Certified Construction Manager (CCM) Practice Questions
The most impressive hallmark of Dumpspedia’s Construction-Manager dumps practice exam questions answers is that they have been prepared by the CMAA industry experts who have deep exposure of the actual Certified Construction Manager exam requirements. Our experts are also familiar with the Certified Construction Manager (CCM) exam takers’ requirements.
Construction-Manager CMAA Exam Dumps
Once you complete the basic preparation for Certified Construction Manager (CCM) exam, you need to revise the CMAA syllabus and make sure that you are able to answer real Construction-Manager exam questions. For that purpose, We offers you a series of Certified Construction Manager practice tests that are devised on the pattern of the real exam.
Free of Charge Regular Updates
Once you make a purchase, you receive regular Certified Construction Manager (CCM) updates from the company on your upcoming exam. It is to keep you informed on the changes in CMAA Construction-Manager dumps, exam format and policy (if any) as well in time.
100% Money Back Guarantee of Success
The excellent Construction-Manager study material guarantees you a brilliant success in CMAA exam in first attempt. Our money back guarantee is the best evidence of its confidence on the effectiveness of its Certified Construction Manager (CCM) practice exam dumps.
24/7 Customer Care
The efficient CMAA online team is always ready to guide you and answer your Certified Construction Manager related queries promptly.
Free Construction-Manager Demo
Our Construction-Manager practice questions comes with a free Certified Construction Manager (CCM) demo. You can download it on your PC to compare the quality of other CMAA product with any other available Certified Construction Manager source with you.
Related Certification Exams
Construction-Manager PDF vs Testing Engine










10
Customers Passed
CMAA Construction-Manager
88%
Average Score In Real
Exam At Testing Centre
92%
Questions came word by
word from this dump
Certified Construction Manager (CCM) Questions and Answers
A CM is milling and paving a 2-mile-long bridge with a surface that is in total failure. The owner gave the contractor October 24 as the fixed completion date. Meanwhile, the owner has promised the public that work hours would be 7am–7pm, 5 days per week and that the bridge would be completed by September 1.
The bridge deck is poured on a steel grid deck, but this type of operation has never been performed in the state and complications from weather have slowed progress. The contractor has requested to work nonstop 24/7 to meet the deadline told to the public.
The CM should
The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non-conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?
While conducting an inspection of the work in progress for a design-bid-build project, a CM notices that some of the completed work does not conform to the construction documents. The FIRST thing the CM should do is