OG0-093 Sample Questions Answers

Questions 4

Scenario

Please read this scenario prior to answering the Question

Your role is consultant to the Lead Architect within a multinational semiconductor and software design company. Its largest business is in processors, although it also designs system-on-a-chip infrastructure and manufactures memory chips. A characteristic feature of its processors is their low electric power consumption, which makes them particularly suitable for use in portable devices. As well as licensing its technology, the company has several manufacturing divisions.

The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve its ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions ' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company ' s primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the proje

B.

You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements

C.

You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and M

D.

You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.

Buy Now
Questions 5

Please read this scenario prior to answering the question.

You are employed as an Enterprise Architect working within the Enterprise Architecture team at an electric vehicle manufacturer. The company focuses on designing, manufacturing, and advancing battery technology for sustainable transportation, while also investing in charging infrastructure, autonomous driving systems, and renewable energy integration.

The company is introducing a major change to its vehicle design over a five-year period. This will be a cross-functional effort between hardware and software teams, delivering significant new features in the vehicles they manufacture. It is planned to be developed in phases. An architecture to support strategy has been completed with a roadmap for a set of projects.

The Enterprise Architecture team has taken over the architecture for the hardware and software automotive platform used by current vehicles, some of which will be reused in the new vehicle design. The Enterprise Architecture team has started to identify which parts of the architecture can be reused.

The presentation and access to different variations of data that the company plans to offer through its vehicles creates a design challenge. The application portfolio and supporting infrastructure must connect with multiple cloud services and data repositories in different countries to handle data at scale.

Enough of the Business Architecture has been defined so that work can commence on the Information Systems and Technology Architectures. Those architectures need to be defined to support the primary business services that the company plans to provide. These services will handle and use the data created by vehicles, preparing the way for self-driving vehicles in the future.

The company uses the TOGAF standard as the basis for its Enterprise Architecture framework. The Enterprise Architecture team reports to the Chief Technology Officer, who is the sponsor of the Enterprise Architecture program. The Chief Technology Officer requires that the Enterprise Architecture team follow the purpose-based Enterprise Architecture Capability model as described in the TOGAF Series Guide: A Practitioners’ Approach to Developing Enterprise Architecture Following the TOGAF ADM .

Refer to the scenario.

How would you plan, organize, and manage the architecture development at this stage?

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Follow a standard pattern for cloud solutions that manage complex data and fit with the architecture to support strategy. Develop high-level Target Data, Application, and Technology Architectures. Review the Architecture Vision to determine the level of detail, time, and scope of the ADM cycle phases required for architecture development for the project. Identify and estimate the cost of the main work packages. Create an Architecture Roadma

B.

Start an iteration of ADM Phase A, perform a Stakeholder Analysis, identify the key stakeholders, and revise the Architecture Vision. Update the Stakeholder Map created for the strategic architecture so that it reflects the stakeholders who are now most important for the projects that are to be developed. Hold a formal review with the Chief Technology Officer, who should decide which projects to include in the Architecture Roadmap and updat

C.

Architecture descriptions for the Application, Data, and Technology Architectures should be developed at a suitable level to address the problems and identify the different options. For each project, this includes identification of candidate architecture and solution building blocks. Solution providers should be identified, a readiness assessment performed, and the viability and fitness of the solution options assessed. The results should b

D.

The superior architecture should be used to guide the approach. Review the identified projects, dependencies, and potential overlaps, then decide the order for starting the projects. Develop high-level architecture descriptions. For each project, determine how much work is needed, identify reference architectures and candidate building blocks. Identify the resource needs, considering cost and value. Document the different options, risks, an

Buy Now
Questions 6

Scenario:

Please read this scenario prior to answering the question

The ABC company is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The company Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

You are serving as the Lead Enterprise Architect of the newly-formed Common ERP Deployment architecture project team.

As the Common ERP Deployment architecture project team assembles for its initial meeting, many of the participants have voiced concerns about the sweeping scope of the initiative. Others are confident that they know a solution that will work. During the meeting, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the characteristics of the architecture from the business requirements.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary target Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should create Baseline and Target Architectures for each of the manufacturing plants. A gap analysis between the architectures will then validate the approach, and determine the Transition Architecture needed to achieve the target state.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of requirements can be developed that will drive the evolution of the architecture.

Buy Now
Questions 7

Please read this scenario prior to answering the question

Your role is consultant to the Lead Enterprise Architect within a multinational manufacturing company. The company has several manufacturing divisions.

The company has a mature Enterprise Architecture practice and uses the TOGAF standard as the basis of Its architecture frame work. In conjunction with the EA program, the company uses several management frameworks. Including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

The company has defined a strategic architecture to improve ils ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple applications that have been operating independently in the divisions ' production facilities. The goal is to replace the functionality of the existing applications with a new application running as a single instance in the company’s primary data center.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufactunng requirements.

The key corporate change attributes and implementation constraints have been confirmed. The gap analysis results have been consolidated and integrated, which has identified the gaps across the Business, Data. Application, and Technology domains. The requirements, dependencies and interoperability requirements needed to integrate the new application have been reviewed, consolidated, and validated. The Business Transformation Readiness Assessment started in Phase A has been completed. The risks associated with the transformation effort have been identified, classified, mitigated for, and documented. The Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables have been completed.

Because of the risks posed by the complexity of the current environment. It has been determined that a phased approach is needed to implement the target architectures. The overall implementation process Is estimated to take several years.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on the TOGAF Standard. Version 9.2. which of the following is the best answer?

Options:

A.

You recommend that the Architecture Definition Document is finalized and placed under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. An Implementation Governance Model should be produced to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture. The final Implementation and Migration P

B.

You recommend an assessment is made to determine how the plan impacts the other frameworks in use In the organization. If the plan impacts them, then coordination will be required. The business value should then be assigned to each work package, and projects identified for inclusion In the plan, taking Into account available resources and prionties for the projects. The details for the plan should be gathered together and the final Implemen

C.

You recommend that the criteria of business value rs applied to prioritize the implementation projects and project increments. This should focus on the return-on-investment criteria as signed off by the stakeholders, and the performance evaluation criteria used to monitor the progress of the architecture transformation. The Transition Architecture phases should be confirmed using an Architecture Definition Increments Table to list the proje

D.

You recommend that the migration planning outputs are reviewed, and recommendations are produced for the solution development. The priorities, high-level migration strategy, and resources needed should be identified for the development team. The requirements for monitoring tools, and the performance targets for the implementation should be documented. All this information should be gathered and the final Implementation and Migration Plan ge

Buy Now
Questions 8

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for an Enterprise Architecture project team within a multinational oil and gas corporation. It is organized into two major business groupings:

-Upstream operations which include exploration for crude oil and natural gas and operating the infrastructure necessary to deliver oil and gas to the market.

-Downstream operations which include the manufacturing, distribution and marketing activities for oil products and chemicals

Safety is a priority for the company, with the aim to ensure id causes zero harm to people and the environment. The company has to satisfy the regulatory requirements of each of the countries it operates in.

The downstream business generates a third of the company’s profits worldwide and includes more than 30,000 petrol stations and various oil refineries. In some countries it also includes oil refining, a retail station network, lubricants manufacture and marketing, industrial fuel and lubricants sales. The practice for the downstream business has been to operate locally managed by local “operating companies”.

The Governing Board is concerned about the risk posed by operating in this complex global environment with a large part of the downstream business represented by local operating companies. As a result, the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CEO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.

The CCO has approved the expenditure of resources to establish an Enterprise Architecture program, and has mandated the use of the TOGAF standard as the framework. He has requested to be informed about the status of downstream operations that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed new downstream operations to ensure that they are within the legal guidelines for each country. In addition, the local operating companies should be able to see that the architecture is appropriate for their needs.

The architecture project team has worked within the sponsor to complete a detailed Request for Architecture Work providing the high level project description. As the project commences the next phase, the necessary approvals from corporate and line management have been …..

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the local operating companies.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. A formal review should be held with the stakeholders to verify that their concerns have been properly addressed by the models.

B.

You recommend that an analysis of the stakeholders is undertaken, including development of a Stakeholder Map. This will allow the architectures to define groups of stakeholders who have common concerns. The concerns and relevant viewpoints should be defined for each group of stakeholders, and recorded in the Architecture Vision document.

C.

You recommend that the ArchiMate modeling language is used to create a set of models that can be applied uniformly across all architecture projects. Each architecture should then be defined based on this fixed set of models. All concerned parties can then examine the models to ensure that their needs have been addressed.

D.

You recommend that a Communications Plan be created to address the powerful and influential stakeholders. This plan should include a report that summarizes the key features of the architecture with respect to each location and reflect the stakeholders’ requirements. You will check with each stakeholder that their concerns are being addressed.

Buy Now
Questions 9

Scenario

Please read this scenario prior to answering the Question

Your role is that of Lead Enterprise Architect within the staff headquarters of a large hotel chain. The chain manages over 500 hotels across North America and Canada, with another 230 hotels internationally in the United Kingdom, Europe, Australia and New Zealand. Unlike other hotel chains, which are often a mix of company-owned and franchised units, each hotel in the chain is an independently owned and operated franchise. Many of the hotels use the same internal IT systems that they used before they joined the franchise. Until recently, the only requirement that has been placed on each hotel is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis.

The CEO of the chain has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new support services including worldwide reservations, global, national and regional marketing as well as consolidated financial, logistics, and yield management. This strategy is part of the long-term commitment to enhance the brand image and drive superior revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

These changes will provide the chain with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key national and regional markets to improve yields.

The chain has a mature enterprise architecture practice based in its headquarters and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO ' s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendations from the initial study, the chain has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry.

Refer to the scenario

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO ' s vision.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You propose that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

B.

You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

C.

You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.

D.

You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

Buy Now
Questions 10

What does the TOGAF standard provide to guide architectural activity within the enterprise in terms of structures, roles, responsibilities, and processes?

Options:

A.

Architecture Development Method

B.

Architecture Capability Framework

C.

Architecture Content Framework

D.

Enterprise Continuum

Buy Now
Questions 11

Complete the sentence. Actions arising from the Business Transformation Readiness Assessment technique should be incorporated in the ___________

Options:

A.

Architecture Requirements Specification

B.

Implementation Governance Model

C.

Architecture Roadmap

D.

Implementation and Migration Plan

E.

Communications Plan

Buy Now
Questions 12

Scenario

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Chief Enterprise Architect of a multinational corporation. The corporation has over 100,000 employees and is organized into 10 divisions with operation in over 60 countries and products sold in over 125 countries. It has major research sites at 8 locations worldwide.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of its products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a trial for a new product.

The Enterprise Architecture group within the company has been engaged in an architecture development system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.

The Enterprise Architecture group is a mature organization. They use the TOGAF ADM with extensions required to support the manufacturing practices and laboratory practices of their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security, regulatory and privacy issues that are relevant.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the Enterprise Architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.

Refer to the Scenario

You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture (s)

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap, you would classify whether the solution is either a new development, purchased solution, or based on an existing product. You would group the similar solutions together to define the work packages. You would then regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the s

B.

You would determine the set of Solution Building Blocks required by identifying which need to be developed and which need to be procured. You would eliminate any duplicate building blocks, and then group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. You would then rank the work packages in terms of cost, and select the most cost-effective options for inclusion in a series of Transition Arch

C.

You would document the factors impacting the implementation and Migration Plan and group the gaps identified in the domain architecture gap analysis results. For each gap, you would identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. You would group similar solutions together to form work packages, and identify dependencies between the work packages and identify dependencies

D.

You would group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool you would then regroup the work packages to account for dependencies. You would sequence the work packages to account for dependencies. You would sequence the work packages into the Capability Increments needed to achieve the Target Architecture. You would schedule the roll

Buy Now
Questions 13

Complete the sentence. Two of the four architecture domains that are subsets of an overall Enterprise Architecture are Business and Technology, the other two are Application and _________

Options:

A.

Vision

B.

Transition

C.

Segment

D.

Capability

E.

Data

Buy Now
Questions 14

Please read this scenario prior to answering the question

Your role is an Enterprise Architect for a chain of convenience stores. Many of the stores

remain open 24 hours a day. Each store has a standardized retail solution using cloud-

based point-of-sale (POS) technology to manage sales and inventory. The cloud-based

systems collect real-time data to support ordering and product selection decisions

including the tailoring of product assortment based on sales history, customer

demographics as well as the short-term weather forecast.

