Questions 4

Which of the following is the representation of a related set of concerns?

Options:

A.

Architecture view

B.

Architecture viewpoint

C.

Diagram

D.

Matrix

E.

Catalog

Buy Now
Questions 5

Which of the following describes an objective of the Preliminary Phase?

Options:

A.

Ensure conformance requirements for the target architecture are defined

B.

Develop the Implementation and Migration Plan

C.

Operate the governance framework

D.

Establish the architecture governance processes

E.

Develop the Architecture Vision document

Questions 6

Complete the sentence.

A good set of architecture principles that cover every situation perceived throughput the enterprise meet the recommended criteria of____

Options:

A.

understandability

B.

consistency

C.

stability

D.

completeness

E.

robustness

Buy Now
Questions 7

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect for a firm that is a major OEM parts supplier to the auto

industry. Europe has been the primary market for its products, with just 20% of its output being

exported to North America. The firm is planning to expand its exports to North America and to

establish sales in other regions.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It

has made significant progress in consolidating the technology portfolio and establishing key

standards. The Chief Information Officer (CIO) and the Chief Operating Officer (COO) are joint

sponsors of the EA program. The EA program is mature, with an active Architecture Board and a

well-defined architecture process and standard content templates based on the TOGAF

Architecture Content Framework. The EA program is well coordinated with the Project Management

Office, Systems Development, and Operations functions.

The firm is organized into business units with each addressing different auto industry sectors. Each

business unit has acquired other producers to expand its manufacturing capacity. This has resulted

in a complex environment with a high diversity of business and manufacturing systems.

The firm has completed a strategic plan to reorganize its Sales and Marketing organization

according to the target geographic markets. One of the goals of this reorganization is to improve

the ability of Marketing to collect more meaningful market analytics that will enable each sector to

better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As

the architecture team commences its work, the CIO has expressed concerns about whether the

firm will be able to adapt to the proposed change and how to manage the associated risks.

Refer to the Scenario

You have been asked how to address the concerns of the CIO.

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

Options:

A.

The EA team should conduct a Business Scenario to describe the business problem,

identify the stakeholders' concerns and the resulting requirements. Once the requirements

have been identified, they can be assessed in terms of their risks. The risks should be

evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that

cannot be resolved should be identified as residual risks and their di

B.

The EA team should create a set of Business Architecture views that will enable them to

identify the factors that will influence the reorganization. There should then be an

assessment of each factor on a maturity scale that will allow the team to gauge the urgency,

readiness, and degree of difficulty to fix. These factors can then be used to assess the initial

risks associated with the proposed project.

C.

The EA team should analyze risk by completing an Implementation Factor Assessment and

Deduction Matrix. This is used to serve as an archive and record of key decisions made in

the implementation and deployment. The matrix should include a list of factors to be

considered, their descriptions, and constraints that should be taken into account. These

factors can then used to assess the initial risks associated with the

D.

The EA team should evaluate the organization's readiness to undergo change. This will

identify the factors that will influence the reorganization. This should include determining the

readiness rating for each factor based on a maturity scale that will allow the team to gauge

the urgency, readiness, and degree of difficulty to fix. These factors can then used to assess

the initial risks associated with the proposed pr

Buy Now
Questions 8

Scenario:

Please read this scenario prior to answering the Question

You have been assigned the role of Lead Enterprise Architect for a firm that is a major OEM parts supplier to the auto industry. Europe has been the primary market for its products, with just 20% of its output being exported to North America. The firm is planning to expand its exports to North America and also to establish sales in South America and the Asia Pacific region. This will enable them to better ride out recessions in key markets such as Europe. It will also enable the firm to exploit the auto industry move to global platforms.

The firm is organized into business units with each addressing different auto industry sectors. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are joint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templated based on the TOGAF Architecture Content Framework. The EA program is well coordinated with the Project Management Office. Systems Development and Operations functions.

The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed change and how to manage the associated risks.

Refer to the Scenario.

You have been asked how to address the concerns of the CIO.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the reorganization. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed project.

B.

In Phase A, the team should conduct a Business Scenario to describe the business problem, identify the stakeholders’ concerns and the resulting requirements. Once the requirements have been identified, they can be assessed in terms of their risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that cannot be resolved should be identified as residual risks and their disposition shoul

C.

In Phase A, the team should evaluate the organization’s readiness to undergo change. This will identify the factors that will influence the reorganization. This should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed project.

D.

In Phase A, the team should analyze their risk by completing an implementation Factor Assessment and Deduction Matrix to identify the risks associated with the implementation and deployment. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into account. These factors can then be used to assess the initial risks associated with the proposed project.

Buy Now
Questions 9

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect for a life insurance, annuities, and

pensions company, which has been formed through the merger of three companies.

The company consists of three divisions with the same names and division

headquarters as their predecessors.

The lack of integration between the three divisions has increasingly caused problems

in the handling of customer and financial information. At present, each division

maintains its own applications. Despite an earlier initiative to install a common

application to manage customer, products, and claims information, each division has

different ways of defining its data elements and has customized the common

application to the point where the ability to exchange information is error-prone.

The Chief Information Officer (CIO) has formed an Enterprise Architecture

department, and one of the primary goals in its charter is to coordinate efforts

between the teams in each division. The CIO has also formed a cross-functional

Architecture Board to oversee and perform governance. The TOGAF standard is used

as the basis for the core framework of the Enterprise Architecture program. The

company has an existing team of security architects.

The company has made the decision to introduce a common web portal, contact

center software suite, and document management system. Also the company has

selected a single enterprise-wide customer relationship management (CRM)

application to consolidate information from several applications that exist across the

divisions. The application will be used by each of the divisions and accessed by third

party partners through well-defined interfaces.

The CIO is concerned that the new application must be able to manage and

safeguard customer information in a secure manner that meets or exceeds the legal

requirements of the countries in which the company operates. This will be an

increasingly important capability as the company expands its online services in

cooperation with its external partners.

Refer to the Scenario

As part of the process for initiating the Enterprise Architecture project to rollout the

new application, you are developing a set of architecture principles.

You need to recommend the best approach for this work.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would define a set of principles that support the preferred best practices

embodied in the Enterprise Architecture department charter. You would publish

the principles on the corporate intranet to ensure widespread acceptance and

compliance within the company. You would then schedule regular periodic

Compliance Assessments with each of the divisions to check that they have

made satisfactory progress toward

B.

You would analyze the mission statements for the company and each of its

divisions, together with the corporate business goals. Based on that analysis,

you would define a set of architecture principles and review them with the CIO.

When developing the principles, you would ensure that they actively promote

the alignment of IT with the business strategies and initiatives of the company.

You would then seek the e

C.

You would review the mission statements for the company and its divisions,

together with the corporate business goals and business drivers. Based on that

review, you would work closely with the key stakeholders and the Architecture

Board to define the architecture principles. You would ensure that they actively

promote the alignment of IT with the corporate business strategies. You would

then hold review meetin

D.

You would gather information from credible industry sources in the insurance

business. Based on that information, you would assess current trends and

apply them to defining a set of principles that embody industry best practices.

You would select architecture principles that do not conflict with each other,

that are consistent, and those that are stable. You would ensure that all the

principles are realistic an

Buy Now
Questions 10

Scenario

Please read this scenario prior to answering the Question

You have been assigned the role of Chief Enterprise Architect within a leading outsourcing services company. The company has over 20,000 outsourcing professionals and works on some of the world's largest outsourcing projects. Outsourcing services include business processes, infrastructure, and service management. The company also provides business consulting services.

With numerous service areas and a large number of diverse engagements in progress at any given time, overall engagement management within the company has become challenging. The company does not want to risk Its outstanding reputation or its international certifications and CMM ratings.

The company has an established an Enterprise Architecture program based on TOGAF 9, sponsored jointly by the Chief Executive Officer and Chief Information Officer. An Architecture Board has been formed comprised of IT staff executives and executives from the major service areas and consulting practice.

The Enterprise Architecture (EA) team has been working with the Strategic Planning team to create a strategic enterprise architecture to address these issues. The EA team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This includes a solution architecture including three distinct transformations.

The CIO has made it clear that prior to the approval of the detailed Implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the vice presidents across the company that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.

Refer to the Scenario

You have been asked to recommend an approach to satisfy these concerns.

Based on TOGAF, which of the following is the best answer?

Options:

A.

The EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. A value realization process should then be established to ensure that the concerns raised are addressed.

B.

Before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should then assess the readiness of the organization to undergo change. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determ

C.

The EA team should apply an interoperability analysis to evaluate any potential issues across the Solution Architecture. This should include the development of a matrix showing the interoperability requirements. Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.

D.

The EA team should apply the Business Transformation Readiness Assessment technique. This will allow the risks associated with the transformations to be identified and mitigated for. It will also identify improvement actions to be worked into the Implementation and Migration Plan. The Business Value Assessment technique should then be used to determine the business value and associated risks for the transformation.

Buy Now
Questions 11

Which of the following best describes the TOGAF Architecture Development Method?

Options:

A.

A method for controlling change at an enterprise-wide level

B.

A method for developing an organization-specific architecture

C.

A method for managing architecture requirements

D.

A method for classifying architectures and solutions

E.

A method for creating an Architecture Repository

Buy Now
Questions 12

Scenario:

Please read this scenario prior to answering the Question

You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.

The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.

"Just In Time" manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.

As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity. The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.

The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.

Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.

Refer to the Scenario

You have been asked to recommend a response to the Chief Architect's request to tailor the TOGAF Content Metamodel.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamodel. As the environment is process-centric this will enable them to model the manufacturing processes and store information to support regulatory compliance. It also includes views useful for managing the consolidation of applications into a single data center.

B.

You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamodel. This is suitable as this is a significant IT change that will impact its operational models. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.

C.

You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamodel. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data center. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.

D.

You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamodel. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing process. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Buy Now
Questions 13

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for the enterprise architecture team at a multinational company. The company has grown rapidly by acquisition and has inherited numerous supply chain processes and related IT systems. Several supply chain processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant processes and systems. The company will move to a "Just-in-time" supply chain management system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM).

At present, there are no particularly useful architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created.The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing supply chain management processes or systems.

The architecture development project has completed Phase A and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business, Application and Data Architectures. Key stakeholder concerns that should be addressed by these architectures include:

1. What groups of people should be involved in supply chain management-related business processes?

2. What non-supply chain management applications will need to be integrated with the new supply chain management applications?

3. What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to Chapter 35 of the reference text in order to answer this question.] You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on TOGAF, which of the following is the best answer?

Options:

A.

In the next iteration of Architecture development, you would describe the Baseline Business Architecture with a Value Chain diagram and a Baseline Business Process catalog. You would describe the Baseline Data Architecture with a Data diagram. You would describe the Baseline Application Architecture with an Environment and Location diagram.

B.

