustment formulae, which of the following would be acceptable for a supplier to increase its selling price?

Options:

A.

Rising share prices

B.

Rising fuel costs

C.

Rising market expectations

D.

Rising incidence of defects

Buy Now
Questions 8

Which of the following are always considered as minimum preconditions for a contract? Select TWO that apply:

Options:

A.

Specification

B.

Promise

C.

Omission

D.

Consideration

E.

Intention to be bound

Buy Now
Questions 9

Since services are intangible, so KPIs for services must be qualitative in all circumstances. Is this statement correct?

Options:

A.

No, KPIs for services must always be quantitative so that they can be measured easily

B.

No, some KPIs for services are measurable by means of outcome, time and space performed

C.

Yes, quantitative KPIs are limited to timeliness of supply of goods, defective rates and in-full quantities, which are applied to monitor supplier of physical goods

D.

Yes, the only measure mattered to supply of services is end-users' satisfaction

Buy Now
Questions 10

Maximum Score 1

Buyer O has placed an order for the supply and installation of six new servers for a total amount of £600,000 from Supplier A. Which of the following could potentially be treated as examples of a liquidated damages clause within the contract for the supply of the servers?

    If the supplier delivers any of the servers late, £1,000 per server will be deducted from the order per day

    This contract is subject to delay remedies of £X - the amount to be agreed by both parties during delivery

    The sum for breach of the completion date for the order is £40,000 per day up to a maximum of 50% of the contract price

    If the performance of any of the servers degrades within five years, a full refund of £600,000 will be provided

Options:

A.

1 and 2 only

B.

3 and 4 only

C.

1 and 3 only

D.

2 and 4 only

Buy Now
Questions 11

What are disadvantages of a buyer contracting on the supplier's terms? Select TWO that apply.

Options:

A.

Materials will not be changed without the buyer’s consent

B.

The buyer would not be subject to any indemnity clause obligations

C.

Title to goods may remain with the supplier until payment is received

D.

Goods received late will incur penalties for the supplier

E.

Prices may increase without notification to the buyer

Buy Now
Questions 12

In which of the following conditions, request for quotation produces the best results?

Options:

A.

With an ambiguous specification

B.

Under framework agreements

C.

Under a complex process

D.

With strategic items

Buy Now
Questions 13

Various terms are used to qualify a party's obligations under contract. Which of the following gives absolute obligation?

Options:

A.

Reasonable endeavours

B.

Shall

C.

Best endeavours

D.

Should

Buy Now
Questions 14

A retailer prefers to display its best selling products and promotion programme on the building windows. According to rule of contract formation, this act will generally constitute...?

Options:

A.

An invitation to treat

B.

A legal capacity

C.

An offer

D.

A mailbox rule

Buy Now
Questions 15

Maximum Score: 1

A service contract for cleaning is due for expiry after a five year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

Options:

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Buy Now
Questions 16

Under a framework agreement, which of the following are supplier selection mechanisms? Select TWO that apply:

Options:

A.

Rescission of contract

B.

Mini competition

C.

Contract for lease

D.

Direct call-off

E.

Call off contract

Buy Now
Questions 17

A procurement manager is preparing a long-term contract with a major supplier. She decides to use the variable pricing arrangement using price indices. The payment terms describe the circumstances and mechanism where the price is allowed to change. In order to successfully manage this type of contract, the buying organisation should have...?

Options:

A.

Good market knowledge

B.

Selection of base year

C.

Value for money

D.

Economy of scale

Buy Now
Questions 18

CMS Corp goes into a gainshare agreement with the contractor, EIP Ltd. Both parties agree that the final fee will be calculated on target cost - target fee basis. Which of the following will affect the final fee payable in this gainshare agreement? Select TWO that apply:

Options:

A.

Accrual expense

B.

Final price

C.

Purchaser goodwill

D.

Supplier share

E.

Actual cost

Buy Now
Questions 19

Which of the following is a true statement on express and implied terms?

Options:

A.

Express terms always take precedent over implied terms

B.

Implied terms may derive from oral negotiations

C.

Express terms must always be in writing

D.

Express terms must be prepared by the party with expert knowledge

Buy Now
Questions 20

Maximum Score 1

The Bravo Engineering Company is negotiating a maintenance contract with Express Deliveries Ltd. This large logistics company uses modern robotic storage and picking warehouse machinery to identify, sort, and facilitate over 200,000 orders each day. The volatile nature of the business means that the parties should build maximum flexibility into the performance management aspects of the contract.

