Weekend Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

SAFe-SPC Sample Questions Answers

Questions 4

When is the best time to release a product or Solution to the marketplace?

Options:

A.

At the end of the IP Iteration.

B.

At each PI boundary, provided there are no PI defects.

C.

Whenever it meets relevant governance and market criteria.

D.

At quarterly boundaries.

Buy Now
Questions 5

You are at a retrospective meeting where a program is trying to address a long-existing problem: unreliable PI commitments. One of the participants suggests that they are working on too many things at a time.

What aspect of the program cause uncontrollable amounts of work in process?

Options:

A.

Teams don't do a good job of task-switching.

B.

All program teams are cross-functional, and therefore every team spawns work in multiple areas at the same time.

C.

Backlog items in the Program Backlog are not truly end-to-end Features; they look more like large chunks of work at different layers of the system

Buy Now
Questions 6

What does Little's Law tells us?

Options:

A.

The easiest way achieve flow is to reduce queue lengths.

B.

Long queues help increase process efficiency.

C.

The easiest way to reduce waits is to increase the processing rate.

D.

The average wait time is dependent on the varying arrival rate of items coming into the queue.

E.

Single-piece flow is always best.

Buy Now
Questions 7

What does innovation accounting mean?

Options:

A.

Capitalizing the cost of software development using Story points.

B.

Defining, empirically measuring, and communicating the true progress of innovation.

C.

Demoing Stories that come out of the IP Iteration.

D.

Being sure to account for the investment in new product initiatives on a P&L.

Buy Now
Questions 8

What is the most effective way to train the System Team members to operate effectively as part of the train?

Options:

A.

Have them attend Leading SAFe training and Scrum Master orientation.

B.

Have them attend Leading SAFe training.

C.

Have them attend SAFe for Teams training with all other teams on the train.

D.

Have them attend Implementing SAFe training with SPC certification.

E.

Have them review the SAFe Foundations presentation and provide on-the-job training.

Buy Now
Questions 9

ARTs that consist only of Feature teams do not require an Architectural Runway.

Options:

A.

True

B.

False

Buy Now
Questions 10

(Select 2) What are the 2 biggest reasons to reduce batch size?

Options:

A.

Make it easier to assess the state of smaller batches.

B.

Decrease stress on the system.

C.

Increase throughput.

D.

Produce less measurement overhead.

E.

Increase delivery reliability.

Buy Now
Questions 11

(select 2) What are the benefits of cadence and synchronization?

Options:

A.

Synchronization enables multiple perspectives to be understood, resolved, and integrated at the same time.

B.

They enable systems builders to operate reliably and with certainty within a safety buffer.

C.

Synchronization enables reduction in WIP.

D.

Cadence limits variance.

E.

Cadence enables variability and makes wait times predictable.

Buy Now
Questions 12

What is true about Epic implementation?

Options:

A.

Once pulled into implementation, the Epic needs to be finished.

B.

A budget reserve is established that can be used to fund Epics.

C.

Agile Release Trains are empowered to decide whether or not they proceed with a Portfolio Epic.

D.

Re-prioritization happens at every PI boundary, and the rest of the Epic can be postponed or canceled if there are more important new initiatives.

Buy Now
Questions 13

What role would a traditional program manager most likely take on in SAFe?

Options:

A.

Release Train Engineer or Value Stream Engineer.

B.

Scrum master

C.

Business Owner

D.

Product Manager

Buy Now
Questions 14

What is the target percentage for the Program Predictability Measure?

Options:

A.

<50%

B.

50-75%

C.

80-100%

D.

100%

E.

None of the above.

Buy Now
Questions 15

Test automation is typically included in the Definition of Done (DoD).

Options:

A.

True

B.

False

Buy Now
Questions 16

(Select 2) The SAFe Economic Framework guides Value Stream investment decisions by: __________.

Options:

A.

Prioritizing work by ROI.

B.

Requiring lightweight business cases for Epics.

C.

Empowering the Product Owners to sequence the Value Stream Backlog.

D.

Finding Value Streams.

Buy Now
Questions 17

(Select 2) What are the right scenarios for using SAFe Foundations Training Materials?

Options:

A.

Train Scrum Masters in servant leadership following "SAFe for Teams" training.

B.

Make an initial presentation on SAFe to the organization.

C.

Familiarize Release Train Engineers with the PI Planning process.

D.

Familiarize executives with SAFe.

E.

Train the teams prior to PI Planning.

Buy Now
Questions 18

What concept is NOT on of the Core Value of SAFe?

Options:

A.

Predictability

B.

Alignment

C.

Transparency

D.

Built-in Quality

E.

Program execution

Buy Now
Questions 19

Select 3) Which behaviors are typically associated with Lean-Agile Leaders?

Options:

A.

Establish clear objectives for managing.

B.

Develop Solutions.

C.

Protect subordinates from interference by outside stakeholders.

D.

Support decentralized decision-making.

E.

Emphasize lifelong learning.

Buy Now
Questions 20

What would imply a change to the ART Budget?

Options:

A.

Extending the duration of a PI.

B.

Changing total ART resources

C.

Switching to a different PI cadence.

D.