In the next iteration of Architecture development, you would describe the Target Business Architecture with an Organization/Actor catalog, a Business Service/Function catalog and Data Lifecycle diagrams. You would describe the Target Application Architecture with an Application Interaction matrix and Application Communications diagrams.

C.

You would describe the Baseline Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog and a Data Entity/Business Function matrix. You would describe the Baseline Data Architecture using a Data Entity/Data Component catalog. You would describe the Baseline Application Architecture with an Application/Function matrix.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, and a Business Interaction matrix. You would describe the Target Data Architecture with a Data Entity/Business Function matrix and an Application/Data matrix. You would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix.

Buy Now
Questions 14

Scenario:

Please read this scenario prior to answering the Question.

The ABC company is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer. Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average.

The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to AirLight, a competitor, because of superior customer service. The company actually has better coverage in nearly all markets than AirLight, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low. The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan.

They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board. The planning for the program has been underway for several months. The company has selected TOGAF 9 as the basis for its Enterprise Architecture. The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation.

The Executive Council has stated that the program should define specific initiatives to enable each regional business unit to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.

Refer to the Scenario

You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.

The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At the present time, the project team is conducting an architecture development project that is focused on the customer self-service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.

The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.

You have been asked to recommend the course of action to complete the project.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository.The completed Architecture Definition Document and the Implementation and Migration Plan will be

B.

In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture.The resulting Solution Building Blocks will then provide the basis for the capability incre

C.

In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Ftiases E and F, the capability should be broken down into a set of increments that define the Target Architecture. The resulting Solution Building Blocks will provide the basis for the capability increment solutions. The completed Architecture Definition Document and the Implem

D.

The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture.The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Up

Buy Now
Questions 15

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect In a company that develops wind turbines for use in wind farms. The company has multiple manufactunng facilities, in North America, Asia, and Europe. Each of these facilities supplies the power industry In Its region. Most of the facilities are wholly owned by the company, but those In Asia are jointly owned with local partners.

The company has a mature Enterprise Architecture practice supported by a cross-functional Architecture Board and uses the TOGAF standard.

The company recognizes that the long-term technical potential of wind energy can address the current global dependency on carbon fuels. In order to do so this will require wind turbines to be installed over large areas and in areas of higher wind resources. In particular offshore wind farms can contribute substantially more energy than land stationed turbines.

The research arm of the company has pioneered the development of an offshore wind turbine design, with an improved turbine blade and power system, that will produce up to 20% more energy. This new design is ready to go Into production.

As part of putting the new design into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated systems used to perform final assembly and quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.

Architecture Contracts have been developed that detail the wortc needed to implement and deploy the new automated system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and a low blade failure rate.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief Engineer's concern.

Based on the TOGAF Standard, Version 9.2. which of the following is the best answer?

Options:

A.

You would review the Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. Where applicable, you ensure that the contract is legally enforceable. You would schedule compliance reviews at key points in the assembly and quality assurance process to ensure that the work is proceeding in accordance with the Architecture Definition. All deviati

B.

You would create an Architecture Contract to manage and govern the implementation and migration process at each location. For wholly owned facilities, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For facilities jointly owned by local partners, you would ensure that the contract is legally enforceable. You would then ensure that the Architecture Board reviews all deviations from

C.

You would create an Architecture Contract to govern the update to the automated system controller at each location. For facilities managed by partners, you ensure that it is a fully enforceable legal contract, and you would schedule additional compliance reviews at key points in the assembly and quality assurance process. These additional reviews would be for an initial period until no deviations from the contract occur. You recommend that

D.

You would use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You would ensure that the quality of each completed turbine blade at each location is assessed, and any local change requirements identified, if necessary. You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organ

Buy Now
Questions 16

You are working as an Enterprise Architect at a technology company. The company has multiple subsidiary companies, engaged in mobile, online shopping, cloud computing services, and a social media platform. The company has grown rapidly and claims to be adding 20 million new users a month.

The company has an established Enterprise Architecture (EA) program based on the TOGAF standard, sponsored jointly by the Chief Executive Officer (CEO) and Chief Information Officer (CIO). In your role as an Enterprise Architect within the EA team, you work closely with the business stakeholders in the company as well as the sponsors.

The senior leadership within the company is worried about the ability of the company to address the challenges of climate change and the opportunities around artificial intelligence. They are concerned that the business will not be sustainable without making significant changes. Most senior leaders feel that the operations must become more efficient, and the organization needs to change in order to achieve its future goals.

The CEO has decided that reorganizing its subsidiaries around artificial intelligence and machine learning will improve the way the company creates and delivers value. The sponsors have approved an EA project for the reorganization. The EA team has created a strategic architecture with the CEO and CIO. It includes an Architecture Vision and high-level definitions of the domain architectures. This sets out an ambitious plan over a three-year period and covers three distinct transformations to implement the reorganization.

The sponsors have read reports that up to 70% of companies are failing at digital and artificial intelligence transformation. They have made it clear that prior to the approval of the detailed Implementation and Migration Plan, the EA team needs to assess and mitigate the risks associated with the reorganization. They want assurance that the reorganization will succeed and deliver the promised increases in value for the business.

You have been asked by the EA team leader to recommend the approach to address the request from the sponsors.

Options:

A.

You would assess the organization’s preparedness to undergo change. This will allow the risks associated with the transformations to be identified, classified, and mitigated. This would include identifying dependencies between the set of changes, including gaps and work packages. It will also identify improvement actions to be worked into the Implementation and Migration Plan. The business value, effort, and risk associated with each transf

B.

Before preparing the detailed Implementation and Migration Plan, you would review and consolidate the gap analysis results from Phases B to D. This will identify the transformations required to achieve the proposed Target Architecture. You would then assess the readiness of the organization to undergo change and determine an overall direction to address and mitigate risks identified. The Transition Architecture should then be planned to use

C.

You would bring together information about potential approaches and produce several alternative target transition architectures. You would then investigate the different architecture alternatives and discuss these with stakeholders using the Architecture Alternatives and Trade-offs technique. Once the target architecture has been selected, it should be analyzed using a state evolution table to determine the Transition Architectures. A value

D.

You would apply an interoperability analysis to evaluate the potential issues across the proposed new architecture. This should include the development of a matrix showing the interoperability requirements. The degree of interoperability should then be aligned with the corporate operating model to ensure risks are mitigated and minimized. The risk mitigations can then be included within each of the target Transition Architectures. You would

Buy Now
Questions 17

What does the TOGAF standard provide to guide architectural activity within the enterprise in terms of structures, roles, responsibilities, and processes?

Options:

A.

Architecture Development Method

B.

Architecture Capability Framework

C.

Architecture Content Framework

D.

Enterprise Continuum

Buy Now
Questions 18

Scenario

Please read this scenario prior to answering the Question

You are working as a consultant to the Chief Architect at a government agency responsible for securing all government communications and information systems. The agency has recently received funding for a program that will upgrade the reliability and performance of its secure communication systems which provide real-time, highly secure communication of voice, video, and message data to remote locations around the world.

The agency has an established enterprise architecture (EA) capability based on TOGAF 9. The Executive Director of the agency is the sponsor of the EA capability.

Since reliable, high-performance, and secure communications are essential to preserving national security, the Executive Director has placed more stringent requirements for the architecture for the upgraded system. It must be able to provide assurance and verification of specific performance measures on the key services that are most crucial for system operation. Focusing on these service-level details and specific measurements will allow more stringent requirements to be enforced in service contracts. It will also provide a high degree of assurance that necessary performance is being delivered and that notifications will occur if any critical service fails to perform as required.

A portion of the program budget has been allocated to context a review of the EA. The scope of the review is to evaluate the processes, content and governance of the EA capability to ensure that the higher target performance and service levels required by the upgraded system can be achieved.

The Chief Architecture has noted that the core EA artifacts that have been used since TOGAF 9 was introduced are not adequate to describe these new capabilities. The artifacts do not have explicit provisions for defining the in-depth measurement requirements regarding specific services required for the system. She has learned that certain services within the current system have service measurement implementations that match some of the new requirements, but they are only used in a few areas.

Recent EA efforts at another national agency have produced generalized high-performance communication system models to realize similar requirements in a critical defense system involving secure communications. It is possible that these models may be useful for the upgrade program.

Refer to the Scenario

You have been asked to make recommendations for tailoring the Architecture Content Metamodel to accommodate the requirements of the upgraded system.

Based on TOGAF, which of the following is the best answer?

Options:

A.

Since some artifacts will now require specific measurements and additional data will be needed to support the performance objectives linked to these measurements, you recommend that the motivation and governance extensions of the TOGAF 9 Content Metamodel are used. Using these extensions will allow modeling the goals, objectives and drivers for the architecture, linking them to service levels and more detailed governance models. This will a

B.

You recommend all of the TOGAF 9 Content Metamodel extensions be incorporated into the Architecture Content Metamodel. The full Content Metamodel will enable the EA team to capture and categorize all the important additional data needs to support the performance and measurement objectives linked to these artifacts. Once the new repository content has been implemented, on- demand queries can be used to generate a customized governance stakeh

C.

Since this case requires extensions of the modeling and data details of the service, this is best done by using the services extension of the TOGAF 9 Content Metamodel. By using this extension, the service model is no longer constrained by what is expected in typical business service definitions, allowing more flexibility for adding customized models to support the more stringent measurement requirements. The services extension can also be

D.

To support the type of stringent performance measurements needed for the more detailed governance views required for the upgraded system, the interfaces to the communication and network layer of the architecture must be highly visible at the application level. To accommodate the proper development of this, a Communications Engineering view should be created from the infrastructure extension models of the TOGAF Content Metamodel. This view w

Buy Now
Questions 19

Scenario:

Please read this scenario prior to answering the question

Your role is that of Lead Enterprise Architect working at the headquarters of a fast food chain. The chain manages over 7500 restaurants across 33 countries. Each restaurant in the chain is an independently owned and operated franchise.

Many of the restaurants still use the first generation IT systems deployed over 10 years ago. The Chief Operating Officer (COO) of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business including providing its franchisees new support services to help them address the increasing competition from coffee shops. This is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

The changes will help provide the chain with improved products, including healthier alternatives in the menu, and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the COO’s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendation from the initial study, the decision has been taken for the chain to adopt a packaged suite of integrated application that is tailored to the needs of the franchise.

Refer to the scenario.

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the COO’s vision.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You propose that the target architecture is defined first by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

You propose that the baseline Technology Architecture is defined first in order to assess current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

C.

You propose that the target architecture is defined first followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

D.

You propose that the focus be placed on architecture definition, with emphasis on understanding the strategic change parameters. The requirements, drivers, issues and constraints for this engagement can then be identified. You would ensure that the target architecture addresses not functional requirements so as to ensure the target architecture is robust and secure.

