Labour Day Sale - Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 575363r9

Welcome To DumpsPedia

210-010 Sample Questions Answers

Questions 4

During a Vblock System 200 deployment, a single server did not power on and a replacement has been received.

Which management interface is used to prepare the server for installation?

Options:

A.

vSphere

B.

CIMC

C.

Unisphere

D.

UCSM

Buy Now
Questions 5

On which operating system is the EMC Ionix UIM/P virtual appliance based?

Options:

A.

Red Hat Linux

B.

SUSE Linux

C.

CentOS Linux

D.

Debian Linux

Buy Now
Questions 6

A host is a member of a high availability (HA) cluster in vCenter. There is a failure of a B-series blade in a Vblock System 720.

What are three ways that vCenter is impacted? (Choose three.)

Options:

A.

vCenter will recognize the host's absence and high availability will restart the virtual machines on the remaining hosts depending on resource constraints.

B.

The vCenter virtual machine will restart on another available host, there will be no impact to production data on the Vblock.

C.

vCenter will use Distributed Resource Scheduling (DRS) to vMotion virtual machines based on the reduced resources available.

D.

The outage will require remediation to restore vCenter functionality.

E.

The amount of resources available to the cluster will be reduced until the outage is restored.

Buy Now
Questions 7

A Cisco Unified Computing System (UCS) blade encounters a hardware failure that requires the service profile to be associated to another blade.

Once the service profile is associated to another blade, how does the host boot the existing operating system?

Options:

A.

The service profile maintains pointers to the local hard drives on the failed blade allowing true stateless migration.

B.

The service profile maintains the boot-policy to ensure the replacement blade boots to the existing LUN on the storage array.

C.

The service profile migrates the hard drive content from the failed blade to the new blade during service profile re-assignment.

D.

The service profile migration requires that the drives from the failed blade are physically migrated to the replacement blade to boot the existing operating system.

Buy Now
Questions 8

What is the boot LUN size for an ESXi installation on a Vblock System 320?

Options:

A.

10 GB

B.

20 GB

C.

40 GB

D.

60 GB

Buy Now
Questions 9

On a Vblock System 720, what is the VCE supported tool used to manage a storage array?

Options:

A.

Unisphere for VMAX

B.

Ionix ControlCenter

C.

Symmetrix System Viewer

D.

Symmetrix Management Console

Buy Now
Questions 10

In Cisco UCS, what is a valid format of a vHBA World Wide Port Name?

Options:

A.

20:00:00:25:B5:01:0B:01

B.

2000:0025:B501:0B01

C.

20-00-00-25-B5-01-0B-01

D.

20.00.00.25.B5.01.0B.01

Buy Now
Questions 11

Where does a system administrator configure virtual machine affinity rules in VMware vCenter?

Options:

A.

HA settings

B.

DPM settings

C.

virtual machine settings

D.

DRS settings

Buy Now
Questions 12

Which Cisco Catalyst switch is used for network management on a Vblock System 200?

Options:

A.

Cisco Catalyst 2960

B.

Cisco Catalyst 3560

C.

Cisco Catalyst 3750

D.

Cisco Catalyst 4500

Buy Now
Questions 13

Which two statements are correct about Vblock System Release Certification Matrix (RCM) upgrades? (Choose two.)

Options:

A.

The RCM must be applied by VCE certified resources.

B.

When upgrading to a new RCM, all components may not require an upgrade.

C.

The most recent RCM version must be applied.

D.

An addendum to the RCM may be issued to address a bug or software issue.

Buy Now
Questions 14

A Vblock System 720 has been configured in the factory according to the VCE Logical Build Guide.

Which statement is correct?

Options:

A.

Each service-profile should have at least one vNIC pinned to fabric interconnect A; one vNIC pinned to fabric interconnect B, and failover enabled.

B.

Each service-profile should have at least one vNIC pinned to fabric interconnect A; one vNIC pinned to fabric interconnect B, and failover disabled.

C.

Each service-profile should have at least one vHBA pinned to fabric interconnect A; one vHBA pinned to fabric interconnect B, and failover enabled.

D.

Each service-profile should have at least one vHBA pinned to fabric interconnect A; one vHBA pinned to fabric interconnect B, and failover disabled.

Buy Now
Questions 15

Your manager asks you to configure an external Syslog on VMware ESXi hosts.

In which two ways would the Syslog be configured? (Choose two.)

Options:

A.

using the vSphere client

B.

using the esxcli system syslog command

C.

using VMware Update Manager

D.

using the VMware SQL database

Buy Now
Questions 16

A customer uses EMC's Unified Infrastructure Manager (UIM) to deploy a Vblock System.

Which two post-deployment steps must the engineer take within Unified Computing System Manager (UCSM) to provide a VCE best-practice configuration? (Choose two.)

Options:

A.

Set the Fibre Channel QoS policy in service profiles.

B.

Set the host firmware package in service profiles.

C.

Associate the service profiles to blades

D.

Set enable failover for vNICs in service profiles.

Buy Now
Questions 17

Which Cisco switch provides IP connectivity for the Vblock System 320?

Options:

A.

Cisco Nexus 5548UP

B.

Cisco Catalyst 3750-X

C.

Cisco MDS 9148

D.

Cisco Nexus 2248TP

Buy Now
Questions 18

A SAN administrator must use the zone commit command to activate a zone set on a Cisco MDS 9148.

Which feature is enabled on the switch?

Options:

A.

hardware zoning by access control lists

B.

enhanced zoning

C.

extended broadcast zoning

D.

basic zoning

Buy Now
Questions 19

A customer would like to add a new production VLAN to their Vblock System with UIM/P. The VLAN was added to the UIM/P service profile, and the connected Cisco Nexus 5000. The customer is still not able to use the new VLAN with a virtual machine.

Which step must the customer complete?

Options:

A.

Create a new VSAN.

B.

Add the VLAN to Cisco Nexus 1000V.

C.

Add the VLAN to Cisco Catalyst 3560.

D.

Disable spanning tree on UCS.

Buy Now
Exam Code: 210-010
Exam Name: VCE Vblock™ Systems Deployment and Implementation - Core Exam
Last Update: May 1, 2024
Questions: 128
$64  $159.99
$48  $119.99
$40  $99.99
buy now 210-010