The company has acquired a smaller competitor, that has similar product lines and

operates in a different geographic region. The CEO believes that a merger will enable

growth through combined offerings and cost savings. This growth includes market share,

geographic expansion, as well as product diversification. The decision has been taken to

quickly integrate the two organizations, including merging retail operations and systems.

The merger will replace duplicated systems with the standardized cloud-based point-of-

sale technology. One innovation that the competitor has deployed is the use of hand-

held tablets within stores, together with a suite of store management applications, and

this is to be adopted across the whole of the merged organization. It has been observed

that this has increased employee satisfaction due to the time savings this has brought

compared to the previous fixed screens used for data entry.

The company has a mature Enterprise Architecture practice based on the TOGAF

Standard, with the CEO and CIO as joint sponsors. A project is underway to manage the

merger of the operations and systems.

The CIO anticipates significant cost savings will be made by moving to the standardized

retail solution across the merged organization. The CIO has also stated that the staff

training for the hand-held tablets should be kept to a minimum due to the large number

of employees, which include a large proportion of part-time employees.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles

that are listed and defined in the TOGAF standard, Architecture Principles chapter. You

may need to refer to the Architecture Principles chapter, section 20.6 (located in Part III)

within the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current

situation.

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

[Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive

Change Management, Service Orientation

B.

Requirements Based Change, Responsive Change Management, Data Trustee,

Common Vocabulary and Data Definitions, Compliance with the Law

C.

Common Use Applications, Data is Shared, Data is Accessible, Ease of Use,

Business Continuity

D.

Data is Accessible, Data is Shared, Interoperability, Technology Independence,

Control Technical Diversity

Buy Now
Questions 15

Scenario

Please read this scenario prior to answering the Question

You are working as a consultant to the Chief Architect at an intelligence and security organization responsible for securing government communications and information systems. These provide real-time, highly secure communication of voice, video, and message data to remote locations around the world. The agency has recently received information from intelligence sources that the current encryption protocols may no longer be secure. In response, a program is underway to upgrade the systems.

The agency has an established Enterprise Architecture (EA) capability based on the TOGAF standard. The Executive Director of the agency is the sponsor of the EA capability.

Since reliable, high-performance, and secure communications are essential to preserving national security, the Executive Director has placed more stringent requirements for the architecture of the upgraded systems. It must be able to provide assurance and verification of specific performance measures on the key services that are most crucial for system operation. Focusing on these service-level details and specific measurements, will allow stricter requirements to be enforced in service contracts. It will also provide a high degree of assurance that necessary performance is being delivered and that notifications will occur if any critical service fails to perform as required.

A portion of the program budget has been allocated to context a review of the EA. The scope of the review is to evaluate the processes, content and governance of the EA capability to ensure that the higher target performance and service levels required by the upgraded system can be achieved.

The Chief Architect has noted that the core EA artifacts that have been in use are not able to describe these new capabilities. The artifacts do not have explicit provisions for defining the in-depth measurement requirements regarding specific services required for the system. She has learned that certain services within the current system have service measurement implementations that match some of the new requirements, but they are only used in a few areas.

Recent EA efforts at another national agency have produced generalized high-performance communication system models to realize similar requirements in a critical defense system involving secure communications. It is possible that these models may be useful for the upgrade program.

Refer to the Scenario

[Note: You may need to refer to the Content Metamodel chapter, section 30.4 (located in Part IV) of the reference text in order to answer this question.]

You have been asked to make recommendations for tailoring the Architecture Content Metamodel to accommodate the requirements of the upgraded system.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend that a Communications Engineering view is created using the infrastructure consolidation extension from the Architecture Content Metamodel. This view will allow architects to align the needed performance measurement communications across the system. This will support the stringent performance measurements needed for the more detailed governance views required for the upgraded system, making the interfaces to the communication

B.

You recommend that the services extension be incorporated into the Architecture Content Metamodel. By using this extension, the service model is no longer constrained by what is expected in typical business service definitions, allowing more flexibility for adding customized models to support the more stringent measurement requirements. The services extension can also be used to map terminology between the business services and the applicat

C.

You recommend that the motivation and governance extension are incorporated into the Architecture Content Metamodel. Using these extensions will allow modeling the goals, objectives and drivers for the architecture, linking them to service levels and more detailed governance models. This will also enable the ability to re-use existing profiles, customizing them for the various service contracts involved.

D.

You recommend all of the extensions be incorporated into the Architecture Content Metamodel. The full Content Metamodel will enable the EA team to capture and categorize all the important additional data needed to support the performance and measurement objectives linked to these artifacts. Once the new repository content has been implemented, on- demand queries can be used to generate a customized governance stakeholder view that isolates

Buy Now
Questions 16

What does the TOGAF standard describe as a structure which can be used for developing a broad range of architectures?

Options:

A.

Architecture Viewpoint

B.

Work Package

C.

Metamodel

D.

Architecture Framework

E.

Deliverable

Buy Now
Questions 17

Please read this scenario prior to answering the question

Your role is that of Enterprise Architect for a chain of convenience stores. The chain

includes over five thousand retail outlets. Each store in the chain is an independently

owned and operated franchise. The stores operate 24 hours a day and 7 days a week.

Many of the stores have been with the franchise for more than 10 years and still use the

original IT systems deployed at that time.

The chain has a mature Enterprise Architecture practice based in its headquarters and

uses the TOGAF standard as the method and guiding framework.

The CEO of the chain has stated concerns about the inefficiencies of the current

systems and identified the need to change. He has defined a strategic vision that will

enhance the business by providing its franchisees new services to help them compete

with other retail outlets and online retailers. This strategy is part of the long-term

commitment to enhance the brand image and increase revenue for the chain.

The Chief Architect engaged the services of a leading consulting firm that specializes in

business strategy. An initial study has been conducted to identify the strategic changes

needed to implement the CEO ' s vision. This recently completed with approval of a

strategic architecture encompassing the entire chain, including detailed requirements

and recommendations. Based on the recommendations from the study, the decision has

been made for the chain to adopt a packaged suite of integrated applications that is

tailored to the needs of the franchise.

The changes will help provide the chain with improved products, and more efficient

operations. The stores will also act as delivery and return locations for a large online

retailer which will further increase the number of potential customers. The addition of a

corporate-wide data warehouse will provide analytics that will enable the marketing

group to improve its ability to target advertising and new products to specific regions.

Refer to the scenario

You have been asked by the Chief Architect to propose the best approach for

architecture development to realize the CEO ' s vision.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You recommend that the baseline architecture be developed first in order to

assess the current infrastructure capacity and capability. This is since the initial

priority is to understand the problem. Then the focus should be on transition

planning and architecture deployment. This will identify requirements to ensure

that the projects are sequenced in an optimal fashion so as to realize the vision

of the CEO.

B.

You recommend that the architecture development define the target

architecture by going through the architecture definition phases (B-D). This is

because the initial study identified the need to change. This will ensure that the

change can be defined in a structured manner and address the requirements

needed to realize the vision.

C.

You recommend that the target architecture is defined first, followed by

transition planning. This is because the vision is well understood, and the

strategic architecture agreed. The target first approach will ensure that the

current problems and inefficiencies of the baseline architecture are not carried

forward, and that the proposed solution addresses the requirements identified

in the initial study.

D.

You recommend that the focus be on the architecture definition, with a specific

emphasis on understanding the strategic change parameters of the business

strategy. Once understood, the team will be in the best position to identify the

requirements, drivers, issues, and constraints for this engagement. You would

ensure that the target architecture addresses non-functional requirements so

as to ensure the target

Buy Now
Questions 18

Which of the following best describes the purpose of an Architecture Definition Document?

Options:

A.

To act as a deliverable container for artifacts created during a project

B.

To ensure that architecture information is communicated to the right stakeholders at the right time

C.

To provide a high-level view of the end architecture product

D.

To govern the architecture throughout its implementation process

E.

To show progression of change from the Baseline Architecture to the Target Architecture

Questions 19

What ADM Phase generates the initial complete version of the Architecture Roadmap?

Options:

A.

Phase A: Architecture Vision

B.

Phase E: Opportunities and Solutions

C.

Phase B: Business Architecture

D.

Phase D: Technology Architecture

E.

Phase F: Migration Planning

Buy Now
Questions 20

Scenario

Please read this scenario prior to answering the Question

You are serving as an Enterprise Architect at a large aerospace company. It designs, manufactures and sells civil and military aviation products worldwide and manufactures in multiple countries both inside and outside of the European Union. The company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems.

Recently, several procurement processes, within the civil aviation business, have has problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant procurement processes and systems. He has committed to the CEO that the business will move to a " Just-in-time " procurement system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. At present, there are no architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing procurement processes or systems.

This project is using an iterative approach for executing the Architecture Development Method (ADM). The architecture development project has completed the Architecture Vision Phase and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures.

Stakeholders concerns that should be addressed by these architectures include:

1. What groups of people should be involved in procurement-related business processes?

2. What applications will these groups use once the architecture development is complete?

3. What non-procurement applications will need to be integrated with the new procurement applications?

4. What are the dependences between the non-procurement and the new procurement applications?

Refer to the Scenario

[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6 (located in Part IV) within the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would describe the Baseline Business Architecture with a Baseline Business Process catalog, and an Object lifecycle catalog. You would describe the Baseline Application Architecture with an Interface catalog and a Technology Portfolio catalog.

B.

You would describe the Baseline Business Architecture with an Organization/Actor catalog, and a Business Service/Function catalog, and a Data Entity/Business Function matrix. You would describe the Baseline Application Architecture with an Application Portfolio catalog and an Application/Function matrix.

C.

You would describe the Target Business Architecture with a Business Interaction matrix, and a Business Service/Function catalog. You would describe the Target Application Architecture with an Application Communication diagram, an Application/Organization matrix, an Application Interaction matrix and an Interface catalog.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog, and Data Lifecycle diagrams. You would describe the Target Application Architecture with Application Communication diagrams, an Application Interaction matrix, and an Application Portfolio catalog.

Buy Now
Questions 21

Please read this scenario prior to answering the question.

You are employed as an Enterprise Architect working within the Enterprise Architecture team at an electric vehicle manufacturer. The company focuses on designing, manufacturing, and advancing battery technology for sustainable transportation. The goal of the company is to build the best technology and software platform to support self-driving cars.

An architecture to support strategy has been completed, defining a long-term Target Architecture with a roadmap over five years. This has identified the need for a portfolio of projects over the next two years. The portfolio includes development of an advanced driver assistance system using data gathered from multiple vehicles on the road.

The design of the presentation and accessibility of different types of data that the company plans to offer through its platform is challenging. It is important for the application portfolio to work securely with third-party cloud services and V2X Vehicle-to-Everything service providers across many countries in order to effectively manage large amounts of data. Stakeholders are particularly concerned about the security of V2X. Regulations in various markets mandate that user privacy must always be safeguarded to prevent tracking and compiling of data that could reveal the drivers’ journeys.

The company follows the TOGAF standard as the basis for its Enterprise Architecture practice and uses the purpose-based EA Capability model as described in the TOGAF Series Guide: A Practitioners’ Approach to Developing Enterprise Architecture Following the TOGAF ADM . The EA team reports to the Chief Information Officer, who is the sponsor of the EA program.

You have been assigned to lead the architecture development effort for the driver assistance system. A security resource plan and a vision for a security-specific architecture design have been completed. You have a meeting with the EA team leader to talk about the progress of your work.

Refer to the scenario.

You have been asked how you will address risk and security at this stage of the architecture project.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Data quality is a key factor in risk management. The datasets that need to be safeguarded should be identified. For each dataset, ownership and responsibility for the quality of data should be assigned. A security classification will be defined and applied to each dataset. The dataset owner will then be able to authorize processes that are trusted for a certain activity on the dataset under specific circumstances.

B.

A trust framework should be established with the third parties required for the travel assistance systems. This will describe the relationship with each party and establish the foundation for secure cloud operations. Digital certificates should be a key part of the framework and will be used to create trust between the parties. Regular monitoring for legal and regulatory changes across all the countries should occur to keep the trust framew

C.