Buy Now
Questions 20

Scenario

Please read this scenario prior to answering the question

Your role is that of the Lead Architect working for a government agency responsible for immigration, customs, and border control. The agency was formed by consolidating several smaller government agencies. The agency has established an Enterprise Architecture practice based on TOGAF 9. The CIO is the executive sponsor and has appointed an EA steering team to oversee the practice.

There has been a considerable increase in security requirements and immigration service requests in recent years, which have expanded the scope and size of the operations of the agency. As a result, the existing Information Technology architecture no longer meets the required service levels. A significant Enterprise Architecture (EA) initiative is in progress with the opal to improve customer responsiveness and satisfaction, and improve the overall operational efficiency of the agency.

The current EA staff members were internal appointments based on a request from the EA steering team to supply a number of suitable individuals for the EA effort. Collectively, they possess a broad range of IT and business analysis skills. However, the CIO has expressed concern about the diverse range of experience within the team. There is concern that the EA staff may be lacking in some of the critical skills that are required to properly conduct EA activities. It had been assumed that any EA-related skill gaps would be overcome by on-the-job mentoring from the senior members of the EA staff. Each architect was expected to attend a TOGAF training course and participate in other skill development activities.

A recent review of the EA program revealed that many EA staff members, despite attending multi-day training courses, were not proficient in analyzing or creating the models and artifacts required for their assigned architecture projects. Stakeholders have observed errors and inconsistencies in artifacts and deliverables being submitted for review.

Refer to the Scenario

The CIO has asked you to recommend a professional development plan for the EA staff in order to address the findings raised in the recent review.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You recommend that a comprehensive evaluation of key team leader skills be made using the TOGAF Architecture Skills Framework. Based on the evaluations, you will recommend the necessary staff changes. This will ensure that the team leaders have the necessary skills and experience for the architecture tasks within the agency. The role and skill categories defined in the TOGAF Architecture Skills Framework should then be shared with the depar

B.

You recommend that an architecture maturity assessment should be conducted. This will identify the practices on which the agency should focus to see the greatest improvement and ensure that the basic enterprise architecture process is documented. As part of the assessment, all of the team leaders should be interviewed and their qualifications assessed. In order to rectify areas of low proficiency, they are expected to attend additional EA t

C.

You recommend that you work with the EA steering team to adapt the TOGAF Architecture Skills Framework for use within the architecture practice at the agency. The categories of architecture roles, the required skills for each role and the desired level of proficiency for each role and skill will be defined by this framework. Each team member, or prospective team member, can then be evaluated for suitability against these roles and skills. S

D.

You recommend that to address the issues identified in the review, the experienced team leaders should mentor the junior team members. At the same time additional training should be provided. Since it is now known that some models are improperly defined and may have caused cascading errors in other parts of the architecture, you recommend an iteration of the Migration Planning phase occur, so as to develop a coordinated transition to a new

Buy Now
Questions 21

Which of the following best describes the purpose of the Architecture Roadmap?

Options:

A.

It lists work packages on a timeline showing progress towards the Target Architecture

B.

It contains an assessment of the current architecture requirements

C.

It provides for effective communication of the end architecture project to the stakeholders

D.

It forms the basis of a contractual agreement between the sponsor and the architecture organization

E.

It is sent from the sponsor and triggers the start of an architecture development cycle

Buy Now
Questions 22

Complete the sentence. Two of the four architecture domains that are subsets of an overall Enterprise Architecture are Business and Technology, the other two are Application and _________

Options:

A.

Vision

B.

Transition

C.

Segment

D.

Capability

E.

Data

Buy Now
Questions 23

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for a chain of convenience stores. The stores operate 24 hours a day and 7 days a week and use cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.

The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.

An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF standard within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.

The CIO has stated that the following issues need to be addressed in the restructuring:

    They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.

    The architecture should focus on the needs of the business, not technology

    To remain competitive, new products and promotions must undergo market trials and if these are successful, deployed across the retail chain. Information systems must be able to manage changes and updates without undue delays.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current situation.

Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Interoperability, Data is Accessible, Data is Shared, Requirements Based Change, Control Technical Diversity

B.

Requirements Based Change, Business Continuity, Common Vocabulary and Data Definitions, Data Trustee, Responsive Change Management

C.

IT Responsibility, Data Security, Ease of Use, Service Orientation, Common Use Applications

D.

Interoperability, Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management

Buy Now
Questions 24

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for an insurance company, which has been formed through the merger of three previously independent companies. The company now consists of three divisions with the same names and division headquarters as their predecessors.

The lack of integration between the three divisions has increasingly caused problems in the handling of customer and financial information. The inability to share information has resulted in lost opportunities to leverage the synergies that should have been possible as a result of the merger. At present, each division maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, and claims information, each division has different ways of defining these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a common web portal, contact center software suite, and document management system. Also the company has selected a single enterprise-wide customer relationship management (CRM) application to consolidate information from several applications that exist across the divisions. The application will be used by each of the divisions and accessed by third party partners through well defined interfaces.

The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the migration teams in each division. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.

TOGAF 9 has been selected as the core framework for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities.

You need to recommend the best approach for this work.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You would review the mission statements for the company and its divisions, together with the corporate business goals and business drivers. Based on that review, you would work closely with the key stakeholders and the Architecture Board to define the architecture principles. You would ensure that they actively promote the alignment of IT with the corporate business strategies. You would then hold review meetings with the relevant stakehold

B.

You would gather information from credible industry sources in the insurance business. Based on that information, you would assess current trends and apply them to defining a set of principles that embody best practices. You would select architecture principles that do not conflict with each other and that should be stable. You would ensure that all the principles are realistic and avoid including principles that are too obvious.

C.

You would analyze the mission statements for the company and each of its divisions, together with the corporate business goals. Based on that analysis, you would define a set of architecture principles and review them with the CIO. When developing the principles, you would ensure that they actively promote the alignment of IT with the business strategies and initiatives of the company. You would then seek the endorsement of the CIO and seni

D.

You would define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charter. You would publish the principles on the corporate intranet to ensure widespread acceptance and compliance. You would then schedule regular periodic Compliance Assessments with each of the divisions to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in

Buy Now
Questions 25

Scenario:

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

One of the earliest initiatives in the Enterprise Architecture program was the definition of a set of architecture principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Common-use Applications, Control Technical Diversity, Ease of Use, Interoperability, Data is Shared, Data is Accessible, Data Security

B.

Business Continuity, Common-use Applications, Maximize Benefit to the Enterprise, Data is Shared, Data is Accessible, Data Security

C.

Technology Independence, Data Trustee, Information Management is Everybody's Business, IT Responsibility, Responsive Change Management

D.

Service-orientation, Responsive Change Management, Business Continuity, Data is Accessible, Data Security

Buy Now
Questions 26

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.

Refer to the Scenario

As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities.

You need to specify the best approach for this work.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You gather information from credible industry sources in the commodities business. Based on that, you assess current trends and apply that to defining a set of principles that embody best practices. You select architecture principles that do not conflict with each other and that should be stable. You ensure that all the principles are realistic and avoid including principles that are obvious.

B.

You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you define a set of principles and review with the CIO. When developing the principles, you ensure that they actively promote the alignment of IT with the business strategies and initiatives of the company. You then seek the endorsement of the CIO and senior management.

C.

You define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charter. You publish the principles on the corporate intranet to ensure widespread acceptance and compliance. You then schedule regular periodic Compliance Assessments with individual business units to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in the principle

D.

You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you work with the Architecture Board to define the principles. When developing the principles, you ensure that they actively promote the alignment of IT with the corporate business strategies. You then hold a series of review meetings with all the relevant stakeholders, including senior management, ensu

Buy Now
Questions 27

Which of the following best describes the Standards Information Base?

Options:

A.

A repository area that defines the parameters, structures, and processes to support governance.

B.

A repository area that describes the organization specific architecture framework and methodologies.

C.

A repository area that provides guidelines, templates, and pattern used to create new architectures.

D.

A repository area that lists a set of specifications to which architectures must conform

E.

A repository area that provides a record of the governance activity across the enterprise.

Questions 28

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should use stakeholder analysis to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.

Buy Now
Questions 29

Scenario:

Please read this scenario prior to answering the question

The ABC company is a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business.

The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture. The company has selected TOGAF 9 as the basis for its Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

You are serving as the Chief Architect.

You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the Corporate Board's concern is addressed.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You evaluate the implications of the Board's concern in terms of regulatory and security policy requirements. You then update the company security policy to reflect the concern, ensuring that this policy is communicated across the organization.You allocate a security architecture team to ensure that security considerations are included in ongoing architecture planning. You then assess the security implications and agreements within the comp

B.

You start by clarifying the intent that the Board has for raising this concern. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objectives. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture.

C.

You evaluate the implications of the Board's concern in terms of regulatory requirements and their impact on business goals and objectives. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the Board's concern. You allocate a security architect to oversee the implementation of the solution in the ERP system that is being develop

D.

You evaluate the implications of the Board's concern by examining the potential impacts on business goals and objectives. Based on your understanding, you then update the current company security policy to include an emphasis on the Board's concern.In addition, you allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.

Buy Now
Questions 30

Scenario

Please read this scenario prior to answering the Question

You are working as a consultant to the Chief Architect at an intelligence and security organization responsible for securing government communications and information systems. These provide real-time, highly secure communication of voice, video, and message data to remote locations around the world. The agency has recently received information from intelligence sources that the current encryption protocols may no longer be secure. In response, a program is underway to upgrade the systems.

The agency has an established Enterprise Architecture (EA) capability based on the TOGAF standard. The Executive Director of the agency is the sponsor of the EA capability.

Since reliable, high-performance, and secure communications are essential to preserving national security, the Executive Director has placed more stringent requirements for the architecture of the upgraded systems. It must be able to provide assurance and verification of specific performance measures on the key services that are most crucial for system operation. Focusing on these service-level details and specific measurements, will allow stricter requirements to be enforced in service contracts. It will also provide a high degree of assurance that necessary performance is being delivered and that notifications will occur if any critical service fails to perform as required.

A portion of the program budget has been allocated to context a review of the EA. The scope of the review is to evaluate the processes, content and governance of the EA capability to ensure that the higher target performance and service levels required by the upgraded system can be achieved.

The Chief Architect has noted that the core EA artifacts that have been in use are not able to describe these new capabilities. The artifacts do not have explicit provisions for defining the in-depth measurement requirements regarding specific services required for the system. She has learned that certain services within the current system have service measurement implementations that match some of the new requirements, but they are only used in a few areas.

Recent EA efforts at another national agency have produced generalized high-performance communication system models to realize similar requirements in a critical defense system involving secure communications. It is possible that these models may be useful for the upgrade program.

Refer to the Scenario

[Note: You may need to refer to the Content Metamodel chapter, section 30.4 (located in Part IV) of the reference text in order to answer this question.]

