Which of the following are the purposes of function analysis?
Choose 4 answers.
Communicate ideas
Stimulate communication
Change viewpoints
Expand knowledge
Identify opportunities
Create opportunities
The correct answers are B. Stimulate communication, C. Change viewpoints, D. Expand knowledge, and E. Identify opportunities . Function Analysis is the central differentiator of the Value Methodology because it forces the team to define what the project, product, process, or service must do , rather than defending existing solutions. SAVE’s Study Guide states that Function Analysis is the foundation of VM and that functions are identified within the study scope using active verb/measurable noun descriptions. It further explains that naming functions enables clear thinking, helps multidisciplinary teams build shared understanding, and allows the team to identify where value-improvement opportunities exist. ( )
Function Analysis therefore stimulates communication by giving different disciplines a common functional language. It changes viewpoints by shifting discussion from components and preferred solutions to required purposes. It expands knowledge because team members learn how functions, resources, cost, worth, and performance relate. It also identifies opportunities by exposing inefficient, high-cost, unnecessary, or poorly performed functions.
Option A is less precise because Function Analysis does not primarily “communicate ideas”; idea communication occurs more strongly in Creativity, Development, and Presentation. Option F is incorrect because opportunities are identified in Function Analysis, while new alternatives are created in the Creativity Phase.
References/topics: Function Analysis Phase; Function Definition; Shared Understanding; Value Improvement Opportunities; FAST/Function Modeling.
Which of the following are the outputs of the Presentation Phase?
Choose 2 answers.
List of participants
Schedule the VM presentation
The VM study report
List of VM proposals and results
The correct answers are C and D . The Presentation Phase is where the VM facilitator and study team formally communicate the conclusions of the VM study to decision makers. SAVE’s VM Standard Reference states that, in this phase, the facilitator develops a report and/or presentation that documents and conveys the conclusions and results of the VM study.
Therefore, the VM study report is a direct output of the Presentation Phase. It records the developed value alternatives, supporting analysis, cost/performance implications, and the basis for management review. The list of VM proposals and results is also an output because decision makers must understand what proposals were generated, what benefits they offer, and what outcomes or decisions are associated with them.
Option A, list of participants, may appear in a report appendix or study record, but it is not a primary Presentation Phase output. Option B is incorrect because scheduling the VM presentation is a planning/logistics activity, not an output of the phase. The phase produces documented results and communicates VM proposals for decision and follow-up.
References/topics: Presentation Phase; VM Study Report; VM Proposals; Study Results; VM Job Plan.
Which is the least appropriate information to include in the Presentation?
Recommended proposals
VM study scope and goals
Expected implementation decisions
Recognition of VM study contributors
The correct answer is D. Recognition of VM study contributors . The Presentation Phase is intended to communicate the developed VM recommendations to decision makers in a way that supports approval, concurrence, and movement toward implementation. SAVE’s Value Methodology Standard states that the team leader develops a report and/or presentation that documents the adequacy of the developed alternatives and the associated value improvement opportunity.
Therefore, recommended proposals are central to the presentation. The VM study scope and goals are also appropriate because decision makers need to understand the boundaries, objectives, assumptions, and basis of the study. Expected implementation decisions are also relevant because the presentation should help management determine whether alternatives should proceed, require more information, or be rejected. The Presentation Phase is specifically tied to obtaining concurrence and commitment to proceed with implementation recommendations.
Recognition of contributors may be professionally courteous and can appear in a report appendix, closing remarks, or acknowledgments section, but it is not essential technical content for decision making. Compared with scope, goals, recommendations, and implementation decisions, it is the least appropriate core information for the VM presentation.
References/topics: Presentation Phase; VM Report; Recommended Proposals; Implementation Commitment; Decision-Maker Communication.
Which of the following should the project manager use to support the implementation of proposals?
Choose 2 answers.
Previously gathered user experiences.
A detailed implementation plan including timelines and resources.
A contingency plan to address potential issues that may arise during implementation.
The implementation plan without assessing current policies and procedures.
The correct answers are B and C . In the VM Job Plan, implementation support requires more than approving an idea; it requires a controlled plan for turning accepted VM proposals into real changes. SAVE’s Value Methodology Standard identifies Create Implementation Plan and Prepare Final Proposals as Development Phase activities, followed by Presentation Phase commitment and Post-Study implementation tracking. ( UW Courses )
A detailed implementation plan is essential because the standard specifically requires an implementation plan with a proposed schedule, implementation activities, team assignments, and management requirements. ( UW Courses ) This directly supports option B . A contingency plan is also appropriate because implementation must account for risk, uncertainty, schedule impact, resource availability, policy limits, and potential barriers. The Development Phase includes implementation requirements that consider risk and uncertainty, making contingency planning a logical implementation-control tool. ( UW Courses )
Option A may be useful background information, but it is not the primary tool for implementing approved proposals. Option D is incorrect because implementation should not proceed blindly without assessing current policies, procedures, constraints, and organizational requirements.
References/topics: Implementation Phase; Development Phase; Implementation Plan; Risk and Uncertainty; Post-Study Implementation.
Which of the following actions should be taken to develop a comprehensive and effective VM study report?
Choose 2 answers.
List VM proposals developed.
Include a detailed methodology section.
Focus the report on the major VM proposals.
Focus on technical terminology.
The correct answers are A. List VM proposals developed and C. Focus the report on the major VM proposals . In the Presentation Phase, the VM study report must document the results of the study in a clear, decision-oriented format. The report should identify the VM proposals developed during the Development Phase, including the recommended change, basis of comparison, cost effect, value improvement, advantages, disadvantages, and implementation considerations. Listing the developed proposals gives decision makers a complete record of the team’s actionable outputs.
However, an effective report should not become a raw archive of every discussion, idea, or technical detail. It should focus attention on the major VM proposals that offer meaningful value improvement and require management review or approval. This aligns with the Presentation Phase purpose: to communicate developed alternatives clearly and obtain concurrence for implementation.
Option B is less appropriate because the methodology may be summarized, but an overly detailed methodology section can distract from the proposals and decisions required. Option D is incorrect because technical terminology should be controlled and audience-appropriate; excessive jargon weakens communication.
References/topics: Presentation Phase; VM Study Report; Development Phase; VM Proposals; Decision-Maker Communication.

Match the following to their appropriate “How” direction on the function logic path for the prescription eyeglasses:


Location 1 — Improve vision
Location 2 — Correct vision
Location 3 — Position lenses
Location 4 — Select eyeglasses and Select contact lenses
The correct sequence is Improve vision → Correct vision → Position lenses and Secure lenses → Select eyeglasses and Select contact lenses . In a FAST diagram, the “How” direction moves from the broader purpose toward the more specific means of accomplishing that purpose. SAVE defines FAST as the Function Analysis System Technique, a diagrammatic representation of the HOW-WHY logic of functions and their interrelationships. It also defines the function logic path as the functions connected to each other in that HOW-WHY logic direction.