Since data is being shared across multiple service providers, a security federation should be established. This includes contractual arrangements and a definition of the responsibility areas for the data exchanged, as well as security implications. Assets with the same security criteria should be grouped together so they can be managed under one security policy. A risk assessment should be carried out to determine the risks relevant to spec

D.

A qualitative risk assessment should be carried out for the data assets exchanged with the service providers. This will deliver a set of priorities, high to medium to low, based on identified threats, the likelihood of occurrence, and the impact. Using the priorities, a Business Risk Model can then be developed detailing the risk strategy, including classifications to determine what mitigation is sufficient. This model can then be used to d

Buy Now
Questions 22

Please read this scenario prior to answering the question.

You are employed as an Enterprise Architect within a large law firm. The firm operates in many countries and has a complicated structure. Every office must follow the local regulations in its country.

The firm has an established Enterprise Architecture department, which has been operating for several years. It has architecture governance and development processes based on the TOGAF standard. In addition to the Enterprise Architecture program, the firm has several management frameworks in use, including business planning, project and portfolio management, and operations management. The Architecture Board includes representatives from all parts of the firm.

The Chief Information Officer is the sponsor of the Enterprise Architecture program. The Chief Information Officer has actively encouraged architecting with agility within the Enterprise Architecture department as her preferred approach for projects. The Chief Information Officer has given approval for a Request for Architecture Work to explore the adoption of an AI-based system for managing legal cases and financial processes.

Senior management has become increasingly worried about how well the business is running, especially with the advancements in Artificial Intelligence. Many of the firm’s competitors have started using AI to assist with legal strategies, streamline processes, and boost productivity. One of the most important benefits AI has for the business is its ability to increase accuracy and minimize mistakes.

Some of the top managers are worried about a change in the way of working and whether it will achieve the goals. Their staff also fear that management will use the system to measure their performance. The Chief Information Officer wants to know how to address these concerns and reduce risks. The new system would provide guidance to legal professionals and analysts on which tasks to focus on. The main goals are to improve productivity and make better use of staff. In addition, the Chief Information Officer hopes these changes will lead to higher customer satisfaction.

Refer to the scenario.

The Chief Information Officer has asked you how to address the concerns and lower risks when introducing Artificial Intelligence in the firm.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

A set of business models should be developed with a focus on the essential business problem and the vision of the proposed change. These models will be used to build consensus with the top managers on the approach for deployment of the AI-based solution. A meeting should be held with the key stakeholders to explain how to use and understand the models. Risk will be managed as part of the Security Architecture development.

B.

Models should be created for each of the high-level Business, Application, and Technology Architectures included in the Architecture Vision. The models can be used to help top management understand the new business direction and make sure that the system will be compliant with the local regulations for each operating entity. A formal review should be held with the stakeholders to confirm that their concerns have been properly addressed by t

C.

The stakeholders should be identified, and their concerns documented in the Architecture Vision. A Communications Plan should be created to address the stakeholders. This plan should include a report that summarizes the key features of the architecture with respect to each location and the stakeholders’ requirements. You will check with key stakeholders that their concerns are being addressed. Risk mitigation should be addressed as part of

D.

An analysis of the stakeholders should be carried out. This will allow the architects to define groups of stakeholders who have common concerns and include development of a Stakeholder Map. The concerns and relevant views should then be defined for each group and recorded in the Architecture Vision document. To reduce risk, you include a requirement that there be progressive development of the Target Architecture to get regular feedback.

Buy Now
Questions 23

NO: 346

Scenario:

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.

A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off-the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.

The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.

Refer to the Scenario

The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer’s concern.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is d

B.

You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the a

C.

You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture C

D.

You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architectur

Buy Now
Questions 24

Please read this scenario prior to answering the question.

You are employed as an Enterprise Architect at a leading global technology enterprise specializing in digital infrastructure, cloud computing, and data-centric innovation. The company provides a vast ecosystem of platforms that serve billions of users across the globe. These platforms span online marketplaces, advanced advertising networks, AI-driven services, productivity tools, and digital entertainment experiences.

The senior leadership within the company is worried about the company’s ability to address all the opportunities around artificial intelligence. They feel that the business is at risk of falling behind its competitors and that significant changes are necessary for the business to remain competitive. Most senior leaders feel that operations need to be more efficient and that the organization needs to change to achieve its future goals.

The company has an established Enterprise Architecture program based on the TOGAF standard, sponsored jointly by the Chief Information Officer and senior executives. In your role as an Enterprise Architect within the Enterprise Architecture team, you work closely with the business stakeholders in the company as well as the sponsors.

The Chief Executive Officer has decided that reorganizing its subsidiaries around artificial intelligence and machine learning will improve the way the company creates and delivers value. The sponsors have approved a project for the reorganization, which is being led by the Enterprise Architecture team.

The Enterprise Architecture team has developed a strategic architecture that has been approved by the sponsors. It includes an Architecture Vision and high-level definitions of the domain architectures. This sets out a plan over a multi-year period and covers three distinct transformations to implement the reorganization.

The sponsors have read reports that the majority of transformation projects dealing with digital and artificial intelligence are failing. They have made it clear that, prior to approval of the detailed Implementation and Migration Plan, the Enterprise Architecture team needs to address the risks associated with the reorganization. They want assurance that the reorganization will succeed and deliver the promised increases in value for the business.

Refer to the scenario.

The Enterprise Architecture team leader has asked how you would address the request from the sponsors.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Before preparing the detailed Implementation and Migration Plan, you would review and consolidate the gap analysis results from Phases B to D. This enables you to evaluate the implications related to potential solutions and interdependencies. It is used to identify the transformations required to achieve the proposed Target Architecture. You then assess the readiness of the organization to undergo change and determine an overall direction t

B.

You would apply an analysis and assessment to evaluate the potential risks with the proposed new architecture. This includes the development of a matrix showing the organizational requirements. The degree of change should then be aligned with the corporate operating model to ensure risks are mitigated and minimized. The risk mitigations can then be included within each of the target Transition Architectures. You would then finalize the Arch

C.

You would assess how ready the organization is to change. This includes identification and classification of the risks associated with the transformations, together with an approach to mitigate the risks. This includes identifying dependencies between the set of changes, including gaps and work packages. It also identifies improvement actions to be worked into the Implementation and Migration Plan. The business value, effort, and risk assoc

D.

You would bring together information about potential approaches and produce several alternative target Transition Architectures. You would then investigate the different architecture alternatives and discuss these with stakeholders using the Architecture Alternatives and Trade-offs technique. Once the Target Architecture has been selected, it should be analyzed using a state evolution table to determine the Transition Architectures. A value

Buy Now
Questions 25

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should use stakeholder analysis to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.

Buy Now
Questions 26

Scenario:

Please read this scenario prior to answering the Question.

The ABC Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache. This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.

The Enterprise Architecture group at the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials. The Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. The company Architecture Development Method is strictly based on TOGAF 9 with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. The project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding Security Architecture has been defined.

The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. He has stated that the changes to the enterprise architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.

Refer to the Scenario

You are serving as the Lead Architect for the project team.

You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability

B.

Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule

C.

Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.

D.

Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using an Enterprise Architec

Buy Now
Questions 27

Which of the following describes an objective of the Preliminary Phase?

Options:

A.

Ensure conformance requirements for the target architecture are defined

B.

Develop the Implementation and Migration Plan

C.

Operate the governance framework

D.

Establish the architecture governance processes

E.

Develop the Architecture Vision document

Questions 28

Scenario:

Please read this scenario prior to answering the question

The ABC company specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer ' s design specifications.

Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.

The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

The company has used T0GAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have adapted their Enterprise Architecture to closely follow the TOGAF 9 framework. All of the company ' s enterprise architects have been trained and certified on TOGAF 9. Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.

An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.

Refer to the Scenario

You are the Lead Architect for this activity.

You have been asked to recommend the best approach to adopt to address the Chief Engineer ' s concern.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the contract is d

B.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture

C.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You ensure that the Manufacturing Architecture Board rev

D.

You create an Architecture Contract to govern the implementation and migration process at each site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. You then schedule compliance reviews at key points in the implementation process to ensure that the work is p

Buy Now
Questions 29

Scenario

Please read this scenario prior to answering the Question

Your role is that of Lead Enterprise Architect for a chain of convenience stores. The chain includes over 15,000 retail outlets throughout the Asia-Pacific region. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.

The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

These changes will provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.

The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO ' s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendations from the initial study, the decision for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise has been taken.

Refer to the scenario

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO ' s vision.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

B.

You propose that this engagement define the baseline architecture first in order to assess the current infrastructure capacity and capability. The initial priority is to understand the proble,. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

C.

You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.

D.

You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

Buy Now
Questions 30

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the Dreadnought Unmanned Aircraft System program.

Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The decision has been made to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.

TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing Architecture Development Method (ADM) projects.

At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving existing processes or systems.

The architect-re development project has put in place Its Architecture Capability for this project and has started a number of iteration cycles to develop the Architecture. Some tasks to address concerns related to the Business Architecture have been completed. The next immediate task is to address the Information Systems Architectures.

The Information Systems Architectures must address stakeholder concerns such as:

1. Which procurement-related business processes are supported by zero, one, or many existing applications?

2. What non-procurement applications will need to be integrated with any new procurement applications?

3. What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

in the early iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture using a Data Entity/Data Component catalog. In the later Iterations of the Architecture Definition, you would describe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrix, and describe the Target

B.

In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix, an

C.

In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matrix. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and

D.

In the early iterations of Architecture development, you would describe the Baseline Application Architecture with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a Data diagram. In the later iterations of Architecture development, you would describe the Target Application Architecture with a System/Technology matrix, and describe the Target Data Architecture with a Data Dissemination diagram.

Buy Now
Questions 31

Which of the following best describes the TOGAF Architecture Development Method?

Options:

A.

A method for controlling change at an enterprise-wide level

B.

A method for developing an organization-specific architecture

C.

A method for managing architecture requirements

D.

A method for classifying architectures and solutions

E.

A method for creating an Architecture Repository

Buy Now
Questions 32

In which phase of the ADM cycle do building blocks become implementation-specific?

Options:

A.

Business Architecture

B.

Data Architecture

C.

Architecture Vision

D.

Opportunities and Solutions

E.

Technology Architecture

Buy Now
Questions 33

Scenario

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Chief Enterprise Architect of a multinational pharmaceutical corporation. The corporation includes 30 subsidiary companies with operations in over 60 countries and products sold in over 125 countries. It has major research and development sites in over 45 locations worldwide.

The management team is deeply committed to ensuring that the corporation is a world leader in socially responsible pharmaceutical development with a business strategy that focuses on profitability through environmentally friendly operating processes as well as a commitment to disease eradication.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of prescription pharmaceutical products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a clinical trial for a new regulated drug.

The Governing Board is concerned about the risks posed in this complex global environment. As a result the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CCO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.

The CCO has approved the expenditure of resources to establish an Enterprise Architecture program. He has requested to be informed about the status of projects that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed architectures to ensure that they are within the legal guidelines for each country. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the research organization.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders ' concerns.

B.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

C.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders ' requirements.

D.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

Buy Now
Questions 34

Scenario:

Please read this scenario prior to answering the question

Your role is that of Lead Enterprise Architect working at the headquarters of a fast food chain. The chain manages over 7500 restaurants across 33 countries. Each restaurant in the chain is an independently owned and operated franchise.

Many of the restaurants still use the first generation IT systems deployed over 10 years ago. The Chief Operating Officer (COO) of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business including providing its franchisees new support services to help them address the increasing competition from coffee shops. This is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

The changes will help provide the chain with improved products, including healthier alternatives in the menu, and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the COO’s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendation from the initial study, the decision has been taken for the chain to adopt a packaged suite of integrated application that is tailored to the needs of the franchise.

Refer to the scenario.

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the COO’s vision.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You propose that the target architecture is defined first by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

You propose that the baseline Technology Architecture is defined first in order to assess current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

C.

You propose that the target architecture is defined first followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

D.

You propose that the focus be placed on architecture definition, with emphasis on understanding the strategic change parameters. The requirements, drivers, issues and constraints for this engagement can then be identified. You would ensure that the target architecture addresses not functional requirements so as to ensure the target architecture is robust and secure.

Buy Now
Questions 35

Scenario:

Please read this scenario prior to answering the Question.

The ABC company is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer. Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average.