You have been asked to make recommendations for tailoring the Architecture Content Metamodel to accommodate the requirements of the upgraded system.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend that a Communications Engineering view is created using the infrastructure consolidation extension from the Architecture Content Metamodel. This view will allow architects to align the needed performance measurement communications across the system. This will support the stringent performance measurements needed for the more detailed governance views required for the upgraded system, making the interfaces to the communication

B.

You recommend that the services extension be incorporated into the Architecture Content Metamodel. By using this extension, the service model is no longer constrained by what is expected in typical business service definitions, allowing more flexibility for adding customized models to support the more stringent measurement requirements. The services extension can also be used to map terminology between the business services and the applicat

C.

You recommend that the motivation and governance extension are incorporated into the Architecture Content Metamodel. Using these extensions will allow modeling the goals, objectives and drivers for the architecture, linking them to service levels and more detailed governance models. This will also enable the ability to re-use existing profiles, customizing them for the various service contracts involved.

D.

You recommend all of the extensions be incorporated into the Architecture Content Metamodel. The full Content Metamodel will enable the EA team to capture and categorize all the important additional data needed to support the performance and measurement objectives linked to these artifacts. Once the new repository content has been implemented, on- demand queries can be used to generate a customized governance stakeholder view that isolates

Buy Now
Questions 31

Scenario

Please read this scenario prior to answering the Question

You are serving as an Enterprise Architect at a large aerospace company. It designs, manufactures and sells civil and military aviation products worldwide and manufactures in multiple countries both inside and outside of the European Union. The company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems.

Recently, several procurement processes, within the civil aviation business, have has problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant procurement processes and systems. He has committed to the CEO that the business will move to a "Just-in-time" procurement system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. At present, there are no architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing procurement processes or systems.

This project is using an iterative approach for executing the Architecture Development Method (ADM). The architecture development project has completed the Architecture Vision Phase and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures.

Stakeholders concerns that should be addressed by these architectures include:

1. What groups of people should be involved in procurement-related business processes?

2. What applications will these groups use once the architecture development is complete?

3. What non-procurement applications will need to be integrated with the new procurement applications?

4. What are the dependences between the non-procurement and the new procurement applications?

Refer to the Scenario

[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6 (located in Part IV) within the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would describe the Baseline Business Architecture with a Baseline Business Process catalog, and an Object lifecycle catalog. You would describe the Baseline Application Architecture with an Interface catalog and a Technology Portfolio catalog.

B.

You would describe the Baseline Business Architecture with an Organization/Actor catalog, and a Business Service/Function catalog, and a Data Entity/Business Function matrix. You would describe the Baseline Application Architecture with an Application Portfolio catalog and an Application/Function matrix.

C.

You would describe the Target Business Architecture with a Business Interaction matrix, and a Business Service/Function catalog. You would describe the Target Application Architecture with an Application Communication diagram, an Application/Organization matrix, an Application Interaction matrix and an Interface catalog.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog, and Data Lifecycle diagrams. You would describe the Target Application Architecture with Application Communication diagrams, an Application Interaction matrix, and an Application Portfolio catalog.

Buy Now
Questions 32

Scenario:

Please read this scenario prior to answering the Question

You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in musical instruments. The firm has been established for over 100 years, operating in North America for most of that time. In the last ten years, the firm has expanded into European markets and will soon establish a market in Latin America. A future expansion into the Asia Pacific region is also planned.

The firm is organized into several business units that each focus on manufacturing particular families of instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content Framework. The EA process framework is well coordinated with the PMO, Systems Development, and Operations functions.

The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed architecture and how to manage the associated risks.

Refer to the Scenario

You have been asked how to address the concerns of the CIO.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the successful introduction of the architecture into the organization. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed architec

B.

In Phase A, the team should analyze their risk by completing an Implementation Factor Assessment and Deduction Matrix to identify the particular risks associated with the implementation and deployment. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into account. These factors can then be used to assess the initial risks associated with the proposed architecture.

C.

In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify the factors that will influence the successful introduction of the architecture into the organization. The assessment should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess t

D.

In Phase A, the team should conduct a Business Scenario to identify the stakeholders' concerns and the resulting retirements. Once the retirements have been identified, they can be assessed in terms of their risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that cannot be resolved should be identified as residual risks and their disposition should be decided by the Architecture

Buy Now
Questions 33

Scenario:

Please read this scenario prior to answering the question

The ABC company is the prime contractor for the Telesto Unmanned Spacecraft program. Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The company is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.

To achieve this goal, the company needs to define Baseline and Target Architectures. These architectures must address key stakeholders' concerns such as:

1. What groups of people should be involved in procurement-related business processes?

2. What current applications do those groups use?

3. Which procurement-related business processes are supported by zero, one, or many existing applications?

4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects? What non-procurement applications will need to be integrated with any new procurement applications?

5. What data will need to be shared?

At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.

The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle. The company is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.

The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.

Refer to the Scenario.

You are serving as the Lead Architect.

You have been asked to identify the most appropriate architecture viewpoints for this situation.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Baseline Business Process catalogDescribe the Baseline Application Architecture with a Technology Portfolio catalogDescribe the Baseline Data Architecture with a Data diagramIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Actor/Process/Data catalogDescribe the Target Application A

B.

In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the key business objects with Product Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a Data Entity/business Function matrix and

C.

In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalogDescribe the key business objects with Data Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrixIn the later iterations of

D.

In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with an Organization/Actor catalogDescribe the Baseline Application Architecture with a System/Function matrixDescribe the Baseline Data Architecture using a Data Entity/Data Component catalogIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Organization/Actor catalogDescribe the Target Ap

Buy Now
Questions 34

Complete the sentence. Capability-Based Planning is a technique that _______

Options:

A.

ensures timely solutions

B.

identifies services to be shared

C.

focuses on business outcomes

D.

ensures the application of business best practices

E.

ensures business information is communicated to the right people at the right time

Buy Now
Questions 35

Which of the following does the TOGAF standard classify as catalogs, matrices and diagrams?

Options:

A.

Building Blocks

B.

Frameworks

C.

Application Platform Interfaces

D.

Deliverables

E.

Artifacts

Buy Now
Questions 36

Which of the following is an objective of Phase G, Implementation Governance?

Options:

A.

Establish the resources for architecture governance

B.

Develop the Target Technology Architecture

C.

Ensure conformance for the target architecture

D.

Operate the governance framework

E.

Finalize the Implementation and Migration Plan

Questions 37

Scenario:

Please read this scenario prior to answering the Question

Your role is that of Lead Enterprise Architect within a vacation property management firm that has been growing through acquisition. The firm manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed on each property is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis.

The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year.

These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key markets to improve yields.

The firm has a mature enterprise architecture practice and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.

Based on the recommendations from the initial study, the firm has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry.

Refer to the scenario

You have been asked by the Chief Architect to justify the best approach for architecture development to realize the CEO's vision.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. This will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

B.

You recommend that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secur

C.

You recommend that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

D.

You recommend that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify retirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

Buy Now
Questions 38

Which of the following statements best describes the Requirements Management process?

Options:

A.

The review of business requirements within the TOGAF ADM

B.

The prioritization and disposal of architecture requirements

C.

The management of architecture requirements throughput the ADM cycle

D.

The development of requirements that deliver business value

E.

The development of requirements for ADM Phase A

Buy Now
Questions 39

Which of the following best describes an architectural change categorized as a re-architecting change?

Options:

A.

A change to re-align with the business strategy

B.

A change to increase investment in order to create new value for exploitation

C.

A change to reduce costs

D.

A change to derive additional value from the existing investment

Buy Now
Questions 40

Scenario:

Please read this scenario prior to answering the question

The ABC company is an international agricultural company exporting bulbs, flowers and seeds worldwide. It is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The company international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested information about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs. TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice.

Refer to the Scenario

You have been appointed as the Lead Consultant.

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should be able to view the models to see that their concerns have been properly addressed.

B.

Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed,

C.

A stakeholder map should be developed that allows the architects to define groups of stakeholders sharing common concerns. A set of views should then be defined that addresses the concerns for each group- Architecture models can then be created for each view to address the stakeholders' concerns.

D.

For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.

Buy Now
Questions 41

Please read this scenario prior to answering the question

Your role is that of Enterprise Architect for a chain of convenience stores. The chain

includes over five thousand retail outlets. Each store in the chain is an independently

owned and operated franchise. The stores operate 24 hours a day and 7 days a week.

Many of the stores have been with the franchise for more than 10 years and still use the

original IT systems deployed at that time.

The chain has a mature Enterprise Architecture practice based in its headquarters and

uses the TOGAF standard as the method and guiding framework.

The CEO of the chain has stated concerns about the inefficiencies of the current

systems and identified the need to change. He has defined a strategic vision that will

enhance the business by providing its franchisees new services to help them compete

with other retail outlets and online retailers. This strategy is part of the long-term

commitment to enhance the brand image and increase revenue for the chain.

The Chief Architect engaged the services of a leading consulting firm that specializes in

business strategy. An initial study has been conducted to identify the strategic changes

needed to implement the CEO's vision. This recently completed with approval of a

strategic architecture encompassing the entire chain, including detailed requirements

and recommendations. Based on the recommendations from the study, the decision has

been made for the chain to adopt a packaged suite of integrated applications that is

tailored to the needs of the franchise.

The changes will help provide the chain with improved products, and more efficient

operations. The stores will also act as delivery and return locations for a large online

retailer which will further increase the number of potential customers. The addition of a

corporate-wide data warehouse will provide analytics that will enable the marketing

group to improve its ability to target advertising and new products to specific regions.

Refer to the scenario

You have been asked by the Chief Architect to propose the best approach for

architecture development to realize the CEO's vision.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You recommend that the baseline architecture be developed first in order to

assess the current infrastructure capacity and capability. This is since the initial

priority is to understand the problem. Then the focus should be on transition

planning and architecture deployment. This will identify requirements to ensure

that the projects are sequenced in an optimal fashion so as to realize the vision

of the CEO.

B.

You recommend that the architecture development define the target

architecture by going through the architecture definition phases (B-D). This is

because the initial study identified the need to change. This will ensure that the

change can be defined in a structured manner and address the requirements

needed to realize the vision.

C.

You recommend that the target architecture is defined first, followed by

transition planning. This is because the vision is well understood, and the

strategic architecture agreed. The target first approach will ensure that the

current problems and inefficiencies of the baseline architecture are not carried

forward, and that the proposed solution addresses the requirements identified

in the initial study.

D.

You recommend that the focus be on the architecture definition, with a specific

emphasis on understanding the strategic change parameters of the business

strategy. Once understood, the team will be in the best position to identify the

requirements, drivers, issues, and constraints for this engagement. You would

ensure that the target architecture addresses non-functional requirements so

as to ensure the target

Buy Now
Questions 42

Your role is that of an Enterprise Architect, reporting to the Chief Enterprise Architect, at a technology company. The company provides staff, as well as cloud-based services for many government agencies.