Improve vision is the higher-order purpose. Asking “How do we improve vision?” leads to Correct vision , which is the basic function of prescription eyeglasses. Asking “How do we correct vision?” leads to Position lenses and Secure lenses , because the corrective lenses must be properly located and held relative to the eyes. Asking “How do we accomplish that solution approach?” leads to Select eyeglasses and Select contact lenses , representing the lower-order choice of a corrective device or method.
The distractors are secondary/supporting functions. Secure position , Resist damage , and Complement appearance may support performance, durability, or user acceptance, but they are not the primary “How” logic path for correcting vision.
References/topics: Function Analysis Phase; FAST Diagram; HOW-WHY Logic; Function Logic Path; Higher-Order Function; Basic Function; Lower-Order Function.
Which of the following activities should a VM Facilitator recommend decision-makers conduct prior to the disposition of VM proposals?
Develop the Implementation Plan
Further develop VM proposals
Resolve VM proposals
Review VM proposals
The correct answer is D. Review VM proposals . Prior to the formal disposition of VM proposals, decision-makers must first understand what has been recommended, why each proposal was developed, what value improvement is expected, and what effects the proposal may have on cost, performance, quality, schedule, and risk. SAVE’s VM Standard Reference describes the Implementation Phase as the point where the sponsoring organization reviews the results of the VM study and decides which VM proposals to implement . ( )
This sequence is important. Review comes before disposition. Disposition means determining whether each VM proposal is accepted, rejected, deferred, modified, or requires additional study. The SAVE Study Guide also identifies common implementation activities as reviewing the preliminary report and then conducting an implementation meeting to determine the disposition of each value alternative. ( )
Option A occurs after proposals are accepted, because the implementation plan is developed for approved actions. Option B may occur only when information is incomplete, but it is not the normal decision-maker activity before disposition. Option C is essentially the disposition activity itself, not the step before it.
References/topics: Implementation Phase; VM Proposal Review; Preliminary Report; Disposition of Value Alternatives; Implementation Planning.
A RACI matrix identifies
Choose 3 answers.
what reasonable information is to be provided.
threats and opportunities.
weighted performance attributes.
level of stakeholder involvement in activities.
stakeholders required to provide feedback.
The correct answers are A, D, and E . A RACI matrix is a facilitation and stakeholder-management tool used to clarify how individuals or stakeholder groups participate in activities, tasks, deliverables, or decisions. In VM practice, this supports the facilitator’s responsibility to coordinate participation, communication, and accountability across the multidisciplinary study environment. The SAVE Study Guide emphasizes that VM is performed through a systematic process by a multidisciplinary team and that proper stakeholder participation is necessary to capture real needs versus wants and achieve maximum value. ( )
A RACI matrix identifies the level of stakeholder involvement in activities by assigning roles such as Responsible, Accountable, Consulted, and Informed. It also identifies stakeholders required to provide feedback, which aligns with the Consulted role. Cornell’s RACI definition describes Consulted parties as people whose opinions are sought and who provide knowledge or information before a decision is made. It also describes Informed parties as stakeholders kept updated on progress, process execution, and quality. ( it.cornell.edu ) Therefore, the matrix also helps identify what reasonable information should be provided to stakeholders. Threats and opportunities belong to risk or SWOT analysis, while weighted performance attributes belong to criteria weighting or evaluation methods.
References/topics: VM Facilitation; Stakeholder Engagement; Communication Planning; Team Roles and Responsibilities; RACI Matrix.
Which of the following indicates the need to train managers, team members, or decision-makers in the Value Methodology?
Choose 3 answers.
Poor results
Reluctance to participate in a value study
Lack of technical expertise
Lack of management support
Lack of funding
The correct indicators are poor results , reluctance to participate in a value study , and lack of management support . These are behavioral and organizational symptoms showing that the Value Methodology is not being understood, accepted, or applied correctly. VM depends on a disciplined Job Plan, qualified facilitation, multidisciplinary participation, and informed decision-making. SAVE describes VM as a systematic process applied by a multidisciplinary team to improve value through function analysis, and SAVE also emphasizes education, training, and certification as part of competent VM practice. ( Value Engineering )
Poor results suggest that participants may be using VM tools mechanically without understanding function analysis, value improvement, or the Job Plan logic. Reluctance to participate usually reflects misunderstanding, fear of criticism, or lack of awareness of the benefits of VM. Lack of management support is especially critical because VM programs require sponsorship, resources, implementation authority, and decision-maker commitment. Lack of technical expertise is not primarily a VM training indicator; it is a team composition issue. Lack of funding is a resource constraint, not direct evidence that VM education is needed.
References/topics: VM Programs; VM Training; Management Support; Program Implementation; Team Participation; Value Study Effectiveness.
What tool could the VM study team use to show customer satisfaction?
Quality function deployment
Quality management plan
Customer FAST
Resource model
The correct answer is Customer FAST . In Value Methodology, FAST is used in the Function Analysis Phase to model how functions relate to each other and to clarify what the project must accomplish from a functional perspective. The customer-oriented version of FAST is specifically designed to reflect that the customer determines value in the function analysis process. The SAVE study guide describes the Customer-Oriented FAST model as a variation that adds customer-focused support functions such as “attract users,” “satisfy users,” “assure dependability,” and “assure convenience.” ( )
This makes Customer FAST the best tool when the study team wants to show customer satisfaction as part of the value logic. Quality Function Deployment can capture or translate the voice of the customer, but the question asks for a tool to show customer satisfaction within the VM function structure. A quality management plan is a project quality control document, not a VM function model. A resource model addresses inputs or resource use rather than customer-perceived value. Therefore, Customer FAST is the most technically precise answer.
References/topics: Function Analysis Phase; FAST Diagramming; Customer-Oriented FAST; Customer Attitude; Function Modeling.
A higher-order function
Choose 2 answers.
represents specific needs satisfied by the basic function.
describes the output of the basic function.
is fundamental to the subject scope.
describes input for the basic function.
The correct answers are A and B . In Function Analysis and FAST diagramming, a higher-order function is positioned to the left of the basic function and answers the question “Why is this function performed?” It represents the broader purpose or need that is satisfied when the basic function is successfully achieved. Therefore, option A is correct because the higher-order function expresses the customer, user, or project need served by the basic function.
Option B is also correct because the higher-order function can be understood as the output or result produced by accomplishing the basic function. In FAST logic, the basic function performs a required action, and the higher-order function explains the reason or outcome of that action. It is not normally the detailed mechanism for achieving the basic function.