Which of the following would be most appropriate to set out the parties’ obligations under the maintenance contract?

Options:

A.

A formal appendix to the maintenance contract

B.

A non-binding side-agreement to the maintenance contract

C.

A Service Level Agreement issued after the maintenance contract

D.

A clause that disclaims all accountability for the contract for the buyer

Buy Now
Questions 21

Which of the following regulates barriers to the trade of goods between Member States of WTO?

Options:

A.

NAFTA

B.

GATT

C.

CISG

D.

TRIPS

Buy Now
Questions 22

Maximum Score 1

A construction company wishes to place the contract for the building of a new hotel to a principal contractor using a model form contract. Which of these is an advantage of using a ‘model form contract’?

Options:

A.

It avoids the requirement to create complex contracts each time but can be adapted to suit particular circumstances

B.

Formulae or indices can be included to assess any additional supplier’s claims for contract price adjustment

C.

Incentive payment terms can be included to reward the supplier for attainment of cost savings

D.

Legal advice is still required if significant amendments or variations are to be made to the contract

Buy Now
Questions 23

A Key Performance Indicator (KPI) states "Measure the effort exerted by the project team to control costs throughout the contract duration.” Is this KPI appropriate for measuring the management of contract costs?

Options:

A.

Yes, increased efforts to control costs ensure that costs will be managed effectively

B.

No, the metric is not sufficiently specific and measurable

C.

No, the project team is not responsible for managing costs

D.

Yes, the KPI is achievable, relevant and time-bound

Buy Now
Questions 24

Which of the following is the procedure that makes no further competition under a framework agreement?

Options:

A.

Closed system

B.

Direct call-off

C.

Standing offer

D.

Blanket order

Buy Now
Questions 25

Which of the following should be applied when measuring frequency of on-time deliveries during a contract period?

Options:

A.

Qualitative assessment

B.

Numerical measure

C.

Binary measure

D.

Subjective measure

Buy Now
Questions 26

Solus Trading has begun a project to improve the level of delivery performance from its suppliers. They need to develop a key performance indicator (KPI) to measure the performance improvement. Which KPI would be suitable to use?

Options:

A.

Percentage of on-time in full

B.

Percentage of rejects and returns

C.

Percentage of cost reduction

D.

Percentage of customer complaints

Buy Now
Questions 27

A buyer and a supplier plan to sign a contract with cost-plus arrangement. If the cost base is $350 and the markup component is 11% then the invoice price will be...

Options:

A.

393.26

B.

388.5

C.

368.5

D.

362

Buy Now
Questions 28

A tire manufacturer entered into a contract with a distributor. In the contract, the distributor is prohibited from selling the tire under the price list. The distributor must pay $5 for each tire sold in breach. The amount of $5 is known as...?

Options:

A.

Penalty

B.

Quantum meruit

C.

Liquidated damages

D.

Caveat Emptor

Buy Now
Questions 29

Which of the following will always give rise to a claim of misrepresentation?

1. Silence

2. False thought

3. Statement of fact

4. Representation by conduct

Options:

A.

1 and 2 only

B.

1 and 3 only

C.

3 and 4 only

D.

2 and 4 only

Buy Now
Questions 30

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT for designing, building and managing the new CRM system. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Cleveland brought the case to the court and sought rescission of contract with Digital. Is Cleveland’s claim appropriate in this case?

Options:

A.

Yes, because Cleveland needs to seek rescission first before claiming for damages

B.

Yes, because both parties agreed with rescission of their contract

C.

No, because the work had been carried out which could not be returned

D.

No, because the contract does not include any provision on rescission

Buy Now
Questions 31

Which of the following are NOT covered by CISG? Select TWO that apply:

Options:

A.

Transfer of risks

B.

Contract validity

C.

Remedies for breach of contracts

D.

Liability of the seller for death or personal injury

E.

Liability to pay damages

Buy Now
Questions 32

Which of the following is the model form of contract for construction which is recommended by World Bank?

Options:

A.

ITC

B.

JCT

C.

CIPS

D.

FIDIC

Buy Now
Questions 33

In which scenarios would it be appropriate for a procurement organisation to include contractual indexation and/or price adjustment formulae clauses in a services contract? Select TWO that apply.

Options:

A.

The supplier’s directors shall be paid dividends during the term

B.

The supplier’s contract staffing costs will be subject to regulatory increase

C.