The company uses the TOGAF standard as the method and guiding framework for its Enterprise Architecture (EA) practice. The Chief Technology Officer (CTO) is the sponsor of the activity. The practice uses an iterative approach for its architecture development. This has enabled the decision-makers to gain valuable insights into the different aspects of the business.

The nature of the business is such that the data and the information stored on the company systems are the company’s major asset and are highly confidential. The company employees work remotely and need constant access to the company systems, which is done by the public infrastructure. They use message encryption, secure internet connections using Virtual Private Networks (VPNs), and other standard security measures. The company has provided computer security awareness training for all its staff.

The Chief Security Officer (CSO) has noted an increase in distributed denial-of-service (DDoS) attacks on companies with a similar profile. The CSO understands that even with thorough preparation, a major attack could stop employees from being able to do their jobs. This could lead to a large financial loss, damage to the company’s reputation with customers, and employees being unable to work.

A risk assessment has been completed, and the company has looked for cyber insurance that covers such attacks. The price for this insurance is very high. The CTO has decided not to get cyber insurance to cover such attacks.

You have been asked to describe the steps you would take to strengthen the current architecture to improve data protection.

Options:

A.

You would monitor for technology updates from your existing suppliers that could enhance the company’s capabilities to detect, react, and recover from an IT security incident. You would prepare and run a disaster recovery planning exercise for an attack and analyze the performance of the current Enterprise Architecture. Using the findings, you would prepare a gap analysis of the current Enterprise Architecture. You would prepare change requ

B.

You would request an Architecture Compliance Review with the scope to examine the company’s ability to respond to such attacks. You would identify the departments involved and have them nominate representatives. You would then tailor checklists to address the requirement for increased resilience. You would circulate to the nominated representatives for them to complete. You would then review the completed checklists, identifying and resolvi

C.

You would ensure that the company has in place up-to-date processes for managing change to the current Enterprise Architecture. Based on the scope of the concerns raised, you recommend that this be managed at the infrastructure level. Changes should be made to the baseline description of the Technology Architecture. The changes should be approved by the Architecture Board and implemented by change management techniques.

D.

You would assess the business continuity requirements and analyze the current Enterprise Architecture for gaps. You would recommend changes to address the situation and create a change request. You would arrange a meeting of the Architecture Board to assess and approve the change request. Once approved, you would create a new Request for Architecture Work to begin an ADM cycle to implement the changes.

Buy Now
Questions 43

Scenario

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Chief Enterprise Architect of a multinational corporation. The corporation has over 100,000 employees and is organized into 10 divisions with operation in over 60 countries and products sold in over 125 countries. It has major research sites at 8 locations worldwide.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of its products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a trial for a new product.

The Enterprise Architecture group within the company has been engaged in an architecture development system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.

The Enterprise Architecture group is a mature organization. They use the TOGAF ADM with extensions required to support the manufacturing practices and laboratory practices of their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security, regulatory and privacy issues that are relevant.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the Enterprise Architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.

Refer to the Scenario

You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture (s)

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap, you would classify whether the solution is either a new development, purchased solution, or based on an existing product. You would group the similar solutions together to define the work packages. You would then regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the s

B.

You would determine the set of Solution Building Blocks required by identifying which need to be developed and which need to be procured. You would eliminate any duplicate building blocks, and then group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. You would then rank the work packages in terms of cost, and select the most cost-effective options for inclusion in a series of Transition Arch

C.

You would document the factors impacting the implementation and Migration Plan and group the gaps identified in the domain architecture gap analysis results. For each gap, you would identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. You would group similar solutions together to form work packages, and identify dependencies between the work packages and identify dependencies

D.

You would group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool you would then regroup the work packages to account for dependencies. You would sequence the work packages to account for dependencies. You would sequence the work packages into the Capability Increments needed to achieve the Target Architecture. You would schedule the roll

Buy Now
Questions 44

Please read this scenario prior to answering the question

You are serving as the Lead Architect for an Enterprise Architecture project team

within a multinational energy company. The company is organized into two major

business operations:

· Upstream operations which include exploration for crude oil and natural gas and

operating the infrastructure necessary to deliver oil and gas to the market

· Downstream operations which include the manufacturing, distribution and marketing

activities for oil products and chemicals

The downstream business includes oil refining, a retail filling station network,

lubricants manufacture and marketing, industrial fuel and lubricants sales. The

practice for the downstream business has been to operate locally, managed by local

"operating companies".

There is an established Enterprise Architecture program within the company, and the

TOGAF standard has been adopted as the framework.

Safety is a priority for the company, with the aim to ensure it causes zero harm to

people and the environment. The company has to satisfy the regulatory requirements

of each of the countries it operates in.

The Governing Board is concerned about the risk posed by operating in this complex

global environment with a large part of the downstream business represented by local

operating companies.

The Chief Executive Officer (CEO) has requested to be informed about the status of

downstream operations that could impact regulatory compliance. He also wants the

corporate legal staff and auditors to analyze all proposed new downstream operations

to ensure that they are within the legal guidelines for each country. In addition, the

local operating companies should be able to see that the architecture is appropriate

for their needs.

The architecture project team has completed a detailed Request for Architecture Work

providing the high level project description. As the project commences the next phase,

the necessary approvals from management have been received.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development

of an architecture that addresses the needs of the Chief Compliance Officer, legal

staff, auditors and the local operating companies.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You recommend that a Communications Plan be created to address the

powerful and influential stakeholders identified in a stakeholder power grid

matrix. This plan should include a report that summarizes the key features of

the architecture with respect to each location and reflect the stakeholder

requirements. You will check with each stakeholder that their concerns are

being addressed.

B.

You recommend that an Organization Map is created to show the relationships

between the different operations within the company and the local operating

companies. This will be used to identify key stakeholders. A set of models

should then be developed that can be applied uniformly across the project. The

stakeholders can then examine the models to ensure that their needs have

been addressed.

C.

You recommend that a stakeholder analysis is made, so as to identify which

stakeholders are involved, their level of involvement, and their concerns. This

will allow the architects to define groups of stakeholders who have common

concerns. The concerns and relevant viewpoints should then be defined for

each group of stakeholders, and recorded in the Architecture Vision document.

D.

You recommend that an analysis of stakeholders occurs, with 22 types of

stakeholders identified, in five categories - corporate functions, end-user

organization, project organization, systems, and external. Models should then

be created for each stakeholder category to ensure that the system complies

with the local regulations. A formal review should be held with the stakeholders

to verify that their concerns h

Buy Now
Questions 45

NO: 346

Scenario:

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.

A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off-the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.

The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.

Refer to the Scenario

The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer’s concern.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is de

B.

You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the a

C.

You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture C

D.

You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architectur

Buy Now
Questions 46

You are working as an Enterprise Architect. The company you work for creates and sells products targeted at the end-user market, which are sold through retail organizations worldwide.

The company is embarking on a Digital Transformation where it will expand its offerings from physical products to also include digital products and digital services. This includes enabling each of its product lines to offer digital products or services associated with their existing physical products.

The feedback from customers is that they do not find much value in these direct-to-consumer digital products. Analysis of the data on how the products are being used and who is using them shows that the products are not reaching the target audience that they were designed for, leading to a failure to meet the revenue goals. The product manager is seeking advice on how to tackle these problems, while making sure that the products still comply within the guardrails set by the EA team.

You are part of the Enterprise Architecture Team. The company uses Agile product management techniques and Agile development practices. The EA team works with the product management teams, supporting and enabling the Agile development teams.

You are working with the EA Team Leader to develop a plan for the overall Digital Transformation project. You have been asked to work on a specific product line, which is experimenting with new direct-to-consumer digital products using a third-party platform. The product development for this experiment took a Minimum Viable Architecture approach, including a shallow architecture development iteration with a focus on the Application Architecture, followed by a quick and minimal implementation.

The Enterprise Architecture practice at the company is sponsored by the Chief Technology Officer. The EA team has operated successfully for several years and has well-developed processes based on the TOGAF standard. The EA team’s responsibilities include architecting product development processes and customer experience.

The EA team leader wants to know how to gather information in order to respond to the product manager.

Options:

A.

You would revise the target architecture for ADM Phase B and create new architecture models to address the issues raised. The modeling techniques should identify different groups of customers, what they find valuable, how much it costs to serve them, and the resulting revenue. You would examine the customer value by use of value stream mapping to break down the activities for the direct-to-consumer products. You would investigate different

B.

You would review the baseline architecture for ADM Phase B to determine what gaps in functionality have been missed in the target architecture that would meet the customer’s needs and attract the target audience. You would research emerging new technologies and draw up a list of alternatives that would increase the value proposition for the target audience. You would then define candidate roadmap components from the alternatives and develop

C.

You would perform another iteration of ADM Phases B-C. This would include the development of a description in the Architecture Definition Document of how the product architecture needs to operate to achieve the business goals, and how the application will support the needs of the business as well as the customers. The Data Architecture should identify tools for data capture that would help with analysis of the concerns raised by the product

D.

You would focus on the target Application Architecture, revising it to better align with the overall Digital Transformation plan. You would write a new Statement of Architecture Work and submit it for review by the EA team leader. The Statement of Architecture Work should include a detailed project description and a work plan. Once approved by the EA team leader, you would conduct a full ADM cycle based on the Statement of Architecture Work

Buy Now
Questions 47

Which of the following does the TOGAF ADM recommend for use in developing an Architecture Vision document?

Options:

A.

Architecture Principles

B.

Requirement Management

C.

Interoperability Analysis

D.

Business Scenarios

E.

Gap Analysis

Buy Now
Questions 48

Scenario

Please read this scenario prior to answering the question

Your role is consultant to the Lead Architect within a company that manufactures electromechanical devices. The company is organized as independent operational divisions.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF standard for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

A strategic architecture has been approved that includes consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating in several of the divisions’ production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company’s primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains.

Using the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment.

The implementation process is estimated to take four years. Because of the risks posed by the complexity of the current environment, a phased approach is needed to implement the target architectures. The Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete.

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would assess how the plan impacts the other frameworks in use in the organization. The plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, considering available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.

B.

You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the less

C.

You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Arc

D.

You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identi

Buy Now
Questions 49

Please read this scenario prior to answering the question

Your role is consultant to the Lead Enterprise Architect within a multinational manufacturing company. The company has several manufacturing divisions.

The company has a mature Enterprise Architecture practice and uses the TOGAF standard as the basis of Its architecture frame work. In conjunction with the EA program, the company uses several management frameworks. Including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve ils ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new application running as a single instance in the company’s primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufactunng requirements.

The key corporate change attributes and implementation constraints have been confirmed. The gap analysis results have been consolidated and integrated, which has identified the gaps across the Business, Data. Application, and Technology domains. The requirements, dependencies and interoperability requirements needed to integrate the new application have been reviewed, consolidated, and validated. The Business Transformation Readiness Assessment started in Phase A has been completed. The risks associated with the transformation effort have been identified, classified, mitigated for, and documented. The Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables have been completed.