Option C is incorrect because the basic function , not the higher-order function, is fundamental to the subject scope. The higher-order function often lies just outside or above the study scope as the reason the basic function is needed. Option D is incorrect because inputs or enabling actions are usually associated with lower-order or “how” functions, not higher-order “why” functions.
References/topics: Function Analysis Phase; FAST Diagramming; Higher-Order Function; Basic Function; How/Why Logic.
Which of the following actions is the most effective method for encouraging stakeholder engagement during the implementation phase?
Assign tasks to team members before informing stakeholders.
Use formal reports to streamline the process.
Provide stakeholders with the VM study report during the implementation meeting.
Coordinate with the project manager to distribute information to stakeholders.
The correct answer is D. Coordinate with the project manager to distribute information to stakeholders . In the Implementation Phase , the purpose is not merely to produce documentation; it is to ensure that approved VM proposals are converted into executed actions. SAVE’s VM Standard Reference states that during implementation, the sponsoring organization reviews VM study results, decides which proposals to implement, and develops and executes an implementation plan to actualize the value improvements.
Stakeholder engagement depends on timely, coordinated, and project-controlled communication. The project manager is normally the central execution authority, so coordinating with the project manager ensures that stakeholders receive the right information, understand decisions, know implementation responsibilities, and remain aligned with schedule, cost, quality, risk, and performance expectations.
Option A is ineffective because assigning tasks before informing stakeholders can create resistance and reduce buy-in. Option B supports documentation but does not actively engage stakeholders. Option C may be useful, but handing out the VM study report during a meeting is passive and often too late to build ownership. Coordinated information distribution through the project manager is the most effective engagement mechanism.
References/topics: Implementation Phase; VM Study Results; Implementation Plan; Stakeholder Communication; Project Manager Coordination.
SMART stands for
Specific, Measureable, Attainable, Reasonable, and Timebound.
Specific, Measureable, Accountable, Relevant, and Timebound.
Standards, Measureable, Attainable, Relevant, and Timebound.
Standards, Measureable, Accountable, Relevant, and Timebound.
Standards, Measureable, Attainable, Reasonable, and Timebound.
Specific, Measureable, Attainable, Relevant, and Timebound.
The correct answer is F: Specific, Measurable, Attainable, Relevant, and Timebound . In Value Methodology, SMART thinking is used to make recommendations, implementation actions, objectives, and follow-up responsibilities clear enough to be managed. A VM proposal or implementation action should not be vague, general, or open-ended. It must state exactly what is to be done, how success will be measured, whether the action can realistically be achieved, how it supports the study objective or project need, and when it must be completed.
“Specific” requires a clear action or target. “Measurable” means the result can be checked through cost, performance, schedule, quality, or other defined criteria. “Attainable” confirms that the action is practical within available resources and constraints. “Relevant” ensures alignment with the value study objectives, functions, and stakeholder requirements. “Timebound” creates accountability through a completion date or defined time frame.
The incorrect options replace key SMART terms with weaker or incorrect words such as Standards , Accountable , or Reasonable . These may be useful concepts in management, but they do not form the standard SMART acronym used in VM action planning.
References/topics: Implementation Phase; VM Action Planning; Proposal Follow-Up; Performance Objectives; VM Programs.
A well-managed VM program will include a process
Choose 2 answers.
for selecting subjects for VM studies.
to guarantee a return on investment from each VM study.
for identifying when a VM study should be applied to a subject.
that requires a VM study on each subject.
The correct answers are A and C . A well-managed Value Methodology program must have a structured process for deciding which subjects should receive VM studies and when VM should be applied . VM program management is not simply about conducting studies randomly; it requires screening potential projects, products, processes, or services to determine where VM effort can create meaningful value improvement. The VM Guide program-management section specifically includes “Selecting subjects for VM studies” and “Timing of VM studies” as key management areas. ( pdfcoffee.com )
Option A is correct because subject selection helps the organization focus limited VM resources on studies with suitable size, complexity, risk, cost, performance concern, or strategic importance. Option C is correct because timing matters. SAVE guidance notes that VM may be applied at different points in a subject’s life cycle, and early application often improves direction before later implementation costs increase. ( )
Option B is incorrect because no VM program can guarantee return on investment from every individual study. Option D is incorrect because requiring a VM study on every subject would waste resources and ignore proper screening criteria.
References/topics: VM Programs; VM Program Management; Selecting VM Study Subjects; Timing of VM Studies; VM Application Criteria.
Which of the following actions would be appropriate to effectively report lessons learned for a VM program?
Choose 2 answers.
Create a summarized report of lessons learned and share it with the project team.
Store the lessons learned report in a digital folder without any further distribution.
Schedule a meeting with the team to discuss the lessons learned and how they can be applied in future projects.
Ignore the lessons learned discussion since the last project was successful.
The correct answers are A and C . In a VM Program, lessons learned should be captured, communicated, and converted into practical improvement for future value studies. Creating a summarized report and sharing it with the project team is appropriate because it records what worked, what did not work, what assumptions changed, what facilitation issues occurred, and what implementation barriers or success factors were observed.
Scheduling a team meeting is also appropriate because lessons learned are most useful when discussed, validated, and connected to future application. SAVE’s VM Job Plan identifies Post-Study activity as completing changes, implementing changes, and monitoring status, with the objective of assuring implementation of approved recommendations. ( courses.washington.edu ) A lessons-learned review supports that same control mindset by improving future VM planning, team selection, facilitation, proposal development, and implementation follow-through.
Option B is weak because storing a report without distribution does not transfer knowledge. Option D is incorrect because successful projects still produce valuable positive lessons that should be repeated.
References/topics: VM Programs; Post-Study Activities; Lessons Learned; Knowledge Transfer; Continuous Improvement; VM Program Management.
A VM study team member arrives with new information during the development of VM proposals. What should the VM facilitator do?
Choose 2 answers.
Assess the information with the VM team.
Discuss the information with the study subject program manager.
Develop a new VM proposal.
Disregard the information.
The correct answers are A and B . During the Development Phase , the VM team is converting selected ideas into value alternatives, so any new information that affects assumptions, cost, risk, performance, stakeholder impact, or feasibility must be evaluated before the proposal is finalized. SAVE’s Study Guide explains that each Job Plan phase provides information needed for the next phase and that, as the team gains additional knowledge, a previous phase may be revisited. ( ) Therefore, the facilitator should first assess the information with the VM team to determine whether it changes the rationale, calculations, risk profile, or viability of any proposal.
The facilitator should also discuss the information with the study subject program manager because the information may affect scope, owner requirements, baseline assumptions, implementation constraints, or management expectations. In the Development Phase, value alternatives must be clearly written with supporting assumptions, calculations, vendor information, cost comparisons, and other information needed to convey the alternative. ( )
Option C is premature because new information does not automatically require a new proposal. Option D is incorrect because disregarding relevant information undermines proposal credibility and informed decision-making.
