Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

PMI-PBA Sample Questions Answers

Questions 4

Which of the following would be the best practice in product validation?

Options:

A.

The measurement of the requirement should be based on the average of two or more evaluations.

B.

There should be two separate measurements for evaluating each functional requirement.

C.

Two or more testers should test the product using the same test cases so that their evaluations are consistent.

D.

The evaluation criteria should be the same as what was used to measure the requirement.

Buy Now
Questions 5

A project team has been assembled to reduce production costs. The business analyst is working with the project team to review and approve requirements. A stakeholder from the assembly line area has an issue with one of the requirements since it is dependent on using existing equipment that is set to be retired within the next six months.

Which of these techniques would the business analyst use to manage issues identified by stakeholders with requirements to ensure that

those issues are resolved?

Options:

A.

A Interviews

B.

Process modeling

C.

Estimation

D.

Problem tracking

Buy Now
Questions 6

A major stakeholder wants to know how the implementation of new features in the development of a product is progressing. Which of the following should be reported to the stakeholder?

Options:

A.

Distribution of project changes

B.

Requirements status during the project development cycle

C.

Number of requirements approved vs. number of requirements rejected

D.

Number of requirements tested and approved

Buy Now
Questions 7

The project manager is beginning to prepare for a test readiness review with the customer. The project manager knows that the customer will want a summary of requirements that have been rejected or deferred. The project manager has requested that the business analyst provide a list of rejected and deferred requirements.

What should the business analyst have done to complete this request?

Options:

A.

A Set up a change control board to track the number of rejections.

B.

Limit the number of rejected requirements on the project.

C.

Track rejected requirements in the system requirements verification matrix.

D.

Spend more time up-front reviewing the requirements to limit rejections.

Buy Now
Questions 8

The business analyst is planning an approach to formally manage updates to requirements that may be requested by stakeholders.

What should the business analyst do?

Options:

A.

Develop a change control process.

B.

Obtain approval from the project sponsor.

C.

Document changes as they occur.

D.

Hold firm on scope and reject changes.

Buy Now
Questions 9

The requirements baseline is ready for sign-off when the requirements are:

Options:

A.

complete, clear, verified, and adopted.

B.

consistent, analyzed, complete, and validated.

C.

justified, clear, consistent, and verified.

D.

clear, consistent, complete, and validated.

Buy Now
Questions 10

The project sponsor needs to know which requirements will be implemented. Which of the following would be the most valuable for a business analyst to provide?

Options:

A.

Requirements traceability matrix

B.

Requirements baseline document

C.

Requirements management plan

D.

Requirements impact analysis

Buy Now
Questions 11

A new product was designed and delivered to the customer. The product exceeded customer expectations but did not meet the baseline budget for the product. What could be the issue?

Options:

A.

Risks identified in the risk management plan were not addressed properly.

B.

There is no issue since the product exceeded the customer expectations.

C.

The sponsor approved the release of the product without reviewing the budget.

D.

Requirements were not properly traced and monitored.

Buy Now
Questions 12

Which tool provides combined functionality for business analysis and quality assurance activities?

Options:

A.

Functional specification tool

B.

Requirements traceability tool

C.

System use case modeling tool

D.

Solution quality assurance tool

Buy Now
Questions 13

How should a business analyst determine whether a solution satisfies business requirements?

Options:

A.

By reviewing the results of user acceptance testing

B.

By evaluating the solution against the project charter

C.

By conducting a brainstorming session with end users

D.

By reviewing the traceability matrix

Buy Now
Questions 14

A company wants to procure a tool to improve customer satisfaction and loyalty. Which of the following documents would provide basis for analyzing vendor products?

Options:

A.

Storyboard

B.

Project charter

C.

Business case

D.

Survey

Buy Now
Questions 15

Company A would like to enter into a new market. The business analyst has been assigned to a project for which nobody in Company A has any prior experience. The project manager has asked the business analyst to assist in resource planning.