Because of the risks posed by the complexity of the current environment. It has been determined that a phased approach is needed to implement the target architectures. The overall implementation process Is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on the TOGAF Standard. Version 9.2. which of the following is the best answer?

Options:

A.

You recommend that the Architecture Definition Document is finalized and placed under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. An Implementation Governance Model should be produced to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture. The final Implementation and Migration P

B.

You recommend an assessment is made to determine how the plan impacts the other frameworks in use In the organization. If the plan impacts them, then coordination will be required. The business value should then be assigned to each work package, and projects identified for inclusion In the plan, taking Into account available resources and prionties for the projects. The details for the plan should be gathered together and the final Implemen

C.

You recommend that the criteria of business value rs applied to prioritize the implementation projects and project increments. This should focus on the return-on-investment criteria as signed off by the stakeholders, and the performance evaluation criteria used to monitor the progress of the architecture transformation. The Transition Architecture phases should be confirmed using an Architecture Definition Increments Table to list the proje

D.

You recommend that the migration planning outputs are reviewed, and recommendations are produced for the solution development. The priorities, high-level migration strategy, and resources needed should be identified for the development team. The requirements for monitoring tools, and the performance targets for the implementation should be documented. All this information should be gathered and the final Implementation and Migration Plan ge

Buy Now
Questions 50

According to the TOGAF standard, what term describes an individual with an interest in a system?

Options:

A.

Sponsor

B.

Consumer

C.

Lead architect

D.

Stakeholder

Questions 51

Scenario:

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

B.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.

C.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

D.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.

Buy Now
Questions 52

Scenario:

Please read this scenario prior to answering the question

The ABC company started as an accounting and financial services company. It has expanded over the years and is now a leading North American IT and Business Services provider.

With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings. Senior partners must become team players, working to support the broader needs of the company and its shareholders.

The Enterprise Architecture team has been working to create the company's Enterprise Architecture framework to address these issues. The team has defined a preliminary framework and held workshops with key stakeholders to define a set of principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period.

An Architecture Review Board has been formed comprised of IT staff executives and executives from the major practice areas.

The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of the Enterprise Architecture program. The Enterprise Architecture framework is based on TOGAF 9.

As the EA team prepare to formulate an Implementation plan, they have been asked by the CIO to assess the risks associated with the proposed architecture. He has received concerns from senior management that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.

Refer to the Scenario

You have been assigned to the role of Chief Enterprise Architect.

You have been asked to recommend an approach to satisfy the concerns raised.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

An interoperability analysis should be applied to evaluate any potential issues across the Solution Architecture. Once all of the concerns have been resolved, the EA team should finalize the Architecture Implementation Roadmap and the Migration Plan.

B.

The EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.

C.

The EA team should create a consolidated gap analysis to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. An interoperability analysis should be applied to eva

D.

Prior to preparing the Implementation plan, there are several techniques that should be applied to assess the risks and value of the proposed transformation. In particular, the EA team should pay attention to the Business Transformation Readiness Assessment and the Business Value Assessment.

Buy Now
Questions 53

You are an Enterprise Architect working within a multinational company. The company has been very successful and has been buying companies around the world. It has led to a growing number of manufacturing divisions in various locations with a complex supply chain.

The top management recently expressed concerns about the company's effectiveness because of its multiple data centers and duplicate applications. The EA team has been working on a project to solve this issue. An analysis shows that supply chain issues have led to not enough products being produced to meet all the customer demand.

A strategic architecture has been defined to help meet customer demand and manage the supply chain more effectively. The strategic architecture involves combining different Enterprise Resource Planning (ERP) applications that are currently used separately in the company's production sites.

Each division has finished the Architecture Definition documentation to address their own specific manufacturing needs. The enterprise architects have defined a set of work packages that address the gaps found. They have noted the value produced, work needed, and dependencies between work packages to achieve a target architecture for adding a new ERP environment into the company.

Because of the risks posed by this change from the current environment, the architects have recommended that a phased approach should be taken to implement the target architecture with several stages of change. The entire implementation process is estimated to take over two years.

The company has an established Enterprise Architecture (EA) practice and follows the TOGAF Architecture Development Method. The company also uses various management frameworks such as business planning, project/portfolio management, and operations management. The EA program is sponsored by the Chief Information Officer (CIO). In your role as an Enterprise Architect within the EA team, you work closely with the important stakeholders from the various divisions within the company.

You have been asked about the next steps in planning the migration.

Options:

A.

You put the Architecture Definition Document under configuration control. This will make sure that the architecture stays relevant and flexible to the needs of the enterprise. You would identify the needed resources to undertake the development projects. You would then produce an Implementation Governance Model to manage the lessons learned before finishing the plan. You suggest that the lessons learned be applied as changes to the architec

B.

You estimate the business value for each project by applying the Business Value Assessment Technique to prioritize the implementation projects and project steps. The assessment should focus on return on investment and criteria for evaluating performance to track the progress of the architecture transformation. You would confirm and plan a series of Transition Architecture phases using a table of Architecture Definition Increments that lists

C.

You conduct a series of Compliance Assessments to check that the architecture is being implemented as required by the contract. The Compliance Assessment needs to confirm that the implementation team is following the correct development process. This involves using monitoring tools and making sure that performance targets are being achieved. If the targets are not met, you would then need to make adjustments to the performance requirements

D.

You evaluate how the Implementation and Migration Plan affects the other frameworks currently in use within the organization. At a minimum, you make sure that the plan aligns with the business planning, project/portfolio management, and operations management frameworks. Next, you assign a value to each work package, taking into account the resources available and how they fit into the overall strategy. Using these work packages, you select

Buy Now
Questions 54

Please read this scenario prior to answering the question

You have been assigned the role of Lead Enterprise Architect within a leading

professional services company that specializes in providing outsourcing services.

Outsourcing services include business processes, infrastructure, and service

management. The company also provides business consulting services.

The company has an established Enterprise Architecture program based on the TOGAF

standard, sponsored jointly by the Chief Executive Officer and Chief Information Officer.

An Architecture Board has been formed comprised of IT staff executives and executives

from the major service areas and consulting practice.

With numerous service areas and many diverse engagements in progress at any given

time, overall engagement management within the company has become challenging.

The company has recently had a number of high profile projects that have overrun on

budget and under delivered, thereby damaging its reputation.

The Enterprise Architecture (EA) team has been working with the Strategic Planning

team to create a strategic Enterprise Architecture to address these issues. The EA team

has held workshops with key stakeholders to define a set of architecture principles to

govern the architecture work. They have completed an Architecture Vision at a strategic

level and laid out high-level Architecture Definitions for the four domains. They have set

out an ambitious vision of the future of the company over a five-year period. This will

include three distinct transformations.

The CIO has made it clear that prior to the approval of the detailed Implementation and

Migration plan, the EA team will need to assess the risks associated with the proposed

architecture. He has received concerns from some of the senior management across the

company that the proposed architecture may be too ambitious and they are not sure it

can produce sufficient value to warrant the risks.

Refer to the Scenario

You have been asked to recommend an approach to satisfy these concerns.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

The EA team should bring together information about potential solutions from

the appropriate sources within the enterprise, such as the Architecture

Repository. Once the target architecture has been assembled, it should be

analyzed using a state evolution table to determine the Transition Architectures

and associated risks. A value realization process should then be established to

ensure that the concerns raise

B.

The EA team should evaluate the organization's readiness to undergo change.

This will allow the risks associated with the transformations to be identified and

mitigated for. It will also identify improvement actions to be worked into the

Implementation and Migration Plan. The Business Value Assessment

technique should then be used to determine the business value and associated

risks for the transformation.

C.

The EA team should apply an interoperability analysis to evaluate any potential

issues across the architecture. This should include the development of a matrix

showing the interoperability requirements. The EA team would then reconcile

the interoperability requirements with potential solutions and risks. Once all the

concerns have been resolved, the EA team should finalize the Architecture

Roadmap and the Imple

D.

The EA team should review and consolidate the gap analysis results from

Phases B to D. This should be completed before preparing the detailed

Implementation and Migration plan. The gap analysis results can be used to

understand the transformations that are required to achieve the proposed

Target Architecture. The EA team should then assess the readiness of the

organization to undergo change. Once the architectu

Buy Now
Questions 55

In Phase D of the ADM cycle, if you are following the order of the steps defined and the current step is to perform gap analysis, what is the next step?

Options:

A.

Develop Baseline Architecture

B.

Define candidate roadmap components

C.

Create Architecture Definition Document

D.

Resolve impacts across the Architecture Landscape

E.

Conduct formal Stakeholder review

Questions 56

Scenario:

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect in a company that develops wind turbines for use in wind farms. The company has three manufacturing facilities, one in North America, one in Asia, and one in Europe. Each of these facilities supplies the power industry in its region.

The company recognizes that the long-term technical potential of wind energy can address the current global dependency on carbon fuels. In order to do so this will require wind turbines to be installed over large areas of higher wild resources. In particular, offshore wind farms can contribute substantially more energy than land stationed trubines.

The research arm of the company has pioneered the development of an offshore wind turbine design, with an improved turbine blade and power system that will produce up to 20% more energy. This will allow the production of significantly more saleable energy. This new design is ready to go into production.

The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Board and uses the TOGAF standard. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

Recently, a pilot architecture project was completed at a single location that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Architecture Board approved the plan for immediate implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement and deploy the new Automated Test System controller for each location. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each location to ensure consistency.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief Engineer's concern.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architectur

B.

You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture C

C.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is de

D.

You use the issued Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of the completed blade assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization

Buy Now
Questions 57

Refer to the scenario

Please read this scenario prior to answering the question

Your role is that of Enterprise Architect for a chain of convenience stores. The chain includes over five thousand retail outlets. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework.

The CEO of the chain has stated concerns about the inefficiencies of the current systems and identified the need to change. He has defined a strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain.

The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations. Based on the recommendations from the study, the decision has been made for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise.

The changes will help provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers.

The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the

CEO's vision

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

Options:

A.

You recommend that the architecture development define the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

You recommend that the baseline architecture be developed first in order to assess the current infrastructure capacity and capability. This is since the initial priority is to understand the problem. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision of the CEO.

C.

You recommend that the focus be on the architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and sec

D.

You recommend that the target architecture is defined first, followed by transition planning. This is because the vision is well understood, and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

Buy Now
Questions 58

Scenario

Please read this scenario prior to answering the Question

Your role is consultant to the Lead Architect within a multinational semiconductor and software design company. Its largest business is in processors, although it also designs system-on-a-chip infrastructure and manufactures memory chips. A characteristic feature of its processors is their low electric power consumption, which makes them particularly suitable for use in portable devices. As well as licensing its technology, the company has several manufacturing divisions.

The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve its ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the proje

B.

You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements

C.