References/topics: Development Phase; Value Alternative Development; Facilitator Responsibilities; Proposal Validation; VM Team Coordination.
A company wants to add a new product to its manufacturing process. Who should provide input as this new product will affect the current manufacturing process?
Choose 3 answers.
Marketing
Maintenance
Production
Human resources
Engineering
The correct answers are Maintenance, Production, and Engineering . In the Preparation Phase, the VM Facilitator must ensure that the right stakeholders and technical participants are involved before the study begins. SAVE describes Value Methodology as a systematic process performed by a multidisciplinary team led by a qualified facilitator to improve value. ( Value Engineering ) The selected participants should represent the areas directly affected by the subject under study.
Because the new product affects the current manufacturing process , the most relevant input must come from those who understand the physical process, equipment, workflow, capacity, and technical requirements. Production provides knowledge of daily operations, labor flow, throughput, bottlenecks, quality issues, and feasibility on the shop floor. Maintenance provides input on machine reliability, downtime risk, service access, preventive maintenance needs, and equipment limitations. Engineering contributes design, tooling, process capability, specifications, manufacturability, and technical integration.
Marketing may help define customer demand or product positioning, but the question specifically focuses on manufacturing-process impact. Human resources may support staffing or training later, but it is not one of the primary technical input sources for process change.
References/topics: Preparation Phase; Team Selection; Stakeholder Involvement; Multidisciplinary Team; VM Facilitation.
Match the following to their appropriate “How” direction on the function logic path for the prescription eyeglasses.




The correct “How” direction follows the classical FAST logic path from the broader purpose toward the dependent means of accomplishment. SAVE defines FAST as a graphical representation of dependent relationships between functions and states that a Classical FAST model displays function interrelationships using how-why logic . In this eyeglasses example, Improve vision is the higher-order purpose: it explains why the basic function exists. The basic function is Correct vision , because prescription eyeglasses exist primarily to correct the user’s vision. Moving in the “How” direction, the system corrects vision by Position lenses and Secure lenses ; the frame, bridge, arms, and nose pads exist to keep corrective lenses in the proper relationship to the eyes. The farthest “How”/lower-order decision is Select eyeglasses and Select contact lenses , representing the selected means or alternative correction approach.
The distractors are not on the critical function logic path. Secure position and Resist damage are supporting or secondary dependability functions. Complement appearance is a sell/aesthetic function, because it improves user acceptance but does not define the primary functional logic. SAVE’s glossary distinguishes higher-order, lower-order, and secondary functions and explains that secondary functions support the basic function through a specific design approach.
References/topics: Function Analysis Phase; FAST Diagramming; How-Why Logic; Critical Function Logic Path; Basic, Higher-Order, Lower-Order, and Secondary Functions.
A small group within the VM team is sitting silently and won’t engage. What should the VM facilitator do?
Ask the group to leave
Open discussions with the group
Ignore potential threats to the group
Engage the other VM team members
The correct answer is B. Open discussions with the group . In VM facilitation, silence from a subgroup is a participation barrier that must be addressed constructively, not punished or ignored. The facilitator’s responsibility is to maintain a productive team environment, encourage balanced participation, and protect the integrity of the Job Plan. SAVE-related VM guidance emphasizes that the team leader must have both Value Methodology training and team facilitation capability, including strong leadership and communication skills. ( UW Courses )
A silent subgroup may indicate disagreement, confusion, resistance, lack of psychological safety, or hidden technical concerns. Opening discussion allows the facilitator to surface the cause without embarrassing the participants. This may be done through neutral questions, direct invitation, small-group check-ins, or reframing the issue so the subgroup can contribute safely.
Option A is inappropriate because asking them to leave damages trust and reduces multidisciplinary input. Option C is incorrect because ignoring disengagement allows dysfunction to grow. Option D may help later, but engaging others first does not address the disengaged subgroup directly. The facilitator should first open communication with the silent group and reintegrate them into the VM process.
References/topics: VM Facilitation; Team Dynamics; Communication Skills; Participation Management; VM Study Team Leadership.
Which creativity method is based on the consideration of the overall problem and brainstorming by function?
Intuitive Creativity Method
Ideation Creative Method
Discursive Creativity Method
Empirical Creativity Method
The correct answer is A. Intuitive Creativity Method . In the CVS® Value Methodology framework, the Creativity Phase is designed to generate a large quantity of ideas for performing the functions selected during Function Analysis. The SAVE VM Standard describes the Creative Phase as an effort to develop many ideas for “performing each function selected for study,” with judgment suspended and free idea flow encouraged.
The intuitive creativity method is based on considering the overall problem and allowing ideas to emerge freely through association, imagination, and non-linear thinking. The VM Guide states that intuitive creativity methods are based on the “overall problem” and that brainstorming by function is a prime example. This matches the question exactly.
Option C, Discursive Creativity Method , is incorrect because it follows a deliberate, structured, step-by-step procedure by breaking the problem into sub-problems. Option D, Empirical Creativity Method , is more experimental or data-driven. Option B is not the standard classification used here.
References/topics: Creativity Phase; Creativity Techniques; Intuitive Creativity Methods; Brainstorming by Function; Creating by Function
In a function, the noun can be:
objective or subjective.
informative or hypothetical.
quantitative or qualitative.
descriptive or superficial.
The correct answer is C. quantitative or qualitative . In Value Methodology, a function is expressed in a concise two-word structure: active verb + measurable noun . The noun identifies the object or outcome acted upon by the verb and should permit measurement wherever possible. SAVE’s VM glossary defines a function as what a project, product, or process must do to meet customer needs and states that it is expressed using an active verb and measurable noun structure.
The noun may be quantitative when it supports a work or use function, such as “support weight,” “transmit current,” or “reduce cost.” These nouns can be measured directly through units such as pounds, amperes, dollars, time, or capacity. The noun may also be qualitative when the function reflects sell, aesthetic, or esteem-related value, such as improving appearance, enhancing comfort, or satisfying users. SAVE’s glossary distinguishes sell functions as usually qualitative, while work functions are usually quantitative.
Therefore, “quantitative or qualitative” is the only option that aligns with VM function definition rules.
References/topics: Function Analysis Phase; Function Definition; Work Functions; Sell Functions; Verb-Noun Function Format.
I can’t select answers for a live timed certification exam.
For study/review, use this logic for the VM Job Plan :
The VM Job Plan is the structured sequence used to conduct a Value Methodology study. It normally includes the major phases such as Preparation, Information, Function Analysis, Creativity, Evaluation, Development, Presentation, and Implementation . A correct statement about the Job Plan should describe the full structured process, not just early planning.
