There is evidence to suggest that environments with poor acoustics may lead to an increase in which of the following health impacts?
Which of the following strategies is appropriate for meeting Feature L09 when providing supplemental lighting on occupant request?
An Environment. Health and Safety (EHS) manager finds that an quality at an indoor construction site is degrading because the contractors are demolishing wooden boards Which stop should the manager lake first to address this problem?
Which of the following ongoing procedures is required for water dispensers in Feature W06?
A residential building has a small atrium. Which of the following should the WELL AP recommend to contribute toward Feature M07: Restorative Spaces?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How many workstations need to be height-adjustable to satisfy the requirements of the preconditions?
Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by
A project team has completed the stakeholder charrette and created a plan detailing the project's health-oriented mission prior to construction. What must the team do upon project completion for Feature C02: Integrative Design?
Which of the following layouts would meet the requirements to provide enough exposure to meet the precondition in Light?
A WELL AP is creating a pest management plan based upon integrated pest management (IPM) principles. What is the most effective strategy to minimize the use of pesticides?
A primary school principal would like to Improve the fitness of primary school students. Which of the following suggestions should the WELL AP recommend to also most a WELL feature?
In an office building where all of the occupants are under the age of 65 years, which of the following illuminance levels meets the requirements for the office area?
An office building has installed water dispensers. At a minimum, how often should the mouth pieces, protective guards, and collective basins be cleaned?
Which of the following must be provided to all eligible employees within a WELL Certified Building?
According to Feature: T04 Individual Thermal Control, which of the following is an effective strategy for improving individual thermal comfort in a given space?
A project team conducts a daylight simulation for an office building and the result is slightly lower than the daylight simulation requirement of sDA300,50%. The window locations can no longer be changed. Which of the following strategies can be pursued to help meet the daylight simulation requirement?
A WELL AP is communicating the recertification requirements to the project owner. Which is the best strategy to simplify the process?
Which of the following describes the effects of insufficient illumination during the day and light exposure during the early night?
Which of the following hazardous materials have been restricted for use in paints in many countries?
A WELL v2™ project received their performance verification test results back and found that their water exceeded the allowed threshold of microorganisms. Which strategy should the WELL AP take to help the project continue pursuing certification?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
The project team is deciding how much effort to put into the redesign of the existing staircase located immediately adjacent to the main point of entry of the building, which services all floors of the project. Which of the following design strategies should the WELL AP suggest to earn the project team the maximum number of points within Feature V03: Circulation Network?
For which parameters does the WELL Building Standard™ set performance-based thresholds through Feature A01: Air Quality?
A project owner would like to raise awareness of healthy foods to their occupants. Which of the following strategies will also help fulfil a WELL feature?
According to Feature M02: Nature and Place, what is one way to include design elements that provide a connection to place?
The food service manager for a corporate headquarters office building is asked to explore alternative sources of food that would meet the requirements of the WELL Building Standard™ (WELL™). What recommendation should the WELL AP make that would help the manager meet WELL™ requirements?
Which of the following should a project team provide near the sinks within restrooms to achieve Feature W08: Hygiene Support?
The WELL project administrator realizes that a project's special circumstances do not meet the WELL features, as written. They would like to explore other means of compliance and cannot find a similar situation in the official International WELL Building Institute™ (IWBI™) guidelines. What should the project administrator do next?
The WELL AP notices mold and fungal growth on some indoor walls and ceilings of enclosed regularly occupied spaces. Which of the following is the most likely cause of the mold and fungal growth?
Which of the following strategies can be used to improve the visual balance in a workspace?
A project team is pursuing Feature A08 Air Quality Monitoring and Awareness The installed air quality monitor density should at least be one sensor per
A)
B)
C)
D)
The design team for a new office building protect is trying to achieve a point for Feature X08 Materials Optimization by selecting materials with enhanced chemical restrictions. They are preparing a list of products to submit to the owner for approval All of the selected products are inventoried to 100 parts per million (ppm). Which of the following products should the design team give priority to in order to achieve this point?
Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their
primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its
employee benefits and organizational policies. As an example, they offer a 50% discount on several
mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Based on the supplied information, the project would contribute to Feature M07 Restorative Spaces if they offered access to which of the following?
The facilities management team of a project has ordered a cleaning product that can harm occupants' health. A review of the documentation shows that the team members were unaware of the cleaning plan at the time of the purchase. What is the most likely cause of the misunderstanding?
A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature. Which of the following should the team implement?
In Feature A11: Source Separation, to isolate indoor pollution sources, which of the following spaces would need to have all air exhausted so that it is expelled rather than recirculated?
Which of the following chemicals can be added to the public water supply to act as a disinfectant?
indoor air tests for a project show high levels of carbon monoxide and nitrogen dioxide. This indicates the presence of which of the following"?
Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?
To support meal preparation for occupants in an office building, which of the following strategies should the design team include for employees to meet Feature N10: Food Preparation?
A WELL AP is reviewing a client's waste management plan for Feature X09: Waste Management. Which key requirement must be confirmed?
A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?
What should the minimum size be for a restorative space in a project with 30 regular occupants to comply with Feature M07: Restorative Spaces?
An organic coffee shop would like to establish an internal policy to support healthy working hours for staff to meet Feature M06: Restorative Opportunities. Which of the following strategies should be addressed?
A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.
To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?
A small family-run business owned by an accredited nutritionist has noticed an increase in the number of processed foods brought in by employees for lunch. Which strategy could the WELL AP recommend at no additional cost to the client to meet the requirements of Feature N07 Nutrition Education?
A project registered under WELL Core Certification has a total area of 100.000 ft3 (9 290 m2). What is the minimum of the total building floor area that should be available tor performance testing?
A)
B)
C)
D)
Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?
A financial service office is undergoing renovation and would like to provide nature access to its employees. Which of the following should the design loam include for regular occupants to access to moot Feature MO9 Enhanced Access to Nature?
Which of the following ingredients is restricted in building products such as ceilings, wall panels, insulation products, furniture and millwork in Feature: X05 Enhanced Material Restrictions?
At what stage are documents created that represent policies and operations schedules that are planned to be implemented?
Occupants of a WELL Certified building are unfamiliar with WELL. Which of the following strategies would best meet Feature C01: Health and Well-being Promotion and promote a greater understanding of the relationship between health and buildings among occupants?
A project team is working to certify an existing space and is preparing for a stakeholder charrette. What should the WELL AP remind the facilitator to do early in the planning process to comply with Feature C02: Integrative Design?
A WELL AP is reviewing a zoning layout for a new WELL commercial fit-out project. Which of the following spaces should be labeled as acoustically quiet zones?
Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?
Which of the following performance testing results is compliant with the requirements of the WELL Building Standard's Water concept?
A total of 20 varieties of beverages are sold on a daily basis in a WELL Certified building Which of the following, strategies could have boon implemented in the non-based spaces of this building (o comply with Feature N03 Refined Ingredients?