You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and M

D.

You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.

Buy Now
Questions 59

According to TOGAF, where should architecture governance artifacts be stored?

Options:

A.

In the Integrated Information Infrastructure Reference Model

B.

In the Standards Information Base

C.

In the Foundation Architecture

D.

In the Architecture Repository

Buy Now
Questions 60

What are the four dimensions used to scope an architecture?

Options:

A.

Strategy, Portfolio, Project, Solution Delivery

B.

Strategy, Segment, Capability, Budget

C.

Business, Data, Application, Technology

D.

Breadth. Depth, Time Period, Architecture Domains

Buy Now
Questions 61

According to TOGAF, which of the following terms is defined as the key interests that are crucially important to stakeholders?

Options:

A.

Concerns

B.

Principles

C.

Requirements

D.

Views

E.

Viewpoints

Buy Now
Questions 62

What does the TOGAF standard describe as a structure which can be used for developing a broad range of architectures?

Options:

A.

Architecture Viewpoint

B.

Work Package

C.

Metamodel

D.

Architecture Framework

E.

Deliverable

Buy Now
Questions 63

Scenario:

Please read this scenario prior to answering the question

Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. As part of a corporate-wide Lean Manufacturing initiative, the company has defined a strategic architecture to improve its ability to meet consumer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in several of the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.

The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario

The Implementation and Migration Plan v0.l, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the less

B.

You would assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.

C.

You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identi

D.

You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Arc

Buy Now
Questions 64

Which part of the TOGAF standard provides a full description of each architecture phase?

Options:

A.

Architecture Capability Framework

B.

Architecture Development Method

C.

ADM Guidelines and Techniques

D.

Enterprise Continuum & Tools

Buy Now
Questions 65

During a TOGAF ADM cycle, an architecture is denoted as Version 10. What does this indicate?

Options:

A.

A draft, detailed architecture

B.

A formally reviewed, detailed architecture

C.

A formally reviewed, preliminary architecture

D.

A preliminary outline architecture

E.

A high-level outline architecture

Buy Now
Questions 66

Scenario

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect for a chain of convenience stores. The stores operate 24 hours a day and 7 days a week and use cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.

The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.

An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF standard within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.

The CIO has stated that the following issues need to be addressed in the restructuring:

    They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.

    The architecture should focus on the needs of the business, not technology

    To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF standard, Architecture Principles chapter. You may need to refer to the Architecture Principles chapter, section 20.6 (located in Part III) within the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current situation.

Based on the TOGAF standard, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity

B.

IT Responsibility, Data Security, Ease of Use, Service Orientation, Common Use Applications

C.

Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability

D.

Data is Accessible, Data is Shared, Interoperability, Requirements Based Change, Control Technical Diversity

Buy Now
Questions 67

Which of the following does the TOGAF standard describe as a package of functionality defined to meet business needs across an organization?

Options:

A.

An application

B.

An architecture viewpoint

C.

A building block

D.

A deliverable

E.

A solution architecture

Buy Now
Questions 68

Which one of the following does TOGAF state is an objective for Phase A: Architecture Vision?

Options:

A.

To create an implementation and migration strategy

B.

To establish an architecture change management process

C.

To priorities work packages and projects

D.

To validate the business principles, goals, drivers and key performance indicators

Buy Now
Questions 69

What is an objective of ADM Phase G Implementation Governance?

Options:

A.

To develop the Target Technology Architecture

B.

To finalize the Implementation and Migration Plan

C.

To ensure conformance for the target architecture

D.

To establish the resources for architecture governance

E.

To provide continual monitoring of the governance framework

Buy Now
Questions 70

Which of the following is the ability to develop, use and sustain the architecture of a particular enterprise using architecture to govern change?

Options:

A.

An EA framework

B.

An EA Capability

C.

An EA repository

D.

An Enterprise Architecture

Buy Now
Questions 71

Which of the following describes a key objective of the Technology Architecture Phase?

Options:

A.

To define the solution architecture needed to support the Application Architecture

B.

To define technology components into a set of technology platforms

C.

To define the Transition Architectures needed to achieve the Target Architecture

D.

To develop a migration plan to deliver incremental capabilities

E.

To select a set of technology products that will form the basis of a solution architecture

Buy Now
Questions 72

Complete the sentence. In a gap analysis, a building block that appears in the Target Architecture but does not appear in the Baseline Architecture indicates _____

Options:

A.

nonconformant solution building blocks

B.

an error has occurred and the architecture must be re-evaluated

C.

requirements have not been properly documented

D.

functionality that should be eliminated

E.

a new function that must be built or procured

Buy Now
Questions 73

Which one of the following best describes the purpose of a Change Request?

Options:

A.

To act as a deliverable container for artifacts created during a project

B.

To request a dispensation or to kick-start a further cycle of architecture work

C.

To ensure that information is communicated to the right stakeholder at the right time

D.

To review project progress and ensure the implementation is inline with the objectives

E.

To ensure that the results of a Compliance Assessment are distributed to the Architecture Board

Buy Now
Questions 74

Consider the following statement.

According to the TOGAF standard, a governed approach of a particular deliverable will ensure adherence to the principles, standards, and requirements of the existing or developing architectures.

Which deliverable does this refer to?

Options:

A.

An Architecture Contract

B.

The Statement of Architecture Work

C.

The Architecture Definition Document

D.

The Architecture Vision

Buy Now
Questions 75

Which of the following best describes the purpose of the Statement of Architecture Work?

Options:

A.

It contains an assessment of the current architecture requirements

B.

It defines the scope and approach to complete an architecture project

C.

It is sent from the sponsor and triggers the start of an architecture development cycle

D.

It provides a high-level aspirational view of the end architecture project

E.

It provides a schedule for implementation of the target architecture

Buy Now
Questions 76

Complete the sentence. According to TOGAF, the simplest way of thinking about the Enterprise Continuum is as a _____

Options:

A.

Configuration Database

B.

library of architecture artifacts

C.

Requirements Management System

D.

Standards Information Base

E.

view of the Architecture Repository

Buy Now
Questions 77

Which of the following best describes the purpose of the Gap Analysis technique?

Options:

A.

To determine service levels for the architecture

B.

To establish quality metrics for the architecture

C.

To identify commercial building blocks to be purchased

D.

To identify missing functionality

E.

To validate nonfunctional requirements

Buy Now
Questions 78

Within the Architecture Continuum, which of the following consists of generic components inter-relationships principles and guidelines?

Options:

A.

Organization-Specific Architecture

B.

Transition Architecture

C.

Industry Architecture

D.

Common Systems Architecture

E.

Foundation Architecture

Buy Now
Questions 79

Which of the following is a responsibility of an Architecture Board?

Options:

A.

Creating the Statement of Architecture Work

B.

Allocating resources for architecture projects

C.

Identifying the Lead Enterprise Architect to manage an architecture compliance review

D.

Establishing targets for re-use of components

E.

Conducting assessments of the maturity level of architecture discipline within the organization

Buy Now
Questions 80

Which statement best describes iteration and the ADM?

Options:

A.

The level of detail is defined once and applies to all Iterations.

B.

The ADM is iterative between phases B to D, and between Phases E and F.

C.

The ADM is sequential. Iteration is applied within phases.

D.

The ADM is iterative, over the whole process, between phases, and within phases.

Buy Now
Questions 81

Which of the following best describes an approach for adapting the ADM in the situation where the business case for doing architecture is not well recognized?

Options:

A.

Completion of the Business Architecture should follow the Information Systems Architecture

B.

Create an Architecture Vision and then a detailed Business Architecture

C.

Produce a "cut-down" version of the ADM suitable to the resources available

D.

Tailor the ADM in conjunction with another architecture framework that has deliverables specific to the vertical sector

E.

Tailor the ADM to reflect the relationships with, and dependencies on other management processes within the organization

Buy Now
Questions 82

When determining the requirements for enterprise architecture work in the Preliminary Phase, which of the following is not a business imperative that should be considered?

Options:

A.

Business requirements

B.

Cultural aspirations

C.

Forecast financial requirements

D.

Strategic Intent

E.

Technical elegance

Buy Now
Questions 83

Which of the following does the TOGAF ADM recommend for use in developing the Architecture Vision document?

Options:

A.

Architecture Principles

B.

Business Scenarios

C.

Interoperability Analysis

D.

Migration Planning Techniques

E.

Risk Management Techniques

Buy Now
Questions 84

Complete the sentence. In TOGAF, architecture viewpoints represent ______

Options:

A.

observations of the CIO/CTO

B.

opinions of the sponsors

C.

observations of the architect staff

D.

concerns of stakeholders

E.

stakeholder requirements

Buy Now
Questions 85

Which Architecture domain is recommended to be the first architecture work undertaken in the ADM cycle?

Options:

A.

Application Architecture

B.

Business Architecture

C.

Data Architecture

D.

Technology Architecture

Buy Now
Questions 86

Complete the sentence. The Requirements Management process is used to______.

Options:

A.

develop requirements for Transition Architectures that deliver business value

B.

dispose of, address and prioritize architecture requirements

C.

organize architecture requirements throughout the ADM cycle

D.

review business requirements

E.

validate requirements between ADM phases

Buy Now
Questions 87

Which model within TOGAF is intended to assist with the release management of the TOGAF

specification?

Options:

A.

The Capability Maturity Model

B.

The Document Categorization Model

C.

The Integrated Infrastructure Information Model

D.

The Organizational Model for Enterprise Architecture

E.

The Technical Reference Model

Buy Now
Questions 88

Which one of the following statements about the Requirements Management phase is true?

Options:

A.

All requirements fed into the phase are prioritized, and those of low priority are deferred until the next iteration of the ADM cycle

B.

The phase generates the requirements for a given ADM cycle using the Business Scenario technique

C.

The phase manages the flow of requirements, storing them, and feeding them in and out of the relevant ADM phases

D.

The phase operates like a waiting room, and all requirements fed in to the phase must be resolved by the end of the current ADM cycle

E.

The phase resolves the requirements that are fed into it from the other ADM phases

Buy Now
Questions 89

What component of the Architecture Repository represents architecture requirements agreed with the Architecture Board?

Options:

A.

Architecture Requirements Repository

B.

Reference Library

C.

Architecture Capability

D.

Governance Log

Buy Now
Questions 90

Which of the following best describes the purpose of the Architecture Requirements Specification?

Options:

A.

It provides a list of work packages and a schedule for implementation of the target architecture.

B.

It defines the scope and approach to complete an architecture project

C.

It provides a set of statements that outline what a project must do to comply with the architecture

D.

It is sent from the sponsor and triggers the start of an architecture development cycle

E.

It contains an assessment of the current architecture requirements

Questions 91

Which of the following is an objective of the Preliminary Phase?

Options:

A.

Develop the Architecture Vision document

B.

Draft the Implementation and Migration Plan

C.

Ensure conformance requirements for the target architecture are defined

D.