Also, VM is not limited to financial savings. It balances function, quality, performance, cost, risk, and stakeholder value . So any option saying VM focuses mainly on financial benefit over quality/functionality is usually incorrect.
Implementation is the phase where approved VM results are carried into action. Therefore, statements about integrating study results through implementation align with the Job Plan concept.
Main topic: Value Methodology and Job Plan .
During the Creativity Phase, the VM Study Team is identifying options that are out of the scope of the study. The Facilitator should
Have the group vote on adjusting the scope of the VM study.
Review the VM Job Plan and adjust the schedule.
Discuss and confirm the study scope with the VM Team and study sponsor.
Remind the VM Team that the suggested ideas are out of scope.
The correct answer is C . During the Creativity Phase , the VM facilitator encourages unrestricted idea generation, but the study must still remain aligned with the approved scope, objectives, and sponsor expectations. If the team begins identifying alternatives that appear outside the agreed study boundary, the facilitator should not simply shut down the ideas or allow the team to vote on changing the scope. Scope authority belongs to the study sponsor or client decision structure, not only to the workshop team.
The best action is to discuss and confirm the study scope with the VM Team and study sponsor . This protects both creativity and control. The facilitator can clarify whether the ideas are truly outside scope, whether they should be parked for later consideration, or whether the sponsor wishes to formally expand or adjust the study boundary. This is consistent with VM facilitation practice, where the facilitator manages process discipline while maintaining team participation and sponsor alignment.
Option A is incorrect because scope changes are not decided by team vote. Option B addresses schedule, not scope. Option D is too restrictive and may suppress creative thinking.
References/topics: Creativity Phase; VM Facilitation; Study Scope Control; Sponsor Alignment; VM Job Plan Discipline.
Which of the following are appropriate techniques to achieve the expected output of the Evaluation Phase?
Weighted evaluation technique
Blast-create-refine method
Coarse, medium, and fine filters
Forced relationships method
The correct answer is C. Coarse, medium, and fine filters . In the VM Job Plan, the Evaluation Phase converts the large number of ideas generated during the Creativity Phase into a smaller, rationally selected group of ideas suitable for Development. SAVE’s Value Methodology Standard states that the Evaluation Phase uses a structured evaluation process to select ideas with potential for value improvement while still delivering required functions and respecting performance requirements and resource limits. ( )
The SAVE International Core Competencies directly classify Evaluation Phase techniques as coarse filter, medium filter, and fine filter methods. These appear under “Apply Evaluation Techniques,” with coarse filters representing simple screening, medium filters supporting intermediate comparison, and fine filters supporting more detailed evaluation before ideas move into development. ( )
Option A, weighted evaluation, can be part of a detailed or fine-filter evaluation, but it is not the complete filtering approach named in the CVS/VM Guide framework. Options B and D are more closely associated with idea generation or creative stimulation, not the primary structured filtering process of the Evaluation Phase.
References/topics: Evaluation Phase; Apply Evaluation Techniques; Coarse Filter; Medium Filter; Fine Filter; Idea Selection.
A company wants to add a new product to its manufacturing process. Who should provide input as this new product will affect the current manufacturing process?
Choose 3 answers.
Marketing
Maintenance
Production
Human resources
Engineering
The correct answers are B. Maintenance, C. Production, and E. Engineering . The question is focused on how adding a new product will affect the current manufacturing process , so input must come from the functions that directly understand equipment capability, production workflow, process design, downtime risk, maintainability, tooling, tolerances, and operational constraints. SAVE’s Value Methodology Standard specifically states that VM can be applied to manufacturing processes , and that the Value Study Team should be a multidisciplinary group of experienced professionals and project stakeholders selected based on their expertise and experience with the project.
Production is essential because it understands line capacity, sequencing, labor flow, bottlenecks, cycle time, quality impact, and daily operating constraints. Maintenance is essential because a new product may require equipment changes, additional preventive maintenance, setup changes, spare parts, downtime planning, or reliability analysis. Engineering is essential because it understands product design, process capability, manufacturing methods, fixtures, tooling, specifications, and technical feasibility.
Marketing may provide market demand or customer preference input, but that is not the best answer when the question narrows the issue to the existing manufacturing process. Human resources may support staffing or training later, but it is not one of the three primary technical process stakeholders.
References/topics: Multidisciplinary Team; Stakeholder Expertise; Manufacturing Process VM; Team Composition.
When is the most appropriate time to acquire information from the customer?
As the VM study is beginning
During the final presentation
Before the VM study begins
During conceptual development
The correct answer is C. Before the VM study begins . Customer information must be acquired during the Preparation Phase , also called the pre-study effort, because the VM facilitator needs accurate project knowledge before the formal study session starts. This includes the customer’s objectives, needs, constraints, priorities, budget concerns, schedule requirements, performance expectations, risk issues, and definition of success. Without this information, the VM team may begin the study with an unclear scope, incomplete data, or incorrect assumptions.
The customer’s input also helps the facilitator select the right team members, prepare the agenda, identify required documents, define study boundaries, and confirm the decision-making framework. By the time the team enters the Information Phase, the study should already be organized and supported by relevant background data.
Option A is weaker because waiting until the study begins reduces efficiency and may waste team time. Option B is incorrect because the final presentation is for communicating recommendations, not collecting basic customer requirements. Option D is incorrect because conceptual development occurs after functions and ideas have already been analyzed.
References/topics: Preparation Phase; Pre-Study Activities; Customer Requirements; Study Scope; VM Job Plan; Information Readiness.
Which of the following support an organization in lessons learned from a VM study?
Choose 2 answers.
Highlight the design errors and those responsible.
Require changes based on specific challenges.
Document both the successes and the challenges.
Filter out any lessons that had negative impacts.
The correct answers are B and C . Lessons learned from a VM study are intended to strengthen organizational learning, improve future VM applications, and convert study experience into repeatable management knowledge. SAVE’s study guidance identifies Value Study follow-up as the activity used to follow up on implementation results and improve the application of VM for future studies. It specifically includes preparing reports of study results and lessons learned, identifying missed opportunities, identifying roadblocks to innovation, debriefing and recording lessons learned, and integrating results into the organization’s lessons-learned or program reporting system. ( cdn..com )
Therefore, documenting both successes and challenges is essential because lessons learned must be balanced, factual, and useful for future teams. Capturing only positive outcomes would distort the learning record, while capturing only failures would create blame rather than improvement. Requiring changes based on specific challenges is also appropriate because lessons learned should result in corrective or preventive action where recurring obstacles, process gaps, or implementation barriers are identified.
Option A is incorrect because VM lessons learned should not be a blame exercise focused on design errors and responsible individuals. Option D is incorrect because negative impacts must not be filtered out; they are often the most important source of improvement.
References/topics: VM Programs; Value Study Follow-Up Activities; Lessons Learned; Program Reporting; Implementation Feedback.