The material components were tendered as fixed costs for the term

D.

The supplier’s preference is to switch to a more expensive material specification

E.

The market rates for the supplier's material costs will vary during the term

Buy Now
Questions 34

A category buyer is purchasing medical gases for a hospital, but is experiencing volatile and unfavourable market conditions due to multiple global external factors. Owing to the volatility, the hospital's finance director has tasked the buyer with providing certainty of costs for the next 18 months. Which of the following pricing methods will enable budgeting certainty, despite the highly volatile market conditions?

Options:

A.

A fixed pricing arrangement

B.

A cost plus award fee agreement

C.

Fixed pricing with economic price adjustments

D.

A penetration pricing strategy

Buy Now
Questions 35

Maximum Score 1

When a company has decided to outsource part of its operation, the contract will need to include a number of key contract terms to minimise risk. Which of the following should be included?

    A confidentiality clause designed to protect either party

    A clause stating how long the service is to be outsourced

    A clause stating how long the employees can take for holiday

    A contract variation and price adjustment clause

Options:

A.

1 and 4 only

B.

1 and 2 only

C.

3 and 4 only

D.

2 and 4 only

Buy Now
Questions 36

Ellie is a junior buyer and her supplier asks her to use their contract terms for an order. Which of the following are clauses that may be included in the supplier contract that could pose a risk to Ellie's business? Select TWO that apply.

Options:

A.

If the contract lists the full specification

B.

If the contract includes supplier contact details

C.

If the contract includes a cash discount for early payment

D.

If the contract includes a price escalation clause

E.

If the contract includes exclusion clauses

Buy Now
Questions 37

Which of the following should be done by procurement professionals right after obtaining a pre-written specification for a critical item so that the added value will be the greatest?

Options:

A.

Evaluate tender or quotation

B.

Select the best supplier

C.

Challenge the used specification

D.

Issue invitation to tender or request for quotation

Buy Now
Questions 38

Maximum Score 1

A purchase order has been raised for £5,000. It allows the user department to order items of a £50 value when they need them. This is an example of what type of order?

Options:

A.

Shut-off

B.

Stand-off

C.

Straight-off

D.

Call-off

Buy Now
Questions 39

Buyer D agrees a contract with Supplier C which includes the words 'to be agreed' in relation to the date for delivery of the goods. At the time of the contract, Buyer D is aware that the goods take two days to produce and one day to deliver. Buyer D contacts the supplier one week later, requesting the goods be delivered the following day. Supplier C is unable to deliver the next day but rather delivers the goods three days later. Is it the case that Buyer D can legally refuse to pay for the goods because Supplier C is in breach of contract?

Options:

A.

Yes, because the delivery date is an express term within the contract

B.

Yes, because the goods should have been delivered within three days

C.

No, because the goods were delivered within a reasonable time

D.

No, because there is a contract in place and the delivery date does not matter

Buy Now
Questions 40

Which of the following is a benefit to the buyer of using model form contracts?

Options:

A.

The terms used are advantageous to the buyer

B.

It reduces time and costs in developing a formal contract

C.

No legal advice is required as variations are not accepted

D.

Most suppliers are unfamiliar with the terms used

Buy Now
Questions 41

Maximum Score 1

A service contract for cleaning is due for expiry after a five-year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

Options:

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Buy Now
Questions 42

Which of the following are likely to be implied terms in a contract? Select TWO that apply:

Options:

A.

Legal precedence

B.

Definition & interpretation

C.

Contract appendix

D.

Statute

E.

Contract clause

Buy Now
Questions 43

Which of the following is used to detail the complex matter that may be verbiage to the main document?

Options:

A.

Contract variation

B.

Schedule

C.

Subcontracting

D.

Standard terms and conditions

Buy Now
Questions 44

The cost in cost reimbursable contract is...?

Options:

A.

Actual cost

B.

Variable cost

C.

Fixed cost

D.

Profit

Buy Now
Questions 45

The nature of the "Battle of the forms" is when both buyer and supplier are attempting to ...

Options:

A.

secure their own terms and conditions

B.

create a collaborative relationship

C.

create a performance specification

D.

form a joint contract

Buy Now
Questions 46

Which of the following is the reason why liquidated damage clauses are embedded into a contract?

Options:

A.

Because liquidated damages are the only remedy

B.

To penalise the supplier for their wrongdoing

C.

To avoid argument on correct measure of damage

D.

