For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?
Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?
Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?
When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?
What information is required when adding a new space within a facility to the ENERGY STAR® Portfolio Manager?
Which of the following is a low impact development (LID) technique for rainwater management?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?
Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?
Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?
Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\
A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?
Which of the following environmental concerns is exacerbated by impervious surfaces?
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection
Guidance, which rating system would be most applicable for this project?
What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?
For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
The decision to replace Chlorofluorocarbon (CFC) and Hydrochlorofluorocarbon (HCFC) refrigerants with alternative refrigerants
The Materials and Resources (MR) section includes which of the following building products in Credit calculations?
An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.
How many occupants should be entered into Portfolio Manager for the vacant office space?
A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they
Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?
Instituting a policy to prevent erosion and sedimentation and restore any eroding soils is a requirement of which credit or prerequisite?
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
What requirement must be met when creating a demand response program that satisfies Energy and
Atmosphere Credit, Demand Response?
The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to
equal or be greater than 5%. Which strategy can the team implement to achieve this goal?
According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?
A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?
The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the
Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?
What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?
Calculator
A management method that could be included in a project's site management policy is the use of
Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?
One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must
Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement
Plan?
Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources
Credit, Solid Waste Management - Ongoing?
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?
Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards
compliance for what category of building space?
For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?
How can a building owner promote both energy efficiency and thermal comfort in a building?