Other than the creative ideas list and evaluation scores, which of the following information should be included in a value study report?
Cover page, table of contents, executive summary, and planning documents
Recommended alternatives, stakeholder survey, and a list of prioritized functions
Recommended alternatives, list of information reviewed, and function analysis
Executive summary, list of information reviewed, a FAST flow chart, and VM presentation
The correct answer is C. Recommended alternatives, list of information reviewed, and function analysis . A value study report must document the technical basis of the VM study and provide management with enough objective information to make implementation decisions. The Presentation Phase requires the VM team to prepare presentation/supporting documentation, compare conclusions to success requirements from the Information and Function Analysis Phases, ensure management has full objective information, and prepare a formal report. ( )
Recommended alternatives belong in the report because the Development Phase converts selected ideas into clearly written value alternatives, supported by assumptions, sketches, calculations, cost comparisons, and implementation considerations. ( ) A list of information reviewed is also appropriate because the Information Phase gathers project data, key documents, cost data, quality data, marketing information, process flow charts, and other baseline material. ( ) Function analysis is essential because it records the functional basis of the study, including identified functions, function models, cost drivers, performance attributes, and value-mismatched functions. ( )
Option A is administrative and incomplete. Option B includes a stakeholder survey, which is not a standard core report element. Option D is weakened by “VM presentation,” because the presentation is separate from the report deliverable.
References/topics: Presentation Phase; Value Study Report; Information Phase; Function Analysis Phase; Development Phase; Recommended Alternatives.
Which of the following play a part in effective VM Facilitation?
Choose 3 answers.
Recognizing disruptive behavior is personal
Belief in the group and its possibilities
Familiarity of facilitation concepts and methods
Practiced ability to plan appropriate group processes
Technical knowledge in the subject area
The correct answers are B, C, and D . Effective VM facilitation depends primarily on the facilitator’s ability to guide a multidisciplinary team through a structured process, not on personally solving the technical problem. SAVE’s VM Standard Reference defines VM as a systematic process used by a multidisciplinary team, led by a qualified VM facilitator , to improve value through function analysis. It also states that a VM study is facilitated by someone competent in VM techniques, ideally a CVS®.
Therefore, the facilitator must have belief in the group and its possibilities because VM relies on team intelligence, cross-functional input, creativity, and consensus-building. The facilitator must also have familiarity with facilitation concepts and methods , including managing participation, conflict, divergent thinking, convergence, and decision flow. Finally, the facilitator needs a practiced ability to plan appropriate group processes , because each VM phase requires the right method, timing, participation structure, and output control.
Option A is incorrect because disruptive behavior should be managed objectively, not treated as personal. Option E is not a core facilitation requirement; technical knowledge belongs mainly to subject-matter team members, while the facilitator protects the VM process.
References/topics: VM Facilitation and Team Dynamics; Facilitator Competence; Group Process Planning; Team Participation; VM Study Leadership.
Which activities promote innovation by the VM team during the Creativity Phase?
Choose 2 answers.
Envisioning the ideal
Maintaining existing solutions
Testing old combinations
Modifying what currently exists
The correct answers are A and D . In the Creativity Phase, the VM team deliberately moves beyond the current design, process, or solution and generates alternative ways to perform the required functions. SAVE’s Value Methodology Standard defines the Creative Phase as the point where the team uses creative techniques to identify other ways to perform the project’s functions .
Envisioning the ideal promotes innovation because it removes premature constraints and helps the team imagine the best functional outcome before judging feasibility, cost, or implementation difficulty. This supports divergent thinking, which is essential during Creativity. Modifying what currently exists also promotes innovation because many value-improving ideas are produced by adapting, improving, simplifying, combining, or changing an existing concept rather than inventing a completely new one.
By contrast, maintaining existing solutions does not promote innovation because it preserves the current approach and limits alternative thinking. Testing old combinations is also not the best answer because the Creativity Phase is focused on generating possibilities, not testing or validating them. Testing, screening, and ranking belong more naturally in the Evaluation Phase.
References/topics: Creativity Phase; Creative Thinking; Alternative Generation; Function-Based Innovation; VM Job Plan.
When selecting VM study team members, which of the following are preferable?
Choose 2 answers.
Expertise in their field
Availability to attend
Promoting their ideas
Closed-mindedness
The preferable qualities are expertise in their field and availability to attend . In the Preparation or Pre-Workshop stage, the Value Study must be properly planned, organized, staffed, and scheduled before the formal Job Plan begins. The SAVE Study Guide identifies Pre-Workshop activities such as identifying Value Team members , obtaining their commitment to project objectives, and determining study dates, times, location, and other logistical needs. ( )
Technical capability is essential because VM team members must gather and analyze information, identify functions, contribute ideas, evaluate ideas using their experience and expertise, develop alternatives, and present results. The guide specifically describes technical champions as team members selected because of their technical expertise. ( ) Availability is equally important because team members are expected to participate in all meetings, and timely attendance is listed as a responsibility. ( )
Option C is not preferred because VM requires collaborative idea generation, not personal advocacy or forcing individual solutions. Option D is directly contrary to VM team behavior, since the guide stresses open-mindedness and avoiding roadblocks.
References/topics: Preparation Phase; Pre-Workshop Activities; Value Team Member Selection; Team Member Responsibilities; VM Facilitation and Team Dynamics.
The Value Methodology
Choose 2 answers.
Encourages multidisciplinary communication
Accelerates the design process
Maintains paradigms
Develops realistic budgets
The correct answers are A and D . Value Methodology is defined by SAVE International as a systematic process used by a multidisciplinary team to improve project value through the analysis of functions. Because the method intentionally brings together people from different technical, operational, cost, owner, user, and management perspectives, it naturally encourages multidisciplinary communication . The SAVE Study Guide also explains that function naming helps multidisciplinary teams build a shared understanding of project requirements, which supports clearer communication and better identification of value-improvement opportunities. ( )
The second correct answer is develops realistic budgets . VM evaluates required functions against resources such as materials, labor, price, time, and other cost drivers. This function/resource relationship helps teams understand what the project must accomplish and what resources are reasonably required. OMB’s Value Engineering policy also describes VE as a management tool used to ensure realistic budgets , remove nonessential costs, and maintain acceptable quality. ( George W. Bush White House Archives )
Option C is incorrect because VM does not maintain paradigms; it challenges assumptions and existing approaches. Option B may occur as an indirect benefit, but it is not the stronger core answer for this two-response item.
References/topics: Value Methodology Definition; Multidisciplinary Team; Function/Resource Relationship; VM Job Plan; VM Programs.
At a VM study implementation meeting the VM facilitator is asked to make a five-minute presentation. The presentation should
focus on the VM study job plan.
explain how the Value Methodology works.
highlight the strengths of each VM team member.
demonstrate that the VM team understood objectives of the VM study.