What should the business analyst recommend to the project manager?

Options:

A.

Ask the developer's team manager for more resources.

B.

Review the business case to reconsider the project.

C.

Hire external subject matter experts for the core project team.

D.

Ask the sponsor for more resources.

Buy Now
Questions 16

A business analyst is attempting to elicit requirements on a current project. The business subject matter experts (SMEs) from various departments in the company question how the solution will work with their various systems. Which modeling technique should the business analyst use to depict how the solution will work with all of the company's systems?

Options:

A.

Data modeling

B.

B. Interface modeling

C.

Rules modeling

D.

Enterprise modeling

Buy Now
Questions 17

Company A has initiated a project to update their online ordering system. The business analyst has noticed that the purchasing department, a primary stakeholder, is excluded from the list of stakeholders.

In which reference material can the business analyst find information about the missing project stakeholders?

Options:

A.

Organizational chart

B.

Business case

C.

Business analysis plan

D.

Business analyst communication plan

Buy Now
Questions 18

A business analyst is working on a system enhancement project and has completed the requirements according to the requirements management plan. The business analyst is now ready to request approval from the stakeholders.

How should the business analyst obtain approval?

Options:

A.

Conduct a formal or informal review of the requirements.

B.

Create and maintain an audit history log of changes to requirements.

C.

Provide a defect tracking log for review.

D.

Send an email requesting approval of requirements.

Buy Now
Questions 19

A business analyst is discussing the acceptance criteria for a new measurement system with the operations manager. The operations manager is particularly concerned about the accuracy of the new system because mistakes in data measurements could be extremely costly to fix.

Which of the following is the best strategy to define the appropriate acceptance criteria?

Options:

A.

Quantify the risks associated with the measurement errors and update the risk register.

B.

Ask the operations manager to formally accept the requirements documents.

C.

Plan a training session for the new system before it is handed over to the operations manager.

D.

Clearly define the maximum acceptable error rate for the new system.

Buy Now
Questions 20

In the first few weeks after a large implementation of a new web-based application, a critical report failed. Further Investigation determined that a worker had been using a field that was not supposed to be used. This issue was not identified in testing.

Which technique could have prevented this problem from occurring?

Options:

A.

Prototyping

B.

Diagrams

C.

Use cases

D.

Document analysis

Buy Now
Questions 21

A business analyst is conducting a cost-benefit analysis of potential solution options. The stakeholders have indicated that the estimated growth rate is very important to them.

Which technique will allow the business analyst to determine this information?

Options:

A.

Payback period

B.

Net present value (NPV)

C.

Internal rate of return

D.

Return on investment (ROI)

Buy Now
Questions 22

Requirements for a project have already been approved and finalized when a stakeholder approaches the project team with a change to one of their requirements. Which method of document control should the business analyst use to document changes in requirement(s)

versioning?

Options:

A.

Statement of work

B.

Project plan

C.

Problem or opportunity statement

D.

Traceability matrix

Buy Now
Questions 23

A business analyst has captured all of the requirements from the various stakeholders within the organization and has compiled them into a complete list. After reviewing the list of requirements with the stakeholders, it is determined that the list of requirements is too large and will exceed the allotted budget.

Which tool or technique should the business analyst use with the stakeholders to prioritize the requirements to determine which requirements are approved, deferred, or rejected?

Options:

A.

SMART Goals

B.

Moscow Analysis

C.

SWOT Analysis

D.

Timeboxing Analysis

Buy Now
Questions 24

Through user acceptance testing, a software flaw was identified. What should the business analyst do next as part of the root cause analysis in order to analyze and resolve the discrepancy?

Options:

A.

Create a fishbone diagram.

B.

Create an interface analysis.

C.

Create a Delphi estimation.

D.

Create a functional decomposition.