Because compensation will be awarded immediately

Buy Now
Questions 47

Which of the following are most likely to be liabilities of suppliers under a guarantee clause?(SelectAny Two)

Options:

A.

TWO that apply

B.

Repair

C.

Decommissioning

D.

Upgrading

E.

Replacement

F.

Installation

Buy Now
Questions 48

Which of the following could be the last document in a 'battle of the forms'?

Options:

A.

Quotation

B.

Order acknowledgement

C.

Purchase order

D.

Invitation to Tender (ITT)

Buy Now
Questions 49

When writing an implementation section for an IT requirements specification, which factors would be appropriate for inclusion? Select TWO that apply.

Options:

A.

Required response timeframes for service requests

B.

Mandatory training required for supplier’s staff

C.

Details of applicable legal and regulatory standards

D.

Integrations required with existing systems

E.

Lists of technical terms and abbreviations

Buy Now
Questions 50

Parkers Medical Supplies is a distributor of first aid supplies to supermarkets nationwide. A new supplier has approached Parkers with an offer to supply a new and innovative product. Parkers have never dealt with this company before, so are looking to ensure that the new supplier has the necessary insurance cover as the new product could potentially cause personal injury. Which type of insurance should Parkers insist the new supplier takes out?

Options:

A.

Employers' liability

B.

Public liability

C.

Product liability

D.

Professional indemnity

Buy Now
Questions 51

Maximum Score: 1

Which of the following are examples of a lack of 'capacity' to enter into a contract?

    A contracting party has a severe mental disorder

    A contracting party has failed to concentrate during negotiations

    A contracting party is 19 years of age

    A contracting party (corporation) has acting 'ultra vires' (beyond its defined legal powers)

Options:

A.

1 and 2 only

B.

1 and 4 only

C.

2 and 3 only

D.

2 and 4 only

Buy Now
Questions 52

Maria is working on a new one-off construction project and is looking to expand a factory. A requisition comes through for an outright purchase of a digger. Maria changes this to a lease order instead. Is she right to do so?

Options:

A.

No, buyers should not challenge or change a requisition

B.

Yes, this saves money and the business will not end up with an unwanted asset

C.

No, diggers are not allowed to be leased

D.

Yes, equipment should always be leased and never purchased

Buy Now
Questions 53

Which of the following are express terms?

Sale by description

Fitness for purpose

Passing of risk

Passing of title

Options:

A.

1 and 2 only

B.

2 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Buy Now
Questions 54

Key performance indicators (KPIs) are used to measure supplier performance. Which of the following are KPIs that may be used? Select THREE that apply.

Options:

A.

Employee attendance

B.

Cost management

C.

Contract standardisation

D.

Quality conformance

E.

Timeliness of delivery

F.

Style of negotiation

Buy Now
Questions 55

In order to reduce the internal cost of administration from the raising of high-volume, low-value orders such as office stationery, a procurement manager implements the use of call-off orders for such circumstances. Is this an acceptable thing to do?

Options:

A.

No, the procurement manager fears that they will lose staff and prefers to keep the administration costs high

B.

No, as the role of the administration staff is to keep a check on the items being ordered and they would lose this ability

C.

Yes, as the procurement manager will be able to track more easily the volume of small orders and where the spend is occurring

D.

Yes, the use of a blanket order cuts the staff administration time and paperwork that would be involved in numerous small orders

Buy Now
Questions 56

A construction company is undertaking a housing development project. They need lots of bricks and other building materials, but the construction site doesn't have large area for storage of materials.Therefore, the company's suppliers must deliver the building materials with fixed quantity and at fixed time intervals. What type of contract is used between the construction company and its suppliers?

Options:

A.

Framework agreement

B.

Spot transaction

C.

One off contract

D.

Call off contract

Buy Now
Questions 57

Which of the following will be always automatically deemed as a consideration?

Options:

A.

Promise to perform over and above an existing obligation

B.

Promise given to a third party

C.

Implied consideration

D.

Past consideration

Buy Now
Questions 58

Standard terms and conditions should become the governing terms for which group of items?

Options:

A.

Leverage items

B.

Bottleneck items

C.

Strategic items

D.

Routine items

Buy Now
Questions 59

Foodstuffs may arrive from an overseas supplier in a deteriorated state. Is this covered under the implied term of 'satisfactory quality'?

Options:

A.

No, it is sale by sample

B.

No, it is sale by description

C.

Yes, the food is not of a reasonable standard

D.