The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to AirLight, a competitor, because of superior customer service. The company actually has better coverage in nearly all markets than AirLight, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low. The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan.

They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board. The planning for the program has been underway for several months. The company has selected TOGAF 9 as the basis for its Enterprise Architecture. The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation.

The Executive Council has stated that the program should define specific initiatives to enable each regional business unit to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.

Refer to the Scenario

You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.

The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At the present time, the project team is conducting an architecture development project that is focused on the customer self-service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.

The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.

You have been asked to recommend the course of action to complete the project.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository.The completed Architecture Definition Document and the Implementation and Migration Plan will b

B.

In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture.The resulting Solution Building Blocks will then provide the basis for the capability incre

C.

In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Ftiases E and F, the capability should be broken down into a set of increments that define the Target Architecture. The resulting Solution Building Blocks will provide the basis for the capability increment solutions. The completed Architecture Definition Document and the Implem

D.

The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture.The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Up

Buy Now
Questions 36

Refer to the scenario

Please read this scenario prior to answering the question

Your role is that of Enterprise Architect for a chain of convenience stores. The chain includes over five thousand retail outlets. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework.

The CEO of the chain has stated concerns about the inefficiencies of the current systems and identified the need to change. He has defined a strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain.

The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO ' s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations. Based on the recommendations from the study, the decision has been made for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise.

The changes will help provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers.

The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the

CEO ' s vision

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

Options:

A.

You recommend that the architecture development define the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

You recommend that the baseline architecture be developed first in order to assess the current infrastructure capacity and capability. This is since the initial priority is to understand the problem. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision of the CEO.

C.

You recommend that the focus be on the architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and sec

D.

You recommend that the target architecture is defined first, followed by transition planning. This is because the vision is well understood, and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

Buy Now
Questions 37

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect for a firm that is a major OEM parts supplier to the auto

industry. Europe has been the primary market for its products, with just 20% of its output being

exported to North America. The firm is planning to expand its exports to North America and to

establish sales in other regions.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It

has made significant progress in consolidating the technology portfolio and establishing key

standards. The Chief Information Officer (CIO) and the Chief Operating Officer (COO) are joint

sponsors of the EA program. The EA program is mature, with an active Architecture Board and a

well-defined architecture process and standard content templates based on the TOGAF

Architecture Content Framework. The EA program is well coordinated with the Project Management

Office, Systems Development, and Operations functions.

The firm is organized into business units with each addressing different auto industry sectors. Each

business unit has acquired other producers to expand its manufacturing capacity. This has resulted

in a complex environment with a high diversity of business and manufacturing systems.

The firm has completed a strategic plan to reorganize its Sales and Marketing organization

according to the target geographic markets. One of the goals of this reorganization is to improve

the ability of Marketing to collect more meaningful market analytics that will enable each sector to

better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As

the architecture team commences its work, the CIO has expressed concerns about whether the

firm will be able to adapt to the proposed change and how to manage the associated risks.

Refer to the Scenario

You have been asked how to address the concerns of the CIO.

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

Options:

A.

The EA team should conduct a Business Scenario to describe the business problem,

identify the stakeholders ' concerns and the resulting requirements. Once the requirements

have been identified, they can be assessed in terms of their risks. The risks should be

evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that

cannot be resolved should be identified as residual risks and their

B.

The EA team should create a set of Business Architecture views that will enable them to

identify the factors that will influence the reorganization. There should then be an

assessment of each factor on a maturity scale that will allow the team to gauge the urgency,

readiness, and degree of difficulty to fix. These factors can then be used to assess the initial

risks associated with the proposed project.

C.

The EA team should analyze risk by completing an Implementation Factor Assessment and

Deduction Matrix. This is used to serve as an archive and record of key decisions made in

the implementation and deployment. The matrix should include a list of factors to be

considered, their descriptions, and constraints that should be taken into account. These

factors can then used to assess the initial risks associated with the

D.

The EA team should evaluate the organization ' s readiness to undergo change. This will

identify the factors that will influence the reorganization. This should include determining the

readiness rating for each factor based on a maturity scale that will allow the team to gauge

the urgency, readiness, and degree of difficulty to fix. These factors can then used to assess

the initial risks associated with the proposed

Buy Now
Questions 38

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to " leverage the synergies " that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.

The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its trading partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.

TOGAF 9 has been selected for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

In the Preliminary Phase you need to define suitable policies and ensure that the company has the appropriate capability to address the concerns of the Corporate Board.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You start by clarifying the intent that the Board has for raising these concerns. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objectives. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture and that this be considered an additional domain architecture.

B.

You evaluate the implications of the Board ' s concerns by examining the security and regulatory impacts on business goals, business drivers and objectives. Based on your understanding, you then update the current security policy to include an emphasis on the concerns. You define architecture principles to form constraints on the architecture work to be undertaken in the project. You then allocate a security architect to ensure that securit

C.

You identify and document the security and regulatory requirements for the application and the data being collected. You ensure that written policies are put in place to address the requirements, and that they are communicated across the organization, together with appropriate training for key employees. You identify constraints on the architecture and communicate those to the architecture team. You establish an agreement with the security

D.

You evaluate the implications of the concerns raised by the Corporate Board in terms of regulatory requirements and their impact on business goals and objectives. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the concerns. You allocate a security architect to oversee the implementation of the new application that is being de

Buy Now
Questions 39

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect for a life insurance, annuities, and

pensions company, which has been formed through the merger of three companies.

The company consists of three divisions with the same names and division

headquarters as their predecessors.

The lack of integration between the three divisions has increasingly caused problems

in the handling of customer and financial information. At present, each division

maintains its own applications. Despite an earlier initiative to install a common

application to manage customer, products, and claims information, each division has

different ways of defining its data elements and has customized the common

application to the point where the ability to exchange information is error-prone.

The Chief Information Officer (CIO) has formed an Enterprise Architecture

department, and one of the primary goals in its charter is to coordinate efforts

between the teams in each division. The CIO has also formed a cross-functional

Architecture Board to oversee and perform governance. The TOGAF standard is used

as the basis for the core framework of the Enterprise Architecture program. The

company has an existing team of security architects.

The company has made the decision to introduce a common web portal, contact

center software suite, and document management system. Also the company has

selected a single enterprise-wide customer relationship management (CRM)

application to consolidate information from several applications that exist across the

divisions. The application will be used by each of the divisions and accessed by third

party partners through well-defined interfaces.

The CIO is concerned that the new application must be able to manage and

safeguard customer information in a secure manner that meets or exceeds the legal

requirements of the countries in which the company operates. This will be an

increasingly important capability as the company expands its online services in

cooperation with its external partners.

Refer to the Scenario

As part of the process for initiating the Enterprise Architecture project to rollout the

new application, you are developing a set of architecture principles.

You need to recommend the best approach for this work.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would define a set of principles that support the preferred best practices

embodied in the Enterprise Architecture department charter. You would publish

the principles on the corporate intranet to ensure widespread acceptance and

compliance within the company. You would then schedule regular periodic

Compliance Assessments with each of the divisions to check that they have

made satisfactory progress toward

B.

You would analyze the mission statements for the company and each of its

divisions, together with the corporate business goals. Based on that analysis,

you would define a set of architecture principles and review them with the CIO.

When developing the principles, you would ensure that they actively promote

the alignment of IT with the business strategies and initiatives of the company.

You would then seek the e

C.

You would review the mission statements for the company and its divisions,

together with the corporate business goals and business drivers. Based on that

review, you would work closely with the key stakeholders and the Architecture

Board to define the architecture principles. You would ensure that they actively

promote the alignment of IT with the corporate business strategies. You would

then hold review meetin

D.

You would gather information from credible industry sources in the insurance

business. Based on that information, you would assess current trends and

apply them to defining a set of principles that embody industry best practices.

You would select architecture principles that do not conflict with each other,

that are consistent, and those that are stable. You would ensure that all the

principles are realistic an

Buy Now
Questions 40

Scenario

Please read this scenario prior to answering the Question

You are working as a consultant to the Chief Architect at a government agency responsible for securing all government communications and information systems. The agency has recently received funding for a program that will upgrade the reliability and performance of its secure communication systems which provide real-time, highly secure communication of voice, video, and message data to remote locations around the world.

The agency has an established enterprise architecture (EA) capability based on TOGAF 9. The Executive Director of the agency is the sponsor of the EA capability.

Since reliable, high-performance, and secure communications are essential to preserving national security, the Executive Director has placed more stringent requirements for the architecture for the upgraded system. It must be able to provide assurance and verification of specific performance measures on the key services that are most crucial for system operation. Focusing on these service-level details and specific measurements will allow more stringent requirements to be enforced in service contracts. It will also provide a high degree of assurance that necessary performance is being delivered and that notifications will occur if any critical service fails to perform as required.

A portion of the program budget has been allocated to context a review of the EA. The scope of the review is to evaluate the processes, content and governance of the EA capability to ensure that the higher target performance and service levels required by the upgraded system can be achieved.

The Chief Architecture has noted that the core EA artifacts that have been used since TOGAF 9 was introduced are not adequate to describe these new capabilities. The artifacts do not have explicit provisions for defining the in-depth measurement requirements regarding specific services required for the system. She has learned that certain services within the current system have service measurement implementations that match some of the new requirements, but they are only used in a few areas.

Recent EA efforts at another national agency have produced generalized high-performance communication system models to realize similar requirements in a critical defense system involving secure communications. It is possible that these models may be useful for the upgrade program.

Refer to the Scenario

You have been asked to make recommendations for tailoring the Architecture Content Metamodel to accommodate the requirements of the upgraded system.

Based on TOGAF, which of the following is the best answer?

Options:

A.

Since some artifacts will now require specific measurements and additional data will be needed to support the performance objectives linked to these measurements, you recommend that the motivation and governance extensions of the TOGAF 9 Content Metamodel are used. Using these extensions will allow modeling the goals, objectives and drivers for the architecture, linking them to service levels and more detailed governance models. This will a

B.

You recommend all of the TOGAF 9 Content Metamodel extensions be incorporated into the Architecture Content Metamodel. The full Content Metamodel will enable the EA team to capture and categorize all the important additional data needs to support the performance and measurement objectives linked to these artifacts. Once the new repository content has been implemented, on- demand queries can be used to generate a customized governance stakeh

C.

Since this case requires extensions of the modeling and data details of the service, this is best done by using the services extension of the TOGAF 9 Content Metamodel. By using this extension, the service model is no longer constrained by what is expected in typical business service definitions, allowing more flexibility for adding customized models to support the more stringent measurement requirements. The services extension can also be

D.

To support the type of stringent performance measurements needed for the more detailed governance views required for the upgraded system, the interfaces to the communication and network layer of the architecture must be highly visible at the application level. To accommodate the proper development of this, a Communications Engineering view should be created from the infrastructure extension models of the TOGAF Content Metamodel. This view w

Buy Now
Questions 41

Scenario:

Please read this scenario prior to answering the Question

You have been assigned the role of Lead Enterprise Architect for a firm that is a major OEM parts supplier to the auto industry. Europe has been the primary market for its products, with just 20% of its output being exported to North America. The firm is planning to expand its exports to North America and also to establish sales in South America and the Asia Pacific region. This will enable them to better ride out recessions in key markets such as Europe. It will also enable the firm to exploit the auto industry move to global platforms.

The firm is organized into business units with each addressing different auto industry sectors. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are joint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templated based on the TOGAF Architecture Content Framework. The EA program is well coordinated with the Project Management Office. Systems Development and Operations functions.

The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed change and how to manage the associated risks.

Refer to the Scenario.

You have been asked how to address the concerns of the CIO.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the reorganization. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed project.

B.

In Phase A, the team should conduct a Business Scenario to describe the business problem, identify the stakeholders’ concerns and the resulting requirements. Once the requirements have been identified, they can be assessed in terms of their risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that cannot be resolved should be identified as residual risks and their disposition shoul

C.

In Phase A, the team should evaluate the organization’s readiness to undergo change. This will identify the factors that will influence the reorganization. This should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed project.

D.

In Phase A, the team should analyze their risk by completing an implementation Factor Assessment and Deduction Matrix to identify the risks associated with the implementation and deployment. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into account. These factors can then be used to assess the initial risks associated with the proposed project.