Establish the Organizational Model for enterprise architecture

E.

Operate the governance framework

Buy Now
Questions 92

Which part of the TOGAF document describes taxonomies for categorizing the outputs of architecture activity?

Options:

A.

ADM Guidelines and Techniques

B.

Architecture Capability Framework

C.

Architecture Development Method

D.

Enterprise Continuum & Tools

Buy Now
Questions 93

Which of the following does the TOGAF document define as architectural work product that describes an aspect of the architecture?

Options:

A.

Application Platform Interface

B.

Artifact

C.

Building Block

D.

Deliverable

E.

Framework

Buy Now
Questions 94

Which of the following best describes the purpose of the Architecture Vision?

Options:

A.

It contains an assessment of the current architecture requirements

B.

It defines the scope and approach to complete an architecture project

C.

It is sent from the sponsor and triggers the start of an architecture development cycle

D.

It provides a high-level aspirational view of the end architecture project

E.

It provides a schedule for implementation of the target architecture

Buy Now
Questions 95

An association of companies has defined a data model for sharing inventory and pricing information.

Which of the following best describes where this model would fit in the Architecture Continuum?

Options:

A.

Foundation Architecture

B.

Common Systems Architecture

C.

Industry Architecture

D.

Organization Specific Architecture

E.

Product Line Architecture

Buy Now
Questions 96

In which ADM phase is the goal to ensure that the architecture achieves its original target business value?

Options:

A.

Phase E

B.

Phase F

C.

Phase G

D.

Phase H

E.

Preliminary Phase

Buy Now
Questions 97

Complete the sentence. There are five criteria that distinguish a good set of principles: Understandable, Robust, Complete, Consistent and __________.

Options:

A.

Agile

B.

Dynamic

C.

Comprehensive

D.

Rational

E.

Stable

Buy Now
Questions 98

Which of the following statements best describes risk management in the ADM?

Options:

A.

Risk analysis is best conducted in the Architecture Vision phase so that the risk is eliminated in subsequent phases

B.

Risk analysis should be carried out first in the Migration Planning phase

C.

Risk analysis is outside the scope of enterprise architecture projects

D.

Risk is pervasive in all enterprise architecture activity and should be managed in all phases of the ADM

E.

The only risks that are within the scope of enterprise architecture are technological risks

Buy Now
Questions 99

Which of the following is an objective of Phase G, Implementation Governance?

Options:

A.

Ensure that the enterprise’s Architecture Capability meets current requirements

B.

Establish the value realization process

C.

Ensure that implementation projects conform with the Target Architecture

D.

Prioritize the projects trough risk validation

E.

Assess the performance of the architecture and make recommendation for change

Questions 100

Which one of the following is considered a relevant architecture resource in ADM Phase D?

Options:

A.

Generic data models relevant to the organization’s industry sector

B.

Existing application models

C.

Generic technology models relevant to the organization’s industry sector

D.

Existing IT services

Questions 101

What are the following activities part of?

• Risk classification

• Risk identification

• Initial risk assessment

Options:

A.

Security Architecture

B.

Risk Management

C.

Phase G

D.

Phase A

Buy Now
Questions 102

Complete the sentence. The TOGAF risk categorization after the implementation of mitigating actions is known as the level of risk.

Options:

A.

Critical

B.

Initial

C.

Intermediate

D.

Residual

E.

Unmitigated

Buy Now
Questions 103

According to TOGAF, which of the following types of architecture has major characteristics that include open system standards and general building blocks?

Options:

A.

Common Systems Architecture

B.

Foundation Architecture

C.

Industry Architecture

D.

Organization-Specific Architecture

Buy Now
Questions 104

Complete the sentence. All of the following are sections of the recommended template for defining Architecture Principles, except ___________

Options:

A.

Name

B.

Statement of Principle

C.

Rationale

D.

Enforcement Policy

E.

Implications

Buy Now
Questions 105

In TOGAF, what is the difference between an artifact and a deliverable?

Options:

A.

An artifact contains one or more deliverables

B.

Artifacts and deliverables are synonymous; there is no difference between them

C.

Deliverables are prepared by the Project Manager, whereas artifacts are defined by the Architect

D.

Deliverables are reusable, whereas artifacts are unique to a given architecture project

E.

Deliverables are specified as contractual outputs from a project, whereas artifacts are not

Buy Now
Questions 106

Which section of the TOGAF document contains a structured metamodel for architectural artifacts?

Options:

A.

Part II: Architecture Development Method

B.

Part III: ADM Guidelines and Techniques

C.

Part IV: Architecture Content Framework

D.

Part VI: TOGAF Reference Models

E.

Part VII: Architecture Capability Framework

Buy Now
Questions 107

Complete the sentence. TOGAF covers the development of four architecture domains, Business, Data, Technology and ___________.

Options:

A.

Application

B.

Capability

C.

Segment

D.

Transition

E.

Vision

Buy Now
Questions 108

Complete the sentence. The purpose of the Preliminary Phase is to_______________.

Options:

A.

define the enterprise strategy

B.

describe the target architecture

C.

architect an Enterprise Architecture Capability

D.

identify the stakeholders and their requirements

Buy Now
Questions 109

Which one of the following is recommended to define requirements and articulate the Architecture Vision created in Phase A?

Options:

A.

Business scenario

B.

Impact analysis

C.

Mission statement

D.

Requirements analysis

E.

Solution architecture

Buy Now
Questions 110

Which one of the following is the most generic artifact in the Architecture Continuum?

Options:

A.

Common Systems Architecture

B.

Foundation Architecture

C.

Industry Architecture

D.

Organization Specific Architecture

E.

Product Line Architecture

Buy Now
Questions 111

What ensures that a project transitioning into implementation also smoothly transitions into appropriate Architecture Governance?

Options:

A.

Transition Plan

B.

Implementation Strategy

C.

Migration Plan

D.

Implementation Governance Model

Buy Now
Questions 112

Complete the sentence. A gap analysis will enable the architect to do all of the following except _____.

Options:

A.

identify building blocks that have been inadvertently omitted

B.

identify building blocks that have been intentionally eliminated

C.

identify building blocks to be carried over

D.

identify new building blocks that are needed

E.

identify potential vendors to provide new building blocks

Buy Now
Questions 113

Which one of the following best describes the purpose of the Communications Plan?

Options:

A.

To act as a deliverable container for artifacts created during a project

B.

To ensure that information is communicated to the right stakeholders at the right time

C.

To ensure that the results of a Compliance Assessment are distributed to the Architecture Board

D.

To inform the Architecture Board of changes to the architecture

E.

To show progression of change from the Baseline Architecture to the Target Architecture

Buy Now
Questions 114

Complete the sentence. A server consolidation project that does not change the operating characteristics of the applications would require _____.

Options:

A.

a complete ADM cycle

B.

a complete re-architecting change

C.

a full revision of the enterprise architecture

D.

an incremental change

E.

a simplification change

Buy Now
Questions 115

Complete the sentence. The practice by which the enterprise architecture is managed and controlled at an enterprise level is known as____________.

Options:

A.

Architecture governance

B.

Corporate governance

C.

IT governance

D.

Portfolio management

E.

Technology governance

Buy Now
Questions 116

Which one of the following is an objective of the Preliminary Phase of the ADM?

Options:

A.

To define the Baseline Architecture for this cycle of the ADM

B.

To define the application systems for the Target Architecture

C.

To define the framework and methodologies to be used

D.

To define the relevant stakeholders and their concerns

E.

To define and prioritize work packages

Buy Now
Questions 117

In Phase G, what document establishes the connection between the architecture organization and the implementation organization?

Options:

A.

Architecture Contract

B.

Architecture Landscape

C.

Architecture Roadmap

D.

Requirements Impact Statement

E.

Transition Architecture

Buy Now
Questions 118

Which of the following is described by the TOGAF document as “a detailed plan of the system at component level to guide its implementation”?

Options:

A.

Architecture

B.

Artifact

C.

Deliverable

D.

Model

E.

View

Buy Now
Questions 119

Which one of the following is the most relevant model for use in Phase C, Application Architecture?

Options:

A.

The ARTS data model

B.

The Integrated Information Infrastructure Reference Model

C.

The Resource-Event-Agent model

D.

The STEP framework

E.

The TOGAF Technical Reference Model

Buy Now
Questions 120

Which phase of the ADM ensures that implementation projects conform to the defined architecture?

Options:

A.

Requirements Management

B.

Phase D

C.

Phase F

D.

Phase G

E.

Phase H

Buy Now
Questions 121

Which of the following best describes the TOGAF classification in Phase H for a re-architecting change?

Options:

A.

A change driven by a requirement to derive additional value from the existing investment

B.

A change driven by a requirement to increase investment in order to create new value for exploitation

C.

A change driven by a requirement to reduce costs

D.

A change driven by a requirement to reduce investment

E.

A change driven by a requirement to re-align with the business strategy

Buy Now
Questions 122

Consider the following statements:

1. Each contracted party is required to act responsibly to the organization and its stakeholders.

2. All decisions taken, processes used, and their implementation will not be allowed to create unfair advantage to any one particular party.

3. Digital Transformation and operations will be more effective and efficient.

4. Strategic decision-making by C-Level executives and business leaders will be more effective.

Which statements highlight the value and necessity for Architecture Governance to be adopted within organizations?

Options:

A.

2 & 3

B.

1 & 2

C.

3 & 4

D.

1 & 4

Buy Now
Questions 123

Which part of TOGAF describes taxonomies for categorizing the outputs of architecture activity in terms of reuse?

Options:

A.

ADM Guidelines and Techniques

B.

Architecture Capability Framework

C.

Architecture Development Method

D.

Enterprise Continuum & Tools

Buy Now
Questions 124

In Phases B, C, and D which is the final step in each phase?

Options:

A.

Conduct formal stakeholder review

B.

Create Architecture Definition Document

C.

Define Roadmap components

D.

Perform gap analysis

E.

Select reference models, viewpoints and tools

Buy Now
Questions 125

Consider the following statements describing the TOGAF ADM

1. All ADM activities are carried out within an iterative cycle of continuous architecture definition and realization

2. The Requirements Management phase is a continuous phase

3. Output from an early phase may be modified in a later phase

4. When a phase starts, the previous phase closes

Which statements are correct?

Options:

A.

2,3 & 4

B.

1,3,4

C.

1,2&3

D.

1,2,4

Buy Now
Questions 126

Complete the sentence. TOGAF defines five criteria for a good set of principles: Complete, Consistent, Stable, Understandable and_______.

Options:

A.

Agile,

B.

Dynamic

C.

Comprehensive

D.

Robust

E.

Strategic

Buy Now
Exam Code: OG0-093
Exam Name: TOGAF 9.2 Combined Part 1 and Part 2
Last Update: Nov 29, 2024
Questions: 420
$66  $164.99
$50  $124.99
$42  $104.99
buy now OG0-093