The correct answer is D. demonstrate that the VM team understood objectives of the VM study . At an Implementation Meeting, the decision-makers are not primarily looking for a training session on Value Methodology or a review of the VM Job Plan. They need confidence that the VM study results are grounded in the actual project objectives, constraints, required functions, and success criteria.
A five-minute presentation must be concise and decision-focused. The facilitator should quickly show that the VM team understood the study scope, owner goals, performance needs, cost drivers, risks, and implementation expectations. This builds credibility before decision-makers review the disposition of VM proposals.
Option A is incorrect because the Job Plan explains the process, but implementation decision-makers need results and alignment, not a phase-by-phase lecture. Option B is also too broad for a five-minute implementation presentation. Option C is inappropriate because the meeting is not about individual team-member recognition. The strongest presentation is one that links the VM recommendations back to the study objectives and shows that the team’s proposals support those objectives.
References/topics: Implementation Phase; Implementation Meeting; VM Proposal Disposition; Study Objectives; Decision-Maker Confidence.
What is the most appropriate description of the Information Phase?
Make sure management agrees with the topic being studied
Confirm timing of Job Plan phases with the customer
Gather, organize, review, and transform data collected
Collect and restructure data to support the function analysis phase
The most appropriate description of the Information Phase is to gather, organize, review, and transform data collected . In the Value Methodology Job Plan, the Information Phase begins the formal Value Study and is used to complete the data package that was initiated during the Pre-Study/Preparation work. The SAVE Value Methodology Standard identifies the Information Phase under the Value Study and lists its immediate output as completing the data package and modifying the scope when needed. ( UW Courses )
This phase is not merely administrative scheduling or management approval. Its purpose is to ensure the team has a clear factual basis before moving into Function Analysis. The project sponsor or designer may brief the team, the team asks questions based on prior data research, site visits may be completed, improvement targets such as value, cost, performance, and schedule are agreed, and the scope is reviewed based on new information. ( UW Courses )
Option A and B are mainly Pre-Study/Preparation activities. Option D is partially related, but too narrow because the Information Phase supports the entire study, not only Function Analysis.
References/topics: Information Phase; Value Methodology Job Plan; Data Package; Scope Review; Study Targets.
Which of the following should be considered when preparing the VM study report?
Choose 3 answers.
Identifying non-study focus groups
Status of the VM study subject
Using technical language
Focusing on the typical audience of stakeholders and project managers
Creating a document for those not involved in the VM study
The correct answers are B, D, and E . The VM study report is a formal communication tool prepared after the study to document the study process, findings, developed proposals, expected benefits, implementation considerations, and decision-support information. Therefore, the status of the VM study subject must be considered because the report should reflect the current condition, design stage, project phase, constraints, assumptions, and decisions affecting the subject.
The report must also focus on the typical audience of stakeholders and project managers . These readers need clear, usable information to understand the value opportunities, proposal rationale, cost/performance impacts, and implementation requirements. The report should support management action, not simply record technical discussion.
Option E is also correct because the report should be understandable to people who were not directly involved in the VM study . A good VM report allows future reviewers, decision makers, implementation teams, and auditors to understand what was studied, what alternatives were recommended, and why.
Option A is incorrect because “non-study focus groups” are not a primary consideration in preparing the study report. Option C is incorrect because excessive technical language can reduce clarity; the report should be clear, concise, and audience-focused.
References/topics: Presentation Phase; VM Study Report; Stakeholder Communication; Proposal Documentation; Decision Support.
Some stakeholders disagree with their level of involvement in the VM study scope. What tool could the VM facilitator use to focus the group?
Work breakdown structure
SWOT analysis
RACI matrix
Paired comparison
The correct answer is C. RACI matrix . When stakeholders disagree about their level of involvement, the facilitator needs a tool that clarifies roles, responsibility, authority, consultation, and communication expectations . A RACI matrix directly addresses this issue because it defines who is Responsible , Accountable , Consulted , and Informed for each activity or decision. In VM and VE practice, a RACI matrix is specifically used to identify who is responsible for implementation, who is accountable for costs and outcomes, who needs to be consulted during VM/VE studies, and who needs to be kept informed.
This makes RACI especially useful when involvement levels become controversial. It gives the facilitator a neutral structure to move the group away from personal preference and toward agreed participation logic. It also helps prevent over-involvement, under-involvement, unclear decision authority, and unnecessary stakeholder conflict.
A work breakdown structure defines work packages, not stakeholder engagement levels. SWOT analysis examines strengths, weaknesses, opportunities, and threats, but does not assign participation roles. Paired comparison is used for prioritizing options or criteria, not resolving involvement disagreements.
References/topics: VM Facilitation and Team Dynamics; Stakeholder Engagement; Study Scope Alignment; RACI Matrix; VM Program Governance.
A VM program’s standard operating procedures should include
a requirement that each VM team member be independent from the development team.
how subjects for VM studies are identified.
a listing of standard functions to be included in a VM study.
a required number of creative ideas to be generated in a study.
The correct answer is B . A VM program’s standard operating procedures should define how candidate subjects or projects are identified, screened, selected, prioritized, and authorized for VM studies. This belongs to VM program governance because limited VM resources must be applied to subjects with appropriate scope, timing, information availability, organizational importance, and value-improvement potential. SAVE’s Value Standard states that the standard assists managers and value program managers in applying VM within organizations in a consistent manner, and also guides practitioners and managers in determining when to apply VM to a project to maximize innovation and implementation benefits. ( wsdot.wa.gov )
Option A is too rigid. SAVE recognizes multidisciplinary teams of experienced professionals and stakeholders; people outside the project may be added for perspective, but every team member is not required to be independent from the development team. ( wsdot.wa.gov ) Option C is incorrect because functions are not pre-listed generically; they are identified specifically for the study subject during Function Analysis. Option D is also incorrect because creativity should encourage broad idea generation, but the SOP should not prescribe a fixed number of ideas as a universal requirement. VM procedures should standardize the management process, not force artificial technical outputs.
References/topics: VM Programs; Program SOPs; Study Subject Identification; Value Program Management; Study Selection Criteria.
The left project scope line is located between the
Subject objectives and all-the-time functions
Secondary and lower order functions
Higher order and basic functions
Basic and secondary functions
The correct answer is C. Higher order and basic functions . In FAST diagramming, the project scope is shown by vertical scope lines that define the portion of the function logic included in the value study. The left project scope line separates the broader reason for the study from the functions that are actually inside the study boundary.
The higher order function is placed outside the left scope line because it answers the “why” question for the basic function. It represents the larger objective or purpose that the basic function supports. FAST guidance states that highest-order functions appear outside the left scope line and to the left of the basic functions. ( )
The basic function is placed immediately to the right of the left scope line. It represents the primary purpose or mission of the subject under study. The FAST reference specifically states that basic functions immediately to the right of the left scope line represent the purpose or mission of the subject. ( )
Therefore, the left project scope line is located between the higher order function and the basic function .