Reducing the scope of a Program Epic.

E.

Prioritizing Features based on Cost of Delay.

Buy Now
Questions 21

Velocity is a good measure of team performance.

Options:

A.

True

B.

False

Buy Now
Questions 22

What is the correct statement about Work in Process (WIP).

Options:

A.

The bigger the WIP, the richer the feedback.

B.

The amount of WIP is unrelated to utilization.

C.

Lower WIP limits foster collaboration.

Buy Now
Questions 23

You organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options." What is the optimum path for success?

Options:

A.

Assume variability of scope and preserve options for the release date.

B.

Preserve flexibility in system functionality and design, but have fixed Solution intent.

C.

Assume variability of scope, but have fixed Solution Context.

D.

Preserve flexibility in both system functionality and design.

Buy Now
Questions 24

What is the ideal size of an ART?

Options:

A.

25 practitioners.

B.

25-50 practitioners.

C.

50-125 practitioners.

D.

126-200 practitioners.

E.

Whatever the Value Stream requires.

Buy Now
Questions 25

(Select 3) What are three ways to coordinate across Value Streams?

Options:

A.

Move teams across Value Streams to respond to changing business demands.

B.

Establish Enterprise architecture.

C.

Empower the Value Stream Engineer to coordinate all teams in the Value Stream.

D.

Apply cadence and synchronization.

E.

Fund the Portfolio, not the Value Streams.

F.

Create a Portfolio Vision and Roadmap.

Buy Now
Questions 26

(Select 3) You are invited to help a program where, even though not mandated by the external environment, management requires teams to make big, up-front, and detailed scope commitments for every release.

What would you do to best coach the decision-makers?

Options:

A.

Illustrate the power of feedback in content decision-making.

B.

Emphasize the value of "Responding to change" from the Agile Manifesto.

C.

Explain that too much up-front detail demotivates Product Owners as they have almost nothing to do thereafter.

D.

Explain the "understand and exploit variability" principle or product development flow.

E.

Explain why development doesn't need to commit to anything in Agile.

Buy Now
Questions 27

What are the primary responsibilities of Program Portfolio Management (PPM)?

Options:

A.

Governance, strategy and investment funding, program management.

B.

Program management, stakeholder management, PI Planning.

C.

Lightweight business case, Epic specification workshop, Budget allocation.

D.

Governance, investment funding, product strategy.

Buy Now
Questions 28

(Select 4) What are legitimate examples of management as an enabling function, rather than as top-down control?

Options:

A.

Assigning backlog items to team members.

B.

Communicating the Solution Vision with the teams.

C.

Working with other departments to establish better communication among teams.

D.

Creating work breakdown structures.

E.

Assigning team members to handle external dependencies.

F.

Developing skills and career paths for team members.

G.

Creating an environment of mutual influence.

Buy Now
Questions 29

(Select 3) Which of the following have acceptance criteria?

Options:

A.

Business Capabilities

B.

Portfolio Enabler Epics

C.

Strategic Themes

D.

Enabler Features

E.

Spikes

F.

Program Epics

Buy Now
Questions 30

The Spanning Palette can apply to the Team Level.

Options:

A.

True

B.

False

Buy Now
Questions 31

(Select 2) What applies to the Portfolio Backlog?

Options:

A.

The Portfolio Kanban holds Capabilities that are ready for implementation.

B.

Programs plan PIs so that they exhaust the Portfolio Backlog and only then work on their local priorities.

C.

It provides a low-cost holding area for approved Business and Enabler Epics.

D.

WSJF is used to prioritize Epics in the Portfolio Backlog.

Buy Now
Questions 32

What is NOT a SAFe-recommended practice for DevOps?

Options:

A.

Maintain development and test environments to better match production.

B.

Deploy to staging every sprint.

C.

Put everything under version control.

D.

Start automating the actual deployment process.

E.

Build and maintain a production-equivalent staging environment.

F.

Continuously synchronize all Feature and team branches.

G.

Create the ability to automatically build environments.

Buy Now
Questions 33

What is the primary role of a Scrum Master?

Options:

A.

To write all the user stories so that the team can focus on coding and testing.

B.

To task team members in the efficient manner possible based on their skills.

C.

To provide management with status reports on the team's progress.

D.

To use servant leadership to help the team perform at its best.

Buy Now
Questions 34

What is NOT the responsibility of the Enterprise Architect?

Options:

A.

Synchronize the technology stack and infrastructure across Value Streams.

B.

Drive the strategy for maintaining the Enterprise's architecture.

C.

Define the Solution design for Agile Release Trains.

D.

Facilitate reuse of ideas and proven design patterns.

Buy Now
Questions 35

(Select 3) According to Lean thinking, how is fast and sustainable flow achieved?

Options:

A.

By understanding the full Value Stream.

B.

By constant reduction of delays.

C.

By reducing batch sizes.

D.

By applying subjective governance.

Buy Now
Exam Code: SAFe-SPC
Exam Name: SAFe Practice Consultant SPC (6.0)
Last Update: May 6, 2024
Questions: 119
$64  $159.99
$48  $119.99
$40  $99.99
buy now SAFe-SPC