Yes, as the title has not passed yet

Buy Now
Questions 60

Which of the following sections would typically be included in a specification for services? Select THREE that apply.

Options:

A.

A description of the service requirements

B.

The tender evaluation methodology

C.

The fault rectification timeframes

D.

The service start and end dates

E.

The terms and conditions of the contract

F.

Questions relating to methods

Buy Now
Questions 61

Which of the following should be specially noticed in market dialogue with suppliers in specification development?

Options:

A.

Both parties must respect confidentiality

B.

The buying organisation must avoid social media at all cost

C.

Market dialogue is banned in the public sector

D.

Market dialogue should only be conducted with well-known supplier

Buy Now
Questions 62

Which of the following is most likely to be an one-off contract?

Options:

A.

Franchise Agreement

B.

Framework Agreement for supply of mono-crystalline silicon

C.

Contract for construction of a power plant

D.

Commercial lease agreement of an office building

Buy Now
Questions 63

SFO procurement manager sent a request for quotation to Vogon International in which he determined the contract terms and specification. In SFO's standard terms and conditions, it is stated that 'Goods shall be delivered and Services performed by the applicable Delivery Date. Supplier must notify Buyer 3 days prior to the Delivery Date if Supplier is likely to be unable to meet a Delivery Date.'

Vogon replied with a quotation without any amendment to SFO's terms & conditions. The SFO procurement manager found the prices were reasonable and submitted to senior management. Senior management team accepted that quotation and sent a notification to Vogon. On the Delivery Date, Vogon said they had no capacity to supply the product as the quotation due to a workers' strike. Did Vogon breach any agreement with SFO?

Options:

A.

No, because Vogon had no intention to be bound by the quotation, therefore, it didn’t constitute a contract

B.

No, because the strike is a force majeur event, so Vogon did not breach any contract with SFO

C.

Yes, because the contract was formed since Vogon had sent the quotation as an acceptance to SFO’s offer

D.

Yes, because the contract had been formed between SFO and Vogon with the quotation as an offer and the notification as an acceptance

Buy Now
Questions 64

ABC Ltd is a UK based company. It plans to enter into a contract with XYZ Ltd which is based in Singapore. Which of the following are the mandatory elements for the contract between ABC Ltd and XYZ Ltd to be legally binding? Select THREE that apply.

Options:

A.

All parties must have capacity to contract

B.

The two parties must have intention to be bound

C.

The invitation to tender must be sent by the agreed deadline

D.

There must be an offer and an acceptance

E.

An amount of money must be paid upfront

F.

There must be an invitation to treat

Buy Now
Questions 65

Which of the following are most likely to be substantive elements of the specification of a truck? Select TWO that apply:

Options:

A.

Guarantee

B.

Foreword

C.

Expected lifespan

D.

Ethics

E.

Abbreviation

Buy Now
Questions 66

Which of the following would be considered as advantages of an industry model form contract?

It provides greater flexibility for negotiation

It reduces the cost of contract development

It is usually designed to be fair to both parties

It removes the need for the buyer to understand it

Options:

A.

1 and 2 only

B.

2 and 4 only

C.

1 and 3 only

D.

2 and 3 only

Buy Now
Questions 67

Which of the following would you expect to see in an Invitation to Tender (ITT)?

Options:

A.

Supplier rates

B.

Liquidity ratios

C.

Delivery milestones

D.

Best and Final Offer (BAFO)

Buy Now
Questions 68

Maximum Score 1

Adornical Toys Ltd have recently declared their commitment to international labour standards. Karim is sourcing a supplier for a new range of wooden toys and is keen to ensure that the organisation's corporate objectives are met. Which of the following approaches could he include as part of his specification requirements to achieve this labour outcome?

Options:

A.

Certification to an ethical trading initiative

B.

Use ecologically certified raw materials

C.

Accreditation to waste reduction schemes

D.

Formally measure their carbon footprint

Buy Now
Questions 69

A procurement manager is setting KPIs measurement for user satisfaction. He also wants to encourage users to share the reason why they feel the way they do. Which of the following types of KPI should the procurement manager apply?

Options:

A.

Quantitative measure

B.

Numerical measure

C.

Binary measure

D.

Qualitative assessment

Buy Now
Exam Code: L4M3
Exam Name: Commercial Contracting
Last Update: Nov 29, 2025
Questions: 233
$57.75  $164.99
$43.75  $124.99
$36.75  $104.99
buy now L4M3