Buy Now
Questions 25

A project team has 120 days to deliver a solution, but the stakeholders have too many requirements for the delivery window. What requirements prioritization technique should be used to determine which requirements will be delivered?

Options:

A.

Multivoting

B.

MoSCoW

C.

Time-boxing

D.

Budget analysis

Buy Now
Questions 26

The document that defines the process for managing requirements revisions is the:

Options:

A.

project management plan.

B.

change management plan.

C.

communications management plan.

D.

scope management plan.

Buy Now
Questions 27

The client produced a specification for a new product to be developed by Company A. Company A designed and successfully tested the new product against the test plan, yet the client does not agree that it meets the specification.

What could have caused this?

Options:

A.

The product was not adequately tested in accordance with the test plan.

B.

The requirements matrix did not adequately track back to client requirements.

C.

Requirement changes were not properly identified in the project charter.

D.

The product design was not properly reviewed by the quality department.

Buy Now
Questions 28

The following requirement was included in a business requirements document: “An API shall be built to send data back and forth from the accounting system to the customer relationship system so that name and address data can be synchronized.” What should be done with this business requirement?

Options:

A.

It should remain because it specifies the reason why the business requirement is needed.

B.

It should be removed because it does not state how often the data should be synchronized.

C.

It should be revised because it states a solution to the problem rather than the business need.

D.

It should remain because it specifies the type of data and the source system.

Buy Now
Questions 29

The business analyst has worked with the stakeholders to capture their views of organizational improvement for the company. It would be best to align these with the:

Options:

A.

work breakdown structure.

B.

vision/scope document.

C.

project charter.

D.

requirements traceability matrix.

Buy Now
Questions 30

A company uses a prioritization range of 1-10, in which 10 represents the highest or best. According to the information from the table, which option should the business analyst recommend?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 31

Last year, a company registered a high number of complaints about its customer service. Which of the following tools or techniques can help to identify the high-priority changes needed to improve that service?

Options:

A.

A work breakdown structure analysis of the service

B.

A Pareto analysis

C.

A flowchart of the service

D.

A cause-and-effect diagram

Buy Now
Questions 32

An insurance company embarks on a project to replace its current enrollment and billing software application, which will no longer be supported by the end of the calendar year. The new enrollment and billing application must be implemented before the current vendor contract ends. The business analyst gathers the initial requirements for the new enrollment and billing application. Based on the large

volume of requirements, the business analyst realizes that the requirements will need to be prioritized.

Which requirements prioritization method should the business analyst use for this project?

Options:

A.

Time-boxing

B.

Weighted ranking

C.

MoSCoW

D.

Risk analysis

Buy Now
Questions 33

How can a business analyst show progressive iterations of product development to stakeholders after the requirements baseline has been approved?

Options:

A.

Create prototype proof-of-concept models.

B.

Conduct requirement walkthrough sessions.

C.

Review performance data with the project sponsor.

D.

Talk to distinct testing groups to check testing status.

Buy Now
Questions 34

The best way to ensure the integrity of requirements is to:

Options:

A.

implement version control, maintain a history of requirements changes, and track the status of each requirement.

B.

use a requirements management tool, measure requirements volatility, and maintain a history of requirements changes.

C.

establish a change control board, track the status of each requirement, and use a requirements management tool.

D.

establish a requirements baseline, establish a change control board, and label each requirement uniquely.

Buy Now
Questions 35

Once the requirements are compared to internal and external quality standards, what should the business analyst do next?

Options:

A.

Set the priority of the requirements.

B.

Communicate the requirements to stakeholders.

C.

Ensure that the requirements are validated.

D.

Baseline the requirements.

Buy Now
Questions 36

A company is pleased with its delivered solution and reports that it has heard only minimal complaints for the first three months of use.

How can the business analyst determine how well the solution meets the business case?

Options:

A.

Conduct a user survey.

B.

Ask the sponsor for feedback.

C.

Survey the project.

D.

Compare the results of day-in-the-life (DITL) testing and integration testing.