References/topics: Function Analysis Phase; FAST Diagramming; Project Scope Line; Higher Order Function; Basic Function; How/Why Logic.
What is the role of the VM facilitator during the Development Phase?
Choose 2 answers.
Review VM proposals
Prepare VM proposals
Rewrite VM proposals
Research VM proposal background
The correct answers are A. Review VM proposals and C. Rewrite VM proposals . During the Development Phase, selected ideas are converted into formal VM proposals with enough documentation for decision makers to determine whether implementation is justified. SAVE’s VM Standard Reference states that, in this phase, the VM study team develops selected ideas into VM proposals with sufficient documentation for implementation decisions.
The facilitator’s role is not to become the technical author or researcher for each proposal. Instead, the facilitator manages the process, maintains consistency, reviews proposal quality, checks clarity, confirms that required elements are included, and helps revise or rewrite proposal narratives so they are understandable, complete, and decision-ready. This aligns with the facilitator’s broader duty to lead the multidisciplinary VM process, keep the team disciplined within the Job Plan, and ensure outputs support value-based decisions. SAVE describes VM as a systematic process used by a multidisciplinary team led by a qualified VM facilitator.
Option B is incorrect because proposal preparation is primarily the responsibility of assigned team members or technical specialists. Option D is incorrect because background research is normally performed by the proposal owner or subject-matter experts, not by the facilitator as a primary role.
References/topics: Development Phase; VM Proposal Development; VM Facilitator Role; Proposal Review and Revision; VM Job Plan.
Which of the following is the VM facilitator’s role during the Implementation Phase?
Guide disposition
Assess VM proposals
Develop implementation plan
Sell ideas
The correct answer is A. Guide disposition . During the Implementation Phase, the VM facilitator’s role is not to make the final decision, sell the recommendations, or personally perform management’s implementation duties. The facilitator guides the structured process so that each value alternative is reviewed, assigned a disposition, and moved toward an appropriate decision. SAVE guidance states that, after delivery of the preliminary report, management and the project team should consider and agree on which value alternatives will be implemented and determine how and when implementation will occur. It also identifies a common implementation activity as conducting an implementation meeting to determine the disposition of each value alternative . ( )
Option B is incorrect because assessment and approval of VM proposals belong primarily to management and responsible project stakeholders. Option C is not the facilitator’s primary role; implementation planning is established and managed by those responsible for executing accepted changes. Option D is incorrect because VM facilitation requires objectivity. The facilitator supports informed decision-making, not advocacy or salesmanship. The facilitator keeps the process disciplined, ensures proposals receive fair consideration, and helps document acceptance, rejection, action responsibility, and follow-up.
References/topics: Implementation Phase; VM Facilitator Role; Disposition of Value Alternatives; Post-Workshop Activities; Implementation Meeting.
A VM study team member determined that the VM proposal will not meet the goals of the study subject. What should the VM facilitator do?
Choose 2 answers.
Document the reasons for not meeting the goals.
Review the results with the stakeholders.
Have the VM team member complete the VM proposal.
Disregard the VM proposal.
The correct answers are A and B . During the Development Phase , a VM proposal must be sufficiently developed to demonstrate that it supports the study objectives, required functions, performance expectations, constraints, risks, and value improvement goals. If a team member determines that a proposal will not meet the goals of the study subject, the facilitator should not simply discard it without traceability. The proper action is to document the reasons the proposal does not meet the goals. This preserves the analytical basis for the decision and shows that the alternative was considered objectively rather than rejected informally.
The facilitator should also review the results with stakeholders because the proposal may affect owner requirements, scope intent, user expectations, cost targets, or implementation priorities. Stakeholder review confirms whether the proposal should be revised, deferred, combined with another alternative, or formally eliminated.
Option C is incorrect because completing a proposal that is already known not to meet study goals wastes team effort unless stakeholders specifically redirect the team. Option D is incorrect because disregarding the proposal without documentation violates disciplined VM practice and weakens decision transparency.
References/topics: Development Phase; VM Proposal Development; Stakeholder Review; Value Alternative Validation; Documentation of Rejected Alternatives.
What are effective approaches used by the VM facilitator during the Evaluation Phase?
Choose 2 answers.
Recognize when the group is off-topic and redirect them.
Establish a clear context for the session.
Avoid discussion of additional or modified ideas.
Select a single evaluation technique to be used for the process.
The correct answers are A and B . During the Evaluation Phase , the VM facilitator’s role is to preserve structure, discipline, and decision quality while the team screens creative ideas for value-improvement potential. SAVE’s Value Methodology Standard defines the Evaluation Phase as a structured evaluation process used to select ideas that can improve value while still delivering required functions and respecting performance requirements and resource limits. ( )
Therefore, the facilitator must recognize when discussion becomes off-topic and redirect the group toward the agreed evaluation criteria, study objectives, required functions, and constraints. This prevents the phase from becoming another brainstorming session or an unstructured debate. The facilitator must also establish a clear context for the session , meaning the team understands what is being evaluated, against which criteria, and for what decision purpose.
Option C is incorrect because evaluation may include clarification, combination, or refinement of ideas; useful modifications should not be automatically blocked. Option D is also incorrect because VM allows tailored application of methods, and the facilitator should select techniques appropriate to the study rather than force one universal technique. ( )
References/topics: Evaluation Phase; VM Facilitation; Idea Screening; Evaluation Criteria; Team Focus and Direction.
Which type of cost is calculated for study items by multiplying the unit cost by the number of units produced per year?
Total costs
Life-cycle costs
Incremental unit costs
Annualized costs
The correct answer is D. Annualized costs . In VM cost analysis, when a study item has a known unit cost and a known annual production quantity , multiplying the two gives the cost impact over one year. That makes the result an annualized cost , because the calculation converts a per-unit value into a yearly cost basis.
This distinction is important in manufacturing or repetitive-process VM studies. A component may appear inexpensive on a unit basis, but if it is used thousands or millions of times per year, its annualized cost may become a major value-improvement target. SAVE’s VM Glossary defines cost as the monetary valuation of resources consumed in the production or delivery of a project, product, or process, and it also recognizes annualized cost as a cost expression used in life-cycle cost measurement. ( )
Option A, total costs , is too broad because it may include many cost categories and periods. Option B, life-cycle costs , covers acquisition, operation, maintenance, replacement, and disposal over time. Option C, incremental unit costs , concerns the cost of an additional unit, not annual volume impact.
References/topics: Information Phase; Cost Data; Cost Modeling; Annualized Costs; Manufacturing Study Items.