Buy Now
Questions 42

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for the enterprise architecture team at a multinational company. The company has grown rapidly by acquisition and has inherited numerous supply chain processes and related IT systems. Several supply chain processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant processes and systems. The company will move to a " Just-in-time " supply chain management system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM).

At present, there are no particularly useful architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created.The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing supply chain management processes or systems.

The architecture development project has completed Phase A and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business, Application and Data Architectures. Key stakeholder concerns that should be addressed by these architectures include:

1. What groups of people should be involved in supply chain management-related business processes?

2. What non-supply chain management applications will need to be integrated with the new supply chain management applications?

3. What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to Chapter 35 of the reference text in order to answer this question.] You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on TOGAF, which of the following is the best answer?

Options:

A.

In the next iteration of Architecture development, you would describe the Baseline Business Architecture with a Value Chain diagram and a Baseline Business Process catalog. You would describe the Baseline Data Architecture with a Data diagram. You would describe the Baseline Application Architecture with an Environment and Location diagram.

B.

In the next iteration of Architecture development, you would describe the Target Business Architecture with an Organization/Actor catalog, a Business Service/Function catalog and Data Lifecycle diagrams. You would describe the Target Application Architecture with an Application Interaction matrix and Application Communications diagrams.

C.

You would describe the Baseline Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog and a Data Entity/Business Function matrix. You would describe the Baseline Data Architecture using a Data Entity/Data Component catalog. You would describe the Baseline Application Architecture with an Application/Function matrix.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, and a Business Interaction matrix. You would describe the Target Data Architecture with a Data Entity/Business Function matrix and an Application/Data matrix. You would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix.

Buy Now
Questions 43

Scenario:

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect in a company that develops wind turbines for use in wind farms. The company has three manufacturing facilities, one in North America, one in Asia, and one in Europe. Each of these facilities supplies the power industry in its region.

The company recognizes that the long-term technical potential of wind energy can address the current global dependency on carbon fuels. In order to do so this will require wind turbines to be installed over large areas of higher wild resources. In particular, offshore wind farms can contribute substantially more energy than land stationed trubines.

The research arm of the company has pioneered the development of an offshore wind turbine design, with an improved turbine blade and power system that will produce up to 20% more energy. This will allow the production of significantly more saleable energy. This new design is ready to go into production.

The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Board and uses the TOGAF standard. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.

Recently, a pilot architecture project was completed at a single location that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Architecture Board approved the plan for immediate implementation at each plant.

Architecture Contracts have been developed that detail the work needed to implement and deploy the new Automated Test System controller for each location. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each location to ensure consistency.

Refer to the Scenario

You have been asked to recommend the best approach to address the Chief Engineer ' s concern.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architectur

B.

You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture

C.

You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is de

D.

You use the issued Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of the completed blade assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization

Buy Now
Questions 44

Scenario:

Please read this scenario prior to answering the question

The ABC company is the prime contractor for the Telesto Unmanned Spacecraft program. Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The company is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.

To achieve this goal, the company needs to define Baseline and Target Architectures. These architectures must address key stakeholders ' concerns such as:

1. What groups of people should be involved in procurement-related business processes?

2. What current applications do those groups use?

3. Which procurement-related business processes are supported by zero, one, or many existing applications?

4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects? What non-procurement applications will need to be integrated with any new procurement applications?

5. What data will need to be shared?

At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.

The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle. The company is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.

The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.

Refer to the Scenario.

You are serving as the Lead Architect.

You have been asked to identify the most appropriate architecture viewpoints for this situation.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Baseline Business Process catalogDescribe the Baseline Application Architecture with a Technology Portfolio catalogDescribe the Baseline Data Architecture with a Data diagramIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Actor/Process/Data catalogDescribe the Target Application A

B.

In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the key business objects with Product Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a Data Entity/business Function matrix and

C.

In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalogDescribe the key business objects with Data Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrixIn the later iterations of

D.

In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with an Organization/Actor catalogDescribe the Baseline Application Architecture with a System/Function matrixDescribe the Baseline Data Architecture using a Data Entity/Data Component catalogIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Organization/Actor catalogDescribe the Target Ap

Buy Now
Questions 45

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for an insurance company, which has been formed through the merger of three previously independent companies. The company now consists of three divisions with the same names and division headquarters as their predecessors.

The lack of integration between the three divisions has increasingly caused problems in the handling of customer and financial information. The inability to share information has resulted in lost opportunities to leverage the synergies that should have been possible as a result of the merger. At present, each division maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, and claims information, each division has different ways of defining these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has made the decision to introduce a common web portal, contact center software suite, and document management system. Also the company has selected a single enterprise-wide customer relationship management (CRM) application to consolidate information from several applications that exist across the divisions. The application will be used by each of the divisions and accessed by third party partners through well defined interfaces.

The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the migration teams in each division. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.

TOGAF 9 has been selected as the core framework for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities.

You need to recommend the best approach for this work.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You would review the mission statements for the company and its divisions, together with the corporate business goals and business drivers. Based on that review, you would work closely with the key stakeholders and the Architecture Board to define the architecture principles. You would ensure that they actively promote the alignment of IT with the corporate business strategies. You would then hold review meetings with the relevant stakehold

B.

You would gather information from credible industry sources in the insurance business. Based on that information, you would assess current trends and apply them to defining a set of principles that embody best practices. You would select architecture principles that do not conflict with each other and that should be stable. You would ensure that all the principles are realistic and avoid including principles that are too obvious.

C.

You would analyze the mission statements for the company and each of its divisions, together with the corporate business goals. Based on that analysis, you would define a set of architecture principles and review them with the CIO. When developing the principles, you would ensure that they actively promote the alignment of IT with the business strategies and initiatives of the company. You would then seek the endorsement of the CIO and seni

D.

You would define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charter. You would publish the principles on the corporate intranet to ensure widespread acceptance and compliance. You would then schedule regular periodic Compliance Assessments with each of the divisions to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in

Buy Now
Questions 46

Scenario:

Please read this scenario prior to answering the Question

You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in musical instruments. The firm has been established for over 100 years, operating in North America for most of that time. In the last ten years, the firm has expanded into European markets and will soon establish a market in Latin America. A future expansion into the Asia Pacific region is also planned.

The firm is organized into several business units that each focus on manufacturing particular families of instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.

The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content Framework. The EA process framework is well coordinated with the PMO, Systems Development, and Operations functions.

The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.

A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed architecture and how to manage the associated risks.

Refer to the Scenario

You have been asked how to address the concerns of the CIO.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the successful introduction of the architecture into the organization. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess the initial risks associated with the proposed architec

B.

In Phase A, the team should analyze their risk by completing an Implementation Factor Assessment and Deduction Matrix to identify the particular risks associated with the implementation and deployment. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into account. These factors can then be used to assess the initial risks associated with the proposed architecture.

C.

In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify the factors that will influence the successful introduction of the architecture into the organization. The assessment should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fix. These factors can then be used to assess t

D.

In Phase A, the team should conduct a Business Scenario to identify the stakeholders ' concerns and the resulting retirements. Once the retirements have been identified, they can be assessed in terms of their risks. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigated. Any risks that cannot be resolved should be identified as residual risks and their disposition should be decided by the Architectur

Buy Now
Questions 47

Scenario:

Please read this scenario prior to answering the Question

You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.

The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.

" Just In Time " manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.

As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity. The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.

The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.

Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.

Refer to the Scenario

You have been asked to recommend a response to the Chief Architect ' s request to tailor the TOGAF Content Metamodel.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamodel. As the environment is process-centric this will enable them to model the manufacturing processes and store information to support regulatory compliance. It also includes views useful for managing the consolidation of applications into a single data center.

B.

You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamodel. This is suitable as this is a significant IT change that will impact its operational models. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.

C.

You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamodel. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data center. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.

D.

You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamodel. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing process. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Buy Now
Questions 48

The TOGAF Architecture Capability Framework recommends use of an ADM cycle for establishing an architecture practice. In this scenario, which of the following would describe the organizational structure for the architecture practice?

Options:

A.

Technology Architecture

B.

Business Architecture

C.

Transition Architecture

D.

Application Architecture

E.

Data Architecture

Buy Now
Questions 49

Please read this scenario prior to answering the question

Your role is consultant to the Lead Architect within a multinational company. The

company is organized into independent operational divisions on a national basis. The

company adapts its marketing messaging to fit each culture group, with the adaptation

of product offerings and manufacturing processes in each market.

The company has a mature Enterprise Architecture (EA) practice and uses the

TOGAF standard as the basis of its architecture framework. In addition to the EA

program, the company has several management frameworks in use, including

business planning, portfolio/project management, and operations management. The

EA program is sponsored by the CIO.

A strategic architecture has been approved that includes consolidation of multiple

applications that have been operating in the production facilities across the divisions.

The goal is to replace the functionality of the existing applications with a new

application running as a single instance in the company ' s primary data center.

Each division has completed the Architecture Definition documentation required to

integrate the new application to meet its own specific manufacturing requirements.

The key corporate change attributes and implementation constraints have been

confirmed. A consolidated gap analysis has been completed which has identified the

gaps across the Business, Data, Application, and Technology domains. Using the gap

analysis results, a review of the consolidated requirements, dependencies, and

interoperability requirements needed to integrate the new application has been

completed. The Business Transformation Readiness Assessment started in Phase A

has been completed. A risk assessment has been completed.

The implementation process is estimated to take four years. Because of the risks

posed by the complexity of the current environment, a phased approach is needed to

implement the target architectures. The Implementation and Migration Plan v0.1, the

draft Architecture Roadmap, and the Capability Assessment deliverables are now

complete.

Refer to the Scenario

You have been asked to recommend the next steps to prepare the final

Implementation and Migration Plan.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would assess how the plan impacts the other frameworks in use in the

organization. If the plan impacts them, then coordination will be required. You

would then assign a business value to each work package, and identify

projects for the plan, considering available resources and priorities for the

projects. You would then gather the details for the plan, and generate the final

Implementation and Migration Pla

B.

You would review the migration planning outputs, and produce

recommendations for the solution development. You would identify the

priorities, high-level migration strategy, and resources needed for the

development team. You would document the requirements for monitoring

tools, and the performance targets for the implementation. All this information

should be gathered, and the final Implementation and Migration

C.

You would use business value to prioritize the implementation projects and

project increments. This should focus on the return-on-investment criteria set

by the stakeholders, and the performance evaluation criteria used to monitor

the progress of the architecture transformation. You would confirm the

Transition Architecture phases using an Architecture Definition Increments

Table to list the projects. You would

D.

You would place the finalized strategic Architecture Definition Documents and

Transition Architectures under configuration control as part of the ongoing

architecture development cycle. This will ensure that the architecture remains

relevant and responsive to the needs of the enterprise. You would then

produce an Implementation Governance Model to manage the lessons learned

prior to finalizing the plan. You rec

Buy Now
Questions 50

Please read this scenario prior to answering the question.

You are employed as an Enterprise Architect in a team at a large company. The company sells luxury food and drinks in more than 10,000 stores worldwide. The company is a leader in using technology to connect with its customers. This includes online ordering, mobile apps, and rewards programs. The company is also famous for bringing new ideas to the market, such as ordering through apps, using AI to suggest personalized options, self-service pickup stations, and changing prices based on demand.

The stores are open every day. They send timely sales data to a central system that manages inventory. This system can predict what products are needed, adjust stock levels, and automatically order more stock. The stores and the main inventory system work directly with the mobile apps, allowing orders to be made online. The central inventory system is located at the company’s main data center.

The company will merge with a major competitor. This competitor has a synergistic business. Leaders from both companies have told shareholders that the merger will happen quickly and that there will be minimal impact on customers. All stores will keep the current brand names. They will combine their systems, choosing the best ones to use. This means their store management and back-office systems will become one. They will stop using duplicate systems and use one main system to manage the stores. They will also reduce the number of back-office applications they use.

The company has a mature Enterprise Architecture practice, using an adaptation of the TOGAF Architecture Development Method with a focus on digital products. The Enterprise Architecture program is sponsored by the Chief Information Officer.

The Request for Architecture Work to oversee the merger has been approved. Stakeholders, concerns, and business requirements have been identified. The stakeholders have made it clear that they expect to continue to innovate quickly and that changes should not restrict that capability. The scope of what is inside and outside the architecture effort has been confirmed. The next step is to revisit and review the Architecture Principles, as they form part of the constraints on architecture work.