Buy Now
Questions 37

What should the business analyst do to ensure that all requirements meet a quality checklist before the development and testing phase?

Options:

A.

Validate the requirements deemed important by the stakeholders.

B.

B. Obtain approval from engineering for partial testing of the requirements.

C.

Negotiate with the client to standardize the requirements.

D.

Assign a verification method to each requirement.

Buy Now
Questions 38

Which of the following is an example of a functional requirement?

Options:

A.

The system is able to require passwords.

B.

The system can be accessed from multiple locations.

C.

The system provides an user-friendly interface.

D.

The system can handle 3,000 user requests concurrently.

Buy Now
Questions 39

Which tool can be used to analyze how the system responds to various combinations of input conditions with the probability of each outcome?

Options:

A.

Decision tree

B.

Functional decomposition

C.

Expected monetary value

D.

Weighted criteria

Buy Now
Questions 40

A new project is in the planning phase. The business owner believes that, since the timeline is aggressive, requirements elicitation should begin as soon as possible.

Which activity should the business analyst initiate before beginning requirements elicitation?

Options:

A.

Prepare the requirements traceability matrix.

B.

Define how the solution will be evaluated.

C.

Draft a high-level data model.

D.

Document how the relevant systems interact.

Buy Now
Questions 41

A business analyst is preparing a requirements management plan and needs to define a method to deal with a complex project with stakeholders who find it difficult to articulate their needs. Which method would best minimize requirements risk?

Options:

A.

Questionnaires

B.

Group decision making

C.

Stakeholder analysis

D.

Prototyping

Buy Now
Questions 42

A business analyst is trying to determine which analysis technique will be best suited to elicit information from a large number of users in a short period of time. Which elicitation technique is best suited for this purpose?

Options:

A.

Ongoing observation

B.

Facilitated workshop

C.

Questionnaire

D.

Group brainstorming

Buy Now
Questions 43

A key component of the business analyst's role during acceptance testing is to:

Options:

A.

execute all acceptance tests on behalf of the user community.

B.

delegate execution of acceptance testing and defect identification to users.

C.

act as a resource only when users encounter difficulties while performing tests.

D.

assist the quality assurance department by defining acceptance criteria.

Buy Now
Questions 44

The project team has all the document control process and versioning in place to capture the requirements changes. The team ensures that the change is documented in the scope document, resulting in the changed work breakdown schedule (WBS) and schedule. However, a key requirement was not implemented in the release.

Which is a possible reason why the requirement was not implemented?

Options:

A.

The requirements management plan was not updated with the change.

B.

The scope management plan was not updated with the change.

C.

The requirements traceability matrix was not updated with the change.

D.

The schedule management plan was not updated with the change.

Buy Now
Questions 45

To reduce the amount of time and effort needed to create a product specification for a project, the business analyst plans to reuse:

Options:

A.

quantitative analysis.

B.

risk assessments.

C.

qualitative analysis.

D.

requirements.

Buy Now
Questions 46

In the middle of a project, a new requirement was added to the scope. The business analyst must determine if any impacts, dependencies, or risks are associated with the addition to the scope.

What task should the business analyst perform in order to identify these impacts?

Options:

A.

Manage solution scope.

B.

Manage requirements traceability.

C.

Manage requirements prioritization.

D.

Manage assumptions and constraints.

Buy Now
Questions 47

A project team has been assembled to streamline accounts payable processes in all divisions of the company. As part of the planning activities, the business analyst is working to identify stakeholders.

Which of the following techniques would the business analyst use to identify stakeholders?

Options:

A.

Brainstorming

B.

State diagram

C.

Estimation

D.

Prototyping

Buy Now
Questions 48

An organization is evaluating the possibility of conducting business internationally. Which factors should be investigated at the onset of the initiative?

Options:

A.

Deliverables to be produced

B.

Impacts on requirements baseline

C.

