Certified Construction Manager (CCM) Practice Questions

The most impressive hallmark of Dumpspedia’s Construction-Manager dumps practice exam questions answers is that they have been prepared by the CMAA industry experts who have deep exposure of the actual Certified Construction Manager exam requirements. Our experts are also familiar with the Certified Construction Manager (CCM) exam takers’ requirements.

Construction-Manager CMAA Exam Dumps

Once you complete the basic preparation for Certified Construction Manager (CCM) exam, you need to revise the CMAA syllabus and make sure that you are able to answer real Construction-Manager exam questions. For that purpose, We offers you a series of Certified Construction Manager practice tests that are devised on the pattern of the real exam.

Free of Charge Regular Updates

Once you make a purchase, you receive regular Certified Construction Manager (CCM) updates from the company on your upcoming exam. It is to keep you informed on the changes in CMAA Construction-Manager dumps, exam format and policy (if any) as well in time.

100% Money Back Guarantee of Success

The excellent Construction-Manager study material guarantees you a brilliant success in CMAA exam in first attempt. Our money back guarantee is the best evidence of its confidence on the effectiveness of its Certified Construction Manager (CCM) practice exam dumps.

24/7 Customer Care

The efficient CMAA online team is always ready to guide you and answer your Certified Construction Manager related queries promptly.

Free Construction-Manager Demo

Our Construction-Manager practice questions comes with a free Certified Construction Manager (CCM) demo. You can download it on your PC to compare the quality of other CMAA product with any other available Certified Construction Manager source with you.

Related Certification Exams

Construction-Manager PDF vs Testing Engine

Unique Features of CMAA Construction-Manager PDF Exam Package and Testing Engine Package
PDF
Engine
Saving Your Exam Notes
Types of Questions Support
Both Construction-Manager PDF and Testing Engine have all the Real Questions including Multiple Choice, Simulation and Drag Drop Questions.
Free 3 Months Update
Free 3 Months CMAA Construction-Manager Exam Questions and Answers Update
We provide you 3 Months Free CMAA Construction-Manager Exam Updates at no cost.
100% Money back Guarantee and Passing Guarantee
100% CMAA Construction-Manager Money back Guarantee and Passing Guarantee
We provide you Construction-Manager practice questions with 100% passing Guarantee With Money Back Guarantee.
Fully Secure System of purchase
Fully SSL Secure System of Purchase for CMAA Construction-Manager Exam
Purchase Certified Construction Manager (CCM) Exam Dumps Product with fully SSL Secure system and available in your Account.
We Respect Privacy Policy
We Respect Privacy Policy
We respect full Privacy of our customers and would not share information with any third party.
Fully Exam Environment
Fully Exam Environment
Experience Real Exam Environment with our Certified Construction Manager (CCM) testing engine.
2 Modes to Practice Exam
2 Modes of Construction-Manager Practice Exam in Testing Engine
Testing Mode and Practice Mode.
We Respect Privacy Policy
Exam Score History
Our Construction-Manager Practice Questions Testing Engine will Save your Construction-Manager Exam Score so you can Review it later to improve your results.
Saving Your Exam Notes
Question Selection in Test engine
Our Test engine Provides Option to choose randomize and non-randomize Questions Set.
Saving Your Exam Notes
Saving Your Exam Notes
Our Construction-Manager Testing Engine provides option to save your exam Notes.
Construction-Manager Last Week Results!

10

Customers Passed
CMAA Construction-Manager

88%

Average Score In Real
Exam At Testing Centre

92%

Questions came word by
word from this dump

Certified Construction Manager (CCM) Questions and Answers

Questions 1

A CM is milling and paving a 2-mile-long bridge with a surface that is in total failure. The owner gave the contractor October 24 as the fixed completion date. Meanwhile, the owner has promised the public that work hours would be 7am–7pm, 5 days per week and that the bridge would be completed by September 1.

The bridge deck is poured on a steel grid deck, but this type of operation has never been performed in the state and complications from weather have slowed progress. The contractor has requested to work nonstop 24/7 to meet the deadline told to the public.

The CM should

Options:

A.

tell the contractor they have until September 1 and can only work 7am–7pm.

B.

discuss with the owner and tell the contractor to do only 1/2 of the bridge.

C.

meet with the owner and contractor to vet all issues/options and make a decision.

D.

meet with the contractor to go over realistic time frames and make a decision.

Questions 2

The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non-conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?

Options:

A.

Based on the engineer of record's recommendation, the contractor should develop a repair detail and submit for approval.

B.

The concrete should be chopped out, rebar dowels should be drilled into the new slab, and the repair detail should be implemented.

C.

The agency should accept as-is and rely on the primary system.

D.

All slab concrete should be removed.

Questions 3

While conducting an inspection of the work in progress for a design-bid-build project, a CM notices that some of the completed work does not conform to the construction documents. The FIRST thing the CM should do is

Options:

A.

document the non-conforming work and distribute the documentation to the contractor, design professional, and client.

B.

discuss the concerns with the owner.

C.

direct the contractor to correct the non-conforming work.

D.

schedule a meeting with the design professionals and the client to discuss the issues.