Business Continuity is essential given that the business depends on real-time ordering and automated inventory management. During the systems integration, maintaining service for customers and inventory operations must be prioritized.

Refer to the scenario.

You have been asked to identify the most relevant Architecture Principles for the merger besides Business Continuity.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Control Technical Diversity will help by standardizing technology platforms as part of the integration process. This will be vital for standardizing the app integration for digital orders with the back-office systems, and will reduce complexity and costs during integration. Data Trustee will establish owners to manage the shared data across the company, thereby assuring data quality. Ease-of-Use is needed to make sure that new user interfac

B.

Primacy of Principles will make sure that the same principles apply to both organizations of the newly merged operation, creating consistency across locations. Data as an Asset is critical. Since the company is maintaining separate mobile apps but consolidating back-end systems, treating data as an asset becomes essential. This principle helps ensure that customer data and inventory information from both brands are properly integrated and m

C.

Compliance with the Law makes sure that all company activities comply with relevant laws and regulations. This principle provides the foundation for ensuring the merger meets all legal requirements. Requirements-Based Change will make sure that when combining systems, changes to applications and technology are only made when required by business needs. Responsive Change Management focuses on the speed needed to achieve the goals set by the

D.

Service Orientation will speed up the merger and make it easier to integrate systems while maintaining business operations. Maximize Benefit to the Enterprise will make sure that merger decisions prioritize the overall benefit to the combined company. Common Use Applications across the merged company is preferred over the use of similar or duplicative applications for certain parts of the company. This supports the goal of merging back-off

Buy Now
Questions 51

Which of the following types of architecture defines technology standards for building blocks and reflects general computing requirements?

Options:

A.

Industry Architecture

B.

Transition Architecture

C.

Foundation Architecture

D.

Organization-Specific Architecture

E.

Common Systems Architecture

Buy Now
Questions 52

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect at an multinational company. The company

designs, manufactures and sells products worldwide. It has grown rapidly by

acquisition and has inherited numerous different business processes and related IT

systems. This has led in many instances to a duplication of resources.

The Chief Operating Officer (COO) has made the decision to consolidate and reduce

redundant business processes and IT systems in the sales operations. She has

committed to the CEO that the business will migrate to a set of standardized solutions

that will reduce costs and improve efficiency.

The Enterprise Architecture practice at the company has been assigned to manage

the project. At present, there are no architectural assets in the Architecture Repository

related to this initiative. All assets will need to be acquired, customized, or created

from scratch. The CIO, who is the project sponsor, has identified the need for a set of

commercial off the shelf package applications as candidates for the target. She has

also stated that she is not concerned about preserving the existing business

processes or IT systems within the sales operations.

Your team leader has asked you to assist with developing a response to the following

questions:

Which groups of users will use the different applications and IT systems?

How many licenses and type of licenses are needed for the packaged applications?

What level of support is needed for the users?

Where should the support center(s) be located?

What new capabilities will be required to support this business change?

How much will the migration cost?

This project is using an iterative approach for executing the TOGAF Architecture

Development Method. The architecture development project has completed the

Architecture Vision Phase. A set of packaged applications has been identified and is

being considered, the next iteration will include development of the Business and

Application Target Architectures.

Refer the Scenario.

[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6

(located in Part IV) of the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and

diagrams to support the Architecture development.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would describe the Target Business Architecture with a Business

Interaction matrix, and a Business Service/Function catalog. You would

describe the Target Application Architecture with an Application Communication

diagram, an Application Interaction matrix and an Interface catalog.

B.

You would describe the Target Business Architecture with an

Organization/Actor catalog, a Business Service/Function catalog, and a

Capability/Organization matrix. You would describe the Target Application

Architecture with an Application Portfolio catalog and an Application/Function

matrix.

C.

You would describe the Target Business Architecture with a Business

Capability Map, a Location catalog, and an Organization/Actor catalog. You

would describe the Target Application Architecture with an

Application/Organization Matrix, and Application Migration diagram.

D.

You would describe the Target Business Architecture with a Business

Service/Function catalog, a Location catalog, and an Organization/Actor

catalog. You would describe the Target Application Architecture with an

Application Migration diagram, and an Application and User Location diagram.

Buy Now
Questions 53

You are an Enterprise Architect working within a multinational company. The company has been very successful and has been buying companies around the world. It has led to a growing number of manufacturing divisions in various locations with a complex supply chain.

The top management recently expressed concerns about the company ' s effectiveness because of its multiple data centers and duplicate applications. The EA team has been working on a project to solve this issue. An analysis shows that supply chain issues have led to not enough products being produced to meet all the customer demand.

A strategic architecture has been defined to help meet customer demand and manage the supply chain more effectively. The strategic architecture involves combining different Enterprise Resource Planning (ERP) applications that are currently used separately in the company ' s production sites.

Each division has finished the Architecture Definition documentation to address their own specific manufacturing needs. The enterprise architects have defined a set of work packages that address the gaps found. They have noted the value produced, work needed, and dependencies between work packages to achieve a target architecture for adding a new ERP environment into the company.

Because of the risks posed by this change from the current environment, the architects have recommended that a phased approach should be taken to implement the target architecture with several stages of change. The entire implementation process is estimated to take over two years.

The company has an established Enterprise Architecture (EA) practice and follows the TOGAF Architecture Development Method. The company also uses various management frameworks such as business planning, project/portfolio management, and operations management. The EA program is sponsored by the Chief Information Officer (CIO). In your role as an Enterprise Architect within the EA team, you work closely with the important stakeholders from the various divisions within the company.

You have been asked about the next steps in planning the migration.

Options:

A.

You put the Architecture Definition Document under configuration control. This will make sure that the architecture stays relevant and flexible to the needs of the enterprise. You would identify the needed resources to undertake the development projects. You would then produce an Implementation Governance Model to manage the lessons learned before finishing the plan. You suggest that the lessons learned be applied as changes to the architec

B.

You estimate the business value for each project by applying the Business Value Assessment Technique to prioritize the implementation projects and project steps. The assessment should focus on return on investment and criteria for evaluating performance to track the progress of the architecture transformation. You would confirm and plan a series of Transition Architecture phases using a table of Architecture Definition Increments that lists

C.

You conduct a series of Compliance Assessments to check that the architecture is being implemented as required by the contract. The Compliance Assessment needs to confirm that the implementation team is following the correct development process. This involves using monitoring tools and making sure that performance targets are being achieved. If the targets are not met, you would then need to make adjustments to the performance requirements

D.

You evaluate how the Implementation and Migration Plan affects the other frameworks currently in use within the organization. At a minimum, you make sure that the plan aligns with the business planning, project/portfolio management, and operations management frameworks. Next, you assign a value to each work package, taking into account the resources available and how they fit into the overall strategy. Using these work packages, you select

Buy Now
Questions 54

Which of the following best describes the Standards Information Base?

Options:

A.

A repository area that defines the parameters, structures, and processes to support governance.

B.

A repository area that describes the organization specific architecture framework and methodologies.

C.

A repository area that provides guidelines, templates, and pattern used to create new architectures.

D.

A repository area that lists a set of specifications to which architectures must conform

E.

A repository area that provides a record of the governance activity across the enterprise.

Questions 55

Scenario:

Please read this scenario prior to answering the question

Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. As part of a corporate-wide Lean Manufacturing initiative, the company has defined a strategic architecture to improve its ability to meet consumer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in several of the divisions ' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company ' s primary data center.

The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.

Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.

The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment.

Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.

Refer to the Scenario

The Implementation and Migration Plan v0.l, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the less

B.

You would assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.

C.

You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identi

D.

You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Arc

Buy Now
Questions 56

Your role is that of an Enterprise Architect, reporting to the Chief Enterprise Architect, at a technology company. The company provides staff, as well as cloud-based services for many government agencies.

The company uses the TOGAF standard as the method and guiding framework for its Enterprise Architecture (EA) practice. The Chief Technology Officer (CTO) is the sponsor of the activity. The practice uses an iterative approach for its architecture development. This has enabled the decision-makers to gain valuable insights into the different aspects of the business.

The nature of the business is such that the data and the information stored on the company systems are the company’s major asset and are highly confidential. The company employees work remotely and need constant access to the company systems, which is done by the public infrastructure. They use message encryption, secure internet connections using Virtual Private Networks (VPNs), and other standard security measures. The company has provided computer security awareness training for all its staff.

The Chief Security Officer (CSO) has noted an increase in distributed denial-of-service (DDoS) attacks on companies with a similar profile. The CSO understands that even with thorough preparation, a major attack could stop employees from being able to do their jobs. This could lead to a large financial loss, damage to the company’s reputation with customers, and employees being unable to work.

A risk assessment has been completed, and the company has looked for cyber insurance that covers such attacks. The price for this insurance is very high. The CTO has decided not to get cyber insurance to cover such attacks.

You have been asked to describe the steps you would take to strengthen the current architecture to improve data protection.

Options:

A.

You would monitor for technology updates from your existing suppliers that could enhance the company’s capabilities to detect, react, and recover from an IT security incident. You would prepare and run a disaster recovery planning exercise for an attack and analyze the performance of the current Enterprise Architecture. Using the findings, you would prepare a gap analysis of the current Enterprise Architecture. You would prepare change req

B.

You would request an Architecture Compliance Review with the scope to examine the company’s ability to respond to such attacks. You would identify the departments involved and have them nominate representatives. You would then tailor checklists to address the requirement for increased resilience. You would circulate to the nominated representatives for them to complete. You would then review the completed checklists, identifying and resolvi

C.

You would ensure that the company has in place up-to-date processes for managing change to the current Enterprise Architecture. Based on the scope of the concerns raised, you recommend that this be managed at the infrastructure level. Changes should be made to the baseline description of the Technology Architecture. The changes should be approved by the Architecture Board and implemented by change management techniques.

D.

You would assess the business continuity requirements and analyze the current Enterprise Architecture for gaps. You would recommend changes to address the situation and create a change request. You would arrange a meeting of the Architecture Board to assess and approve the change request. Once approved, you would create a new Request for Architecture Work to begin an ADM cycle to implement the changes.

Buy Now
Questions 57

Which part of the TOGAF standard provides a full description of each architecture phase?

Options:

A.

Architecture Capability Framework

B.

Architecture Development Method

C.

ADM Guidelines and Techniques

D.

Enterprise Continuum & Tools

Buy Now
Questions 58

Scenario:

Please read this scenario prior to answering the question

The ABC company is a large, global commodities trading company which has been growing rapidly through a series of acquisitions.

Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to " leverage the synergies " that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.

As a result, the company has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business.

The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners.

The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture. The company has selected TOGAF 9 as the basis for its Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.

Refer to the Scenario

You are serving as the Chief Architect.

You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the Corporate Board ' s concern is addressed.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You evaluate the implications of the Board ' s concern in terms of regulatory and security policy requirements. You then update the company security policy to reflect the concern, ensuring that this policy is communicated across the organization.You allocate a security architecture team to ensure that security considerations are included in ongoing architecture planning. You then assess the security implications and agreements within the co

B.

You start by clarifying the intent that the Board has for raising this concern. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objectives. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture.

C.

You evaluate the implications of the Board ' s concern in terms of regulatory requirements and their impact on business goals and objectives. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the Board ' s concern. You allocate a security architect to oversee the implementation of the solution in the ERP system that is being dev

D.

You evaluate the implications of the Board ' s concern by examining the potential impacts on business goals and objectives. Based on your understanding, you then update the current company security policy to include an emphasis on the Board ' s concern.In addition, you allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.

Buy Now
Questions 59

Which of the following does the TOGAF standard classify as catalogs, matrices and diagrams?

Options:

A.

Building Blocks

B.

Frameworks

C.

Application Platform Interfaces

D.

Deliverables

E.

Artifacts

Buy Now
Questions 60

Complete the sentence.

A good set of architecture principles that cover every situation perceived throughput the enterprise meet the recommended criteria of____

Options:

A.

understandability

B.

consistency

C.

stability

D.

completeness

E.

robustness

Buy Now
Questions 61

Scenario:

Please read this scenario prior to answering the Question

Your role is that of Lead Enterprise Architect within a vacation property management firm that has been growing through acquisition. The firm manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed on each property is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis.

The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year.

These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key markets to improve yields.