External dependencies

D.

Change control processes

Buy Now
Questions 49

The business analyst wishes to clarify the project's key business drivers and ensure that requirements can be prioritized to provide maximum business value. Which question should the business analyst ask of stakeholders to help obtain this clarification?

Options:

A.

Which stakeholders have the most influence?

B.

Which functional areas are impacted?

C.

How is the organizational chart structured?

D.

What is the business need?

Buy Now
Questions 50

A business analyst has started a project for a system enhancement. In order to determine how the requirements will be approved, the business analyst schedules a meeting with the stakeholders to discuss the proposed approval process.

Which measure of effective decision making allows the business analyst to finalize the process for requirement approval?

Options:

A.

The requirements verification process is documented.

B.

The requirements elicitation process is documented.

C.

The requirements validation process is documented.

D.

The requirements approval process is documented.

Buy Now
Questions 51

A business analyst is ready to begin requirements elicitation; however, stakeholders are not available to participate for another two weeks. Which elicitation technique should the business analyst use during this time?

Options:

A.

Cost-benefit analysis

B.

Benchmarking

C.

Brainstorming

D.

Document analysis

Buy Now
Questions 52

A business analyst captures an application's current limitations and consults with end users to identify new features for the next version.

What can be used to analyze this information and determine project scope?

Options:

A.

Capability table

B.

As-is process

C.

Requirements traceability matrix

D.

Root cause analysis

Buy Now
Questions 53

After several meetings with different groups of users, a business analyst has gathered the requirements for a large IT project. Now, the business analyst needs to document those requirements in a way that is clearly understood by the development team and provides

enough information to check if the requirement has been met.

Which of the following would work best in this case?

Options:

A.

User stories

B.

Functional specifications

C.

Flow chart

D.

Prototyping

Buy Now
Questions 54

A company has developed a new product for a customer. The customer provided a specification, but the company did not produce the system requirements in the verification matrix.

The customer is having difficulty determining if the product is meeting the requirements during the test event because the:

Options:

A.

customer did not adequately review the test procedure before the test.

B.

test engineer is not communicating effectively with the customer.

C.

requirements in the technical specification are unclear and ambiguous.

D.

customer cannot make this determination until the entire test is complete.

Buy Now
Questions 55

The project team is working on test scripts to test a solution. Which source can be used for building tests of end-to-end business processes across business functions and systems?

Options:

A.

Prototype model

B.

Feature model

C.

Context diagram

D.

Use case

Buy Now
Questions 56

Which of the following techniques is used to identify ambiguous or unverifiable requirements?

Options:

A.

Fishbone analysis

B.

Resource checklist

C.

Traceability matrix

D.

Team peer review

Buy Now
Questions 57

A business analyst is developing a traceability matrix to determine whether or not any gaps exist and to identify any discrepancies.

Which critical field is needed to ensure that the traceability matrix is usable?

Options:

A.

Status

B.

Hierarchy

C.

Owner

D.

Requirements description

Buy Now
Questions 58

A business analyst and stakeholders have completed documentation of the acceptance criteria for the requirements of a new vehicle leasing database. A concern is raised that some of the key performance indicators may not validate the desired benefits of the implementation.

What should the business analyst do to ensure that the business need can be validated?

Options:

A.

Document an assumption.

B.

Document a constraint.

C.

Document a defect.

D.

Document a business rule.

Buy Now
Questions 59

The software developers have delivered a completed solution. The quality assurance team has passed the solution. What should the business analyst do next?

Options:

A.

Evaluate the solution against the project charter.

B.

Conduct user acceptance testing.

C.

Evaluate the solution with the sponsor(s).

D.

Conduct performance testing.

Buy Now
Exam Code: PMI-PBA
Exam Name: PMI Professional in Business Analysis
Last Update: Apr 26, 2024
Questions: 199
$99.6  $249
$90  $225
$79.6  $199
buy now PMI-PBA