The firm has a mature enterprise architecture practice and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO ' s vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.

Based on the recommendations from the initial study, the firm has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry.

Refer to the scenario

You have been asked by the Chief Architect to justify the best approach for architecture development to realize the CEO ' s vision.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. This will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

B.

You recommend that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secur

C.

You recommend that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

D.

You recommend that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify retirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

Buy Now
Questions 62

Scenario

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect for a chain of convenience stores. The stores operate 24 hours a day and 7 days a week and use cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.

The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day ' s weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.

An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF standard within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.

The CIO has stated that the following issues need to be addressed in the restructuring:

    They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.

    The architecture should focus on the needs of the business, not technology

    To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF standard, Architecture Principles chapter. You may need to refer to the Architecture Principles chapter, section 20.6 (located in Part III) within the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current situation.

Based on the TOGAF standard, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity

B.

IT Responsibility, Data Security, Ease of Use, Service Orientation, Common Use Applications

C.

Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability

D.

Data is Accessible, Data is Shared, Interoperability, Requirements Based Change, Control Technical Diversity

Buy Now
Questions 63

Scenario:

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

B.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.

C.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

D.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders ' concerns.

Buy Now
Questions 64

Scenario:

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

One of the earliest initiatives in the Enterprise Architecture program was the definition of a set of architecture principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Common-use Applications, Control Technical Diversity, Ease of Use, Interoperability, Data is Shared, Data is Accessible, Data Security

B.

Business Continuity, Common-use Applications, Maximize Benefit to the Enterprise, Data is Shared, Data is Accessible, Data Security

C.

Technology Independence, Data Trustee, Information Management is Everybody ' s Business, IT Responsibility, Responsive Change Management

D.

Service-orientation, Responsive Change Management, Business Continuity, Data is Accessible, Data Security

Buy Now
Questions 65

Which of the following best describes an architectural change categorized as a re-architecting change?

Options:

A.

A change to re-align with the business strategy

B.

A change to increase investment in order to create new value for exploitation

C.

A change to reduce costs

D.

A change to derive additional value from the existing investment

Buy Now
Questions 66

Complete the sentence. The Architecture Landscape is divided into levels, Strategic Architectures, _____________

Options:

A.

Segment Architectures, and Capability Architectures

B.

Solution Architectures, and Corporate Architectures

C.

Gap Architectures, and Target Architectures

D.

Transitional Architectures, and Incremental Architectures

E.

Baseline Architectures, and To Be Architectures

Buy Now
Questions 67

Scenario:

Please read this scenario prior to answering the question

Your role is that of the Lead Enterprise Architect at a multinational automotive corporation. The company is headquartered in Germany, and manufactures cars, trucks and buses. It has manufacturing plants across North America, South America, Europe and Asia. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company has an ongoing initiative to improve the efficiency of all of its production operations, and in particular to reduce its carbon footprint. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in energy usage could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in one central data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF standard.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the global CIO. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The architecture project team has now been formed, and has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a remote centralized system. The CIO wants to know how these concerns can be addressed. During the initial project team meeting a number of alternative recommendation for how to proceed have been put forward by members of the team.

Refer to the Scenario

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the tam should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

B.

The team should identify the individuals and groups within the organization who will contribute to the project in order to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

C.

The team should utilize its approved supplier list, and conduct a pilot project that will enable those suppliers to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of requirements will be developed that will drive the evolution of the architecture.

D.

The team should perform a shallow architecture development iteration, developing Baseline and Target Architecture for each of the manufacturing plants. This should include development of a set of views corresponding to selected viewpoints that address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach and determine the capability increments needed to achieve the

Buy Now
Questions 68

Which of the following does the TOGAF ADM recommend for use in developing an Architecture Vision document?

Options:

A.

Architecture Principles

B.

Requirement Management

C.

Interoperability Analysis

D.

Business Scenarios

E.

Gap Analysis

Buy Now
Questions 69

What is part of the approach in the ADM Preliminary Phase?

Options:

A.

Preparing a consolidated Gap Analysis

B.

Defining the enterprise

C.

Developing an Architecture Contract

D.

Extending the business scenario with business modeling

E.

Creating the Architecture Vision deliverable

Buy Now
Questions 70

According to TOGAF, which one of the following best describes an enterprise architecture?

Options:

A.

An architecture of a commercial organization

B.

An architecture that consists of more than one subsidiary company ActualTests.com

C.

An architecture that crosses multiple systems, and multiple functional groups within the enterprise

D.

The highest level of architecture that can be achieved in a given organization

Buy Now
Questions 71

Consider the following statements:

1. Groups of countries, governments, or governmental organizations (such as militaries) working together to create common or shareable deliverables or infrastructures

2. Partnerships and alliances of businesses working together, such as a consortium or supply chain

What are those examples of according to the TOGAF Standard?

Options:

A.

Architectures Scopes

B.

Business Units

C.

Organizations

D.

Enterprises

Buy Now
Questions 72

Which of the following best describes the TOGAF Technical Reference Model?

Options:

A.

It is a detailed data model that can be tailored to specific industries

B.

It is an example of a Common Systems Architecture

C.

It is a fundamental architecture upon which more specific architectures can be based

D.

It is a model of application components and application services software, including brokering applications

Buy Now
Questions 73

In which Phase of the ADM does the business scenario technique figure most prominently?

Options:

A.

Preliminary

B.

Architecture Vision

C.

Business Architecture

D.

Information Systems Architectures

E.

Technology Architecture

Buy Now
Questions 74

Which of the following best describes an approach for adapting the ADM in the situation where the business case for doing architecture is not well recognized?

Options:

A.

Completion of the Business Architecture should follow the Information Systems Architecture

B.

Create an Architecture Vision and then a detailed Business Architecture

C.

Produce a " cut-down " version of the ADM suitable to the resources available

D.

Tailor the ADM in conjunction with another architecture framework that has deliverables specific to the vertical sector

E.

Tailor the ADM to reflect the relationships with, and dependencies on other management processes within the organization

Buy Now
Questions 75

Which one of the following best describes the purpose of a Change Request?

Options:

A.

To act as a deliverable container for artifacts created during a project

B.

To request a dispensation or to kick-start a further cycle of architecture work

C.

To ensure that information is communicated to the right stakeholder at the right time

D.

To review project progress and ensure the implementation is inline with the objectives

E.

To ensure that the results of a Compliance Assessment are distributed to the Architecture Board

Buy Now
Questions 76

When considering the gap analysis technique, which of the following is an example of a business domain gap?

Options:

A.

Skills gap

B.

Financial gap

C.

Data gap

D.

Capability gap

Buy Now
Questions 77

Complete the sentence. During the implementation of an architecture, if the original Architecture Definition and requirements are not suitable, a ____ may be submitted to initiate further architecture work.

Options:

A.

Capability Assessment

B.

Change Request

C.

Requirements Impact Analysis

D.

Statement of Architecture Work

Buy Now
Questions 78

Which of the following is a responsibility of an Architecture Board?

Options:

A.

Creating the Statement of Architecture Work

B.

Allocating resources for architecture projects

C.

Identifying the Lead Enterprise Architect to manage an architecture compliance review

D.

Establishing targets for re-use of components

E.

Conducting assessments of the maturity level of architecture discipline within the organization

Buy Now
Questions 79

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1C-2B-3A-4D

B.

1A-2B-3C-4D

C.

1B-2D-3A-4C

D.

1C-2D-3B-4A

Buy Now
Questions 80

Which one of the following best describes the next step in an Architecture Compliance Review once the scope of the review has been determined?

Options:

A.

Interview the project principals to obtain background information

B.

Prepare the Architecture Compliance Review report

C.

Schedule the Architecture Review meeting

D.

Send the assessment report to the Architecture Review coordinator

E.

Tailor the checklists to address business requirements

Buy Now
Questions 81

Which one of the following lists the five quality criteria for defining Architecture Principles?

Options:

A.

Rational, Explained, Precise, Stated, Identifiable

B.

Comprehensive, Future proof, Short, Concise, Consistent

C.

Open, Enabling, Flexible, Agile, Dynamic

D.

Stable, Understandable, Complete, Robust, Consistent

Buy Now
Questions 82

In Phases B, C, and D of the ADM cycle the first step defined is to select reference models, viewpoints, and tools. Which of the following is the next step in each of these phases?

Options:

A.

Conduct formal stakeholder review

B.

Create Architecture Definition Document

C.

Develop Baseline Architecture

D.

Perform gap analysis

E.

Resolve impacts across the Architecture Landscape

Buy Now
Questions 83

Complete the sentence. As the architecture evolves, the assets in the Solutions Continuum progress towards a (n) _____

Options:

A.

Common Systems Architecture

B.

Industry Specific Architecture

C.

Foundation Solution

D.

Organization Specific Solution

E.

Technology Neutral Implementation

Buy Now
Questions 84

Consider the following ADM phase objectives.

    Develop the Target Data Architecture that enables the Business Architecture and the Architecture Vision.

    Develop the Target Business Architecture that describes how the enterprise needs to operate to achieve the business goals.

    Develop a high-level aspirational vision of the capabilities and business value to be delivered as a result of the proposed Enterprise Architecture.

    Develop the Target Application Architecture that enables the Business Architecture and the Architecture Vision, in a way that addresses the Statement of Architecture Work and stakeholder concerns.

Which phase does each objective match?

Options:

A.

1A-2B-3C-4D

B.

1C-2B-3A-4C

C.

1B-2D-3A-4C

D.

1C-2D-3B-4A

Buy Now
Questions 85

According to TOGAF, which document should incorporate the actions arising from the Business Transformation Readiness Assessment technique?

Options:

A.

Architecture Road map

B.

Architecture Requirements Specification

C.

Communications Plan

D.

Implementation and Migration Plan

E.

Implementation Governance Model

Buy Now
Questions 86

Which of the following are considered as generic Building Blocks in the Solutions Continuum?

Options:

A.

Common Systems Solutions

B.

Foundation Solutions

C.

Industry Solutions

D.

Organization-Specific Solutions

E.

Strategic Solutions

Buy Now
Questions 87

According to TOGAF, which of the following types of architecture has major characteristics that include open system standards and general building blocks?

Options:

A.

Common Systems Architecture

B.

Foundation Architecture

C.

Industry Architecture

D.

Organization-Specific Architecture

Buy Now
Questions 88

The TOGAF ADM uses a version numbering convention to illustrate the evolution of Baseline and Target Architecture Definitions. What does Version 1.0 indicate according to this convention?

Options:

A.

A high-level outline architecture

B.

A preliminary outline architecture

C.

A formally reviewed, detailed architecture

D.

A draft, detailed architecture

E.

A formally reviewed, preliminary architecture

Buy Now
Questions 89

What can be introduced to formalize a joint agreement between development partners and sponsors on the deliverables, quality, and fitness-for-purpose of an architecture?

Options:

A.

Architecture Contracts

B.

Service Level Agreements

C.

Non-disclosure Agreement

D.

The Statement of Architecture Work

Buy Now
Questions 90

Complete the sentence: TOGAF provides a set of reference materials for establishing an architecture function within an organization known as the_________.

Options:

A.

Architecture Capability Framework

B.

Architecture Content Framework

C.

Architecture Landscape

D.

Architecture Repository

E.

Architecture Roadmap

Buy Now
Questions 91

Which one of the following is NOT an objective for Phase C, Data Architecture?

Options:

A.

Defining an architecture that can be understood by the stakeholders

B.

Defining an architecture that is complete and consistent

C.

Defining an architecture that is stable

D.

Defining data entities that are normalized to minimize update anomalies

E.

Defining data entities relevant to the enterprise

Buy Now
Questions 92

According to TOGAF, which of the following best describes how the Enterprise Continuum is used in organizing and developing an architecture?

Options:

A.

It is used to coordinate with the other management frameworks in use

B.

It is used to describe how an architecture addresses stakeholder concerns

C.

It is used to identify and understand business requirements

D.

It is used to provide a system for continuous monitoring

E.

It is used to structure re-usable architecture and solution assets

Buy Now
Questions 93

What component of the Architecture Repository represents architecture requirements agreed with the Architecture Board?

Options:

A.

Architecture Requirements Repository

B.

Reference Library

C.

Architecture Capability

D.

Governance Log

Buy Now
Questions 94

Which of the following best describes a purpose of the Gap Analysis technique?

Options:

A.

To validate non-functional requirements

B.

To establish quality metres for the architecture

C.

To determine service levels for the architecture

D.

To identify missing functions

Buy Now
Questions 95

Which of the following is described by the TOGAF Architecture Content Framework as a type of artifact that shows lists of things?

Options:

A.

Building Block

B.

Catalog

C.

Diagram

D.

Matrix

E.

Deliverable

Buy Now
Questions 96

Complete the sentence. The Architecture Landscape is divided into three levels, Strategic Architectures, Segment Architectures and _____________.

Options:

A.

Baseline Architectures

B.

Capability Architectures

C.

Solution Architectures

D.

Target Architectures

E.

Transition Architectures

Buy Now
Questions 97

TOGAF Part VII, Architecture Capability Framework recommends use of an ADM cycle for establishing an architecture practice. In this scenario which architecture would describe the organizational structure for the architecture practice?

Options:

A.

Application Architecture

B.

Business Architecture

C.

Data Architecture

D.

Technology Architecture

E.

Transition Architecture

Buy Now
Questions 98

Complete the sentence. The TOGAF standard covers the development of four architecture domains. Application, Data, _________________.

Options:

A.

Business and Technology

B.

Information and Knowledge

C.

Baseline and Transition

D.

Vision and Requirements

E.

Capability and Segment

Questions 99

According to TOGAF, in which phase of the ADM should an initial assessment of business transformation readiness occur?

Options:

A.

Preliminary Phase

B.

Phase A

C.

Phase B

D.

Phase F

E.

Phase G

Buy Now
Questions 100

Which phase of the ADM establishes a set of Principles?

Options:

A.

Preliminary Phase

B.

Phase A

C.

Phase D

D.

Phase G

E.

Phase H

Buy Now
Questions 101

What is an objective of the Preliminary Phase?

Options:

A.

To develop the Implementation and Migration Plan

B.

To establish the architecture governance process

C.

To ensure conformance requirements for the target architecture are defined

D.

To operate the governance framework

E.

To develop the Architecture Vision document

Buy Now
Questions 102

Which of the following best describes the purpose of the Business Transformation Readiness Assessment technique?

Options:

A.

To determine if the organization is ready to undergo change

B.

To determine if the stakeholders support the implementation plan

C.

To ensure that there are adequate trained engineers to develop the solution

D.

To ensure that there is sufficient funding to execute the transformation

E.

To plan the migration steps needed to achieve the transformation

Buy Now
Questions 103

What part of the Architecture Repository holds specifications to which architectures must conform?

Options:

A.

Standards Information Base

B.

Enterprise Continuum

C.

Governance Log

D.

Architecture Landscape

E.

Reference Library

Buy Now
Questions 104

Which ADM Phase includes obtaining approval for the Statement of Architecture Work?

Options:

A.

Preliminary Phase

B.

Phase A: Architecture Vision

C.

Phase D: Technology Architecture

D.

Phase F: Migration Planning

E.

Phase G: Implementation Governance

Buy Now
Questions 105

What document is used to initiate a TOGAF ADM cycle?

Options:

A.

Architecture Roadmap

B.

Statement of Architecture Work

C.

Architecture Landscape

D.

Request for Architecture Work

E.

Architecture Vision

Buy Now
Questions 106

Complete the sentence. The ADM can be viewed as the process of populating the enterprise ' s own _______________with relevant re-usable building blocks taken from the more generic side of the Enterprise Continuum.

Options:

A.

Architecture Repository

B.

Architecture Requirements

C.

Implementation and Migration plan

D.

Standards Information Base

E.

Strategic Architecture

Buy Now
Questions 107

What document is sent from the sponsoring organization to the architecture organization to trigger the start of an ADM cycle?

Options:

A.

Architecture Contract

B.

Architecture Definition Document

C.

Architecture Vision

D.

Request for Architecture Work

E.

Statement of Architecture Work

Buy Now
Questions 108

According to TOGAF, in which sequence should Application Architecture and Data Architecture be developed in Phase C?

Options:

A.

Application Architecture should be developed first, then Data Architecture

B.

Application Architecture should be developed concurrently with Data Architecture

C.

Data Architecture should be developed first, then Application Architecture

D.

Application Architecture and Data Architecture may be developed in either sequence

Buy Now
Questions 109

Which one of the following statements about TOGAF Building Blocks is NOT true?

Options:

A.

They should not be reused in other enterprise architecture projects

B.

They should have stable, published interfaces that allow other building block to interoperate with them

C.

They are packages of functionality intended to meet the business needs across the organization

D.

They have defined boundaries

Buy Now
Questions 110

What level of the Architecture Landscape provides a long-term summary view of the entire enterprise?

Options:

A.

Capability Architecture

B.

Operational Architecture

C.

Segment Architecture

D.

Strategic Architecture

E.

Tactical Architecture

Buy Now
Questions 111

Which of the following describes the TOGAF classification in Phase H for a simplification change?

Options:

A.

A change driven by a requirement to derive additional value from the existing investment

B.

A change driven by a requirement to increase investment in order to create new value for exploitation

C.

A change driven by a requirement to reduce investment

D.

A change driven by a requirement to re-align with the business strategy

E.

A change driven by a requirement to simplify communication between stakeholders

Buy Now
Questions 112

What is defined as the effect of uncertainty on objectives?

Options:

A.

Threat

B.

Continuity

C.

Vulnerability

D.

Risk

Buy Now
Questions 113

Which ADM phase starts with the receipt of a Request for Architecture Work from the sponsoring organization?

Options:

A.

Phase A

B.

Phase B

C.

Phase H

D.

Preliminary Phase

E.

Requirements Management

Buy Now
Questions 114

Which of the TOGAF architecture development phases is the first phase of an architecture development cycle, defines the scope for an engagement and identifies the stakeholders?

Options:

A.

Architecture Change Management

B.

Architecture Vision

C.

Business Architecture

D.

Preliminary Phase

E.

Technology Architecture

Buy Now
Questions 115

Which phase of the ADM ensures that implementation projects conform to the defined architecture?

Options:

A.

Requirements Management

B.

Phase D

C.

Phase F

D.

Phase G

E.

Phase H

Buy Now
Questions 116

According to TOGAF, the recommended dimensions used to define the scope of an architecture include all the following, except:

Options:

A.

Architecture Domains

B.

Enterprise Focus

C.

Level of Detail

D.

Subject Matter

E.

Time Period

Buy Now
Questions 117

The TOGAF ADM uses version numbering to illustrate the evolution of Baseline and Target Architecture Definitions. Which version number is used to indicate a high-level outline of the architecture?

Options:

A.

Version 0.1

B.

Version 0.7

C.

Version 1.0

D.

Version 0.9

E.

Version 0.5

Questions 118

Complete the sentence. According to TOGAF, the simplest way of thinking about the Enterprise Continuum is as a _____

Options:

A.

Configuration Database

B.

library of architecture artifacts

C.

Requirements Management System

D.

Standards Information Base

E.

view of the Architecture Repository

Buy Now
Questions 119

Which of the following does the TOGAF document define as the representation of a related set of concerns?

Options:

A.

Catalog

B.

Matrix

C.

Diagram

D.

View

E.

Viewpoint

Buy Now
Questions 120

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1F-2G-3G-4H

B.

1H-2F-3F-4G

C.

1G-2H-3H-4F

D.

1F-2G-3H-4H

Buy Now
Questions 121

Which one of the following statements about the structure of the TOGAF 9 document is true?

Options:

A.

Part I, the Enterprise Continuum, describes a model for structuring a virtual repository

B.

Part II, the Architecture Development Method, describes the definitions of terms used in TOGAF, and the changes between versions of TOGAF

C.

Part III, Tools and Support, describes a collection of guidelines and techniques used in the other parts of TOGAF

D.

Part VI, TOGAF Reference Models, includes a model for release management of the TOGAF specification

E.

Part VII, the Architecture Capability Framework, describes processes and skills to establish an enterprise function

Buy Now
Questions 122

What is used to structure architectural information in an orderly way so that it can be processed to meet stakeholder needs?

Options:

A.

An Architecture Framework

B.

An EA Library

C.

A Content Metamodel

D.

A Stakeholder Map

Buy Now
Questions 123

Complete the sentence. The TOGAF standard covers the development of four architecture domains, Application. Business. Data and__________.

Options:

A.

Transition

B.

Capability

C.

Technology

D.

Segment

Buy Now
Questions 124

Which ADM phase includes establishing the Architecture Capability and definition of Architecture Principles?

Options:

A.

Phase B: Business Architecture

B.

Preliminary Phase

C.

Phase A: Architecture Vision

D.

Phase F: Migration Planning

E.

Phase C: Data Architecture

Questions 125

In Phase G, what document establishes the connection between the architecture organization and the implementation organization?

Options:

A.

Architecture Contract

B.

Architecture Landscape

C.

Architecture Roadmap

D.

Requirements Impact Statement

E.

Transition Architecture

Buy Now
Questions 126

Which statement best describes the main purpose of the TOGAF Content Framework?

Options:

A.

To prevent gaps in the target architecture deliverable set.

B.

To address IT system concerns relevant to an enterprise.

C.

To drive consistency in the outputs when following the ADM.

D.

To store the artifacts identified in the Architecture Repository.

Buy Now
Questions 127

Which one of the following is responsible for the acceptance and sign-off of an Architecture Compliance review?

Options:

A.

Architecture Board

B.

Architecture Review Coordinator

C.

CIO

D.

Lead Enterprise Architect

E.

Project Leader

Buy Now
Questions 128

Complete the sentence. The Architecture Landscape is divided into levels known as____________________.

Options:

A.

Gaps, Plateaus, and Target Architectures

B.

Segment, Strategic, and Capability Architectures

C.

Transitional, Complete, and Incremental Architectures

D.

Baseline. Transition, and To Be Architectures

Buy Now
Questions 129

During a TOGAF ADM cycle, an architecture can be denoted as Version 1.0. What does this indicate?

Options:

A.

A high-level outline architecture

B.

A formally reviewed, detailed architecture

C.

A formally reviewed, preliminary architecture

D.

A draft, detailed architecture

Buy Now
Questions 130

Which of the following describes the practice by which the enterprise architecture is managed and controlled at an enterprise-wide level?

Options:

A.

Architecture governance

B.

Portfolio management

C.

IT governance

D.

Technology governance

E.

Corporate governance

Buy Now
Questions 131

Which of the following best describes a purpose of the Gap Analysis technique?

Options:

A.

To catch errors in a project architecture early

B.

To guide decision making throughout the enterprise

C.

To help identify and understand business requirements

D.

To highlight shortfalls between the baseline and target architectures

E.

To mitigate risk when implementing an architecture project

Buy Now
Questions 132

Which of the following is included as part of the practice of Architecture Governance?

Options:

A.

Interacting with the CxO level on Enterprise Architecture.

B.

Ensuring compliance with standards and regulatory obligations.

C.

Creating and maintaining the Statement of Architecture Work throughout the ADM cycle.

D.

Managing stakeholders, their concerns, and their requirements.

Buy Now
Questions 133

Complete the sentence. According to TOGAF, all the following are responsibilities of an Architecture Board, except ______________________.

Options:

A.

Allocating resources for architecture projects

B.

Decision making for changes in the architecture

C.

Enforcing Architecture Compliance

D.

Improving the maturity of the organization ' s architecture discipline

E.

Production of governance materials

Buy Now
Questions 134

The Requirements Management Phase is responsible for which one of the following activities?

Options:

A.

Addressing requirements

B.

Disposal of resolved requirements

C.

Generating requirements

D.

Managing the flow of requirements

E.

Prioritizing requirements

Buy Now
Questions 135

Which section of the TOGAF document describes the processes, skills and roles to establish and operate an architecture function within an enterprise?

Options:

A.

Part II: Architecture Development Method

B.

Part III: ADM Guidelines and Techniques

C.

Part IV: Architecture Content Framework

D.

Part VI: TOGAF Reference Models

E.

Part VII: Architecture Capability Framework

Buy Now
Exam Code: OG0-093
Exam Name: TOGAF 9.2 Combined Part 1 and Part 2
Last Update: Jun 24, 2026
Questions: 453
$64.99  $185.69
$49.99  $142.83
$54.99  $157.11